Lead Acid Battery Installation Guidelines

Insert Confidentiality Level in slide footer


Batteries Acceptance

Batteries Power Cabinet Cooling Unit Installation Tools

Batteries Manufacture Cooling Unit


Power Cabinet Parameter Crimping tools
Date status

Number of PSU Status Cooling unit temp Torque range


Battery Voltage

CB and DC cables Temp. sensor Heat Shrink


Battery charging

Battery discharging

Charge / Discharge current

2 Monday, April 3, 2023


Batteries installation guidelines
• After following installation manual & Data sheet please consider below points during batteries installation and inspection.
• Use torque range to installed batteries nuts and bolts.
• Using proper crimping tools for DC cables lugs and heat shrink for DC cables isolation.
• Keep Safe distance between batteries 1CM minimum to safe batteries against thermal run away damage.
• Check all batteries manufacture date before installing them not exceed 2 years maximum.
• Matching the output voltage and current of power cabinet for each string and check its operation during charge/Discharge some
times controller need to be restarted after new parameter settings.
• Revise parameter setting before installing new batteries according to installation manual for each batteries type.
(Rectifier Float Voltage ,Boost Voltage, Equalized Voltage ,Charge current ,battery rated capacity and temperature compensation)
• Recommended Batteries ambient temperature25℃ and recommended operated range 25℃ ~ 28℃
• When the system has a high temperature disconnect the batteries at 60°C temperature in order to avoid thermal damage.
• Enable & activate Temperature compensation at ±25°C.
• Adjust battery rated capacity according to total number of batteries strings installed at power cabinet.
• Check batteries voltage before & after installation voltage difference to be maximum 0.15V/ 12V Block.
• Adjust LLVD and BLVD according to number of cascaded to avoid deep discharge.
• Check Cooling Unit/System operating condition before installing batteries and periodically follow it
Torque Ranges Values for each batteries
Please follow the product label applied directly on the battery for recommended torque values.
Batteries type Torque Value
NSB Blue+ 210Ah 8Nm
NSB Blue+ 100Ah 8Nm
Power Safe 190Ah 9Nm
Power Safe 100Ah 5Nm
Narada Acme190Ah 8Nm
Narada Acme100Ah 8Nm
United battery UB 190 8Nm
United battery UB 100 8Nm Torque range for battery nuts and Hydraulic Battery DC Cable Lug
bolts Terminal
Lead Acid Batteries Parameter setting @ 25°C
Batteries Types Float Voltage Equalized Voltage Boost Voltage Charge Current Temp Torque
Constant charge Volt Compensation range

NorthStar Blue+ 210Ah 54.48 56.4 56.4 Unlimited 4 mV/cell/°C


96mV/String/°C 8
NorthStar Blue+ 100Ah 54.48 56.4 56.4 Unlimited 4 mV/cell/°C
96mV/String/°C 8
Power Safe 190Ah 54.48 56.4 56.4 Unlimited 4 mV/cell/°C
96mV/String/°C 9
Power Safe 100Ah 54.48 56.4 56.4 Unlimited 4 mV/cell/°C
96mV/String/°C 5
Narada Acme190Ah 54 56.4 56.4 MaX
47.5h (0.25C)
4 mV/cell/°C
96mV/String/°C 8
Narada Acme100Ah 53.52 56.4 56.4 Max
25h (0.25C)
4 mV/cell/°C
96mV/String/°C 8

UB 190Ah 54.48 56.4 56.4 MaX


47.5h (0.25C)
4 mV/cell/°C
96mV/String/°C 8
UB 100Ah 54.48 56.4 56.4 Max
25h (0.25C)
4 mV/cell/°C
96mV/String/°C 8
Batteries Parameters settings
• The optimum level for float charging is 2.27VPC ±0.02VPC at +25°C (Float Voltage 54.48V)
• Boost voltage (equalize) recommends 2.35 VPC as boost voltage at +25°C (Boost or Equalize Voltage 56.4V)
• Boost or Equalize voltage shall be limited to the boost voltage level and shall be from 6 to 16 hours.
• The optimum level temperature +25°C (+77°F). If the Battery temperature increases above this level, a thermal compensation of -4
mV/cell/°C is recommended for safe operation ,and if the temperature decreases below 25°C, the voltage should be increased by 4
mV/cell/°C.(compensation coefficient 96mV/deg.C)
• Recommended Charge current for float application 0.25C(total batteries capacity/4)
• Battery rated capacity (according to Power cabinet Type).
1st (enter single battery string capacity and number of battery strings)
2nd (enter total battery capacity) for example ( total rated capacity for site has 2 battery strings 200Ah =400Ah)
• BLVD and LLVD to be adjusted as per below for both cascaded and normal sites.

Parameter Normal Sites Cascaded Sites


LLVD(Radio Loads Disconnect) 44.4V 45.6V
BLLVD(TRM Loads Disconnect) 43.2V 42
Batteries Spacing for air and cooling Process (1CM)
• When received Batteries a visual check should be made on the
Batteries If the batteries show transportation damage,
physical damage to the case, leaking electrolyte etc. they
should not be installed and a claim should be initiated
Over charge/Undercharge impact on battery life time

Optimum
Area of ‘stability’ ±0.02V
% F loa t L if e

Overcharge
Undercharge Corrosion/Dry out
Sulphation, Corrosion

2.20 2.25 2.30 2.35 2.40 2.45

Float Voltage /VPC


temperature Impact on battery life time

• Batteries are electrochemical devices, so it is recommended to operate the batteries within 20-
25ºC
For example, if the temperature rises from the recommended operating temperature of +25°C, to
+45°C, the expected battery life will decrease from 10 to 2 years
Lithium 48100Ah Huawei , Narada and ChinaShoto Power System Parameters
settings

Parameters Standard Value Huawei Narada China Shoto

Single battery Capacity 100 Ah 100 Ah 100 Ah

Equalized charge voltage 53.5 V 54.1 V 54 V

Float charge voltage 53.4 V 54 V 52 V

Standard charge current 0.2C 0.2C 0.2C

Batteries Types Normal Site High cascaded site

Huawei Lithium 100A BLVD:45V BLVD:45V


LLVD :46V LLVD :48.3V
ChinaShoto Lithium 100A BLVD:44V BLVD:44V
LLVD :45V LLVD :47V
Narada Lithium 100A BLVD:45V BLVD:45V
LLVD :46V LLVD :47.4V