You are on page 1of 22

PROPOSAL FFT Reviewer Specified To CSTS JO TEP LNG EPC

1. Safety Moment
Executive Summary

Contract no :
Subject : Requisition for FFT Reviewer

MP responsible for performing :


FFT Review
AGENDA

1. Introduction MP 4M Integrated Health Services


2. Work Location
3. Estimated Time
4. Scope of Work : Objectives & Description
5. Proposed Implementation Plan
OPERATIONAL SYNERGY – 4M & BEYOND

MED CENTRE MED SITE


Medical Emergency (MERP) Medicine
Specialist Panel Fit to Work /
Vaccination
Health Certificate Occupational Health Program(OH) Clinic/Portacamp/First Aid Post & Equipment
Drug & Alcohol test Industrial Hygiene (IH)
Personnel (OH, GP, Nurse, etc.)
Treadmill
Communicable Disease Control (CDC)
ECG Onsite MCU SOP & Health Safety Environment (HSE)
Cardiologist Radiologist

Radiology
Audiometry

Ophthalmologist Internist
Laboratory
Paperless Clinic
24/7 SUPPORT
and many other specialties
Dentistry E-Medical Record
Expat Doctor
(phone only) Tonometry OGUK-Petronas-AME

HELPLINE CENTRE +62-21-300-14-911

MED EVACUATION CALL CENTRE +62-21-294-10-275 MED ADMIN

OPS &
HQ

CORPORATE /
Emergency Medical PERSONAL
Critical Care > 1000 Affiliated Health
Ambulance Medical TravelllingTravelling Case GL /Automatic
Equipment Air Chartered & Providers MEMBERSHIP
Document support Concierge all over Indonesia & Monitoring CASHLESS Transaction
Commercial (Escort)
overseas

Bed to Bed Transfer


Repatriation

QHSE PHARMACY
Quality, Health, PBF – Outlet – Online TRAINING
OGUK CERTIFICATION

OGUK is a UK standard for Oil and Gas field Medical Examination


MP Personnel as MCU doctor who certified OGUK and has registered
at OGUK web is dr. Irwan B Hasyim MSc
Since 2010
With registration number: OGUK/2010/1598

6
Work Location:
CSTS Office at Indy Office Jakarta
Estimated Time

Project is planned over a period of 6 months


starting from Nov 2016.
Scope Of Work
General

• Provide FFT Review

Personnel

• OH Doctor
• Nurse

Specific

• OBJECTIVE
• The purposes of Fitness for Task Medical Reviewer are:
• To ensure each medical check up result is complete (covers all areas for the work task proposed),addresses all of the medical metrics
required a by and carried out correctly by doctors with the required qualifications and experience
• In order to all employees of CSTS, either permanent, TPC, contractors, and the visitor do the fitness for task examination and can
working according with their respective task.

• SCOPE
• Fitness For Task Medical Reviewer scope is:
• Reminding FFT Procedures
• FFT results Delivery
• Determination of the fitness status
• Update medical certificate expenditures
• Update logbook (in Excel format)
MCU Packag e s o f Fit Fo r Tas k
Note : Fitness declaration to work in Tangguh is solely determined by BP Doctors

Fit For Task- Remote Site-Tangguh Additional Specific Test Required For Fit For Tasks

Remote Site Package+ Specific


Remote Site Package No Specific task or workers Reference
Item
Remote Site
No Examination items 1 Remote Site Worker Remote Site Package
FFT guidelines
Distant Vision, Visual field, Color
Heavy Equipment Ops/Crane operators and Blindness test (Depth perception and CCO and
1 Medical History / Health Assessment 2
Professional Drivers & Skippers light reflex optional), audiometry + DVLA
Questionaire
2 Complete Physical Examination 3 Work at Height (Scaffolders, riggers, etc) Romberg test + Questionaire Not specific

3 Chest X - Ray 4 SCBA/Respirator users/Confine space Spirometry + Questionaire Not specific

Worker <40 year old require ECG


4 5 Fire & Emergecy crew NFPA standards NFPA-1582
Worker >40 year old require cardio treadmill stress test
Stool test &culture(Typhoid cultures), Government
5 Complete Blood Count - CBC(haematology) 6 Food Handlers
6 monthly Regulation
6 Urinalysis (semiquantitative & microscopic) 7 Medical Professionals HBsAg status Not specific
Remote Site Package +
7 Liver function ( SGPT, SGOT) 8 Shift Workers Not specific
Questionaire
8 Lipid profile( Tot. cholesterol, HDL, LDL, Trigliserida ) 9 Visitors Visitor package OGUK
9 Blood Sugar ( fasting, 2h pp) 10 Other professionals refer to relevant professional body requirements
10 Renal function (Ureum, Creatinin, Uric Acid)
BASIC PARAMETER MCU
MCU - Preemployment/Exit MCU -Visitor at remote area/ working at non remote
No Type of test OGUK or Equivalent

1 Medical History No Examination items

2 Complete Physical Examination 1 Medical History/ Health Assessment


3 Chest X - Ray 2 Complete Physical Examination
Worker <40 year old require ECG
4 3 Chest X - Ray
Worker >40 year old require cardio treadmill stress test
5 Complete Blood Count - CBC(haematology) 4 ECG
6 Urinalysis (semiquantitative & microscopic) 5 Complete Blood Count - CBC(haematology)
7 Liver function ( SGPT, SGOT) 6 Urine analysis (Semiquantitative & Microscopic)
8 Lipid profile ( Tot. cholesterol, HDL, LDL, Trigliserida )
9 Blood Sugar (fasting, 2h after meal) Note : see additional specific required test
10 Renal function: Ureum, Creatinin, Uric Acid to complete examination to specific task
11 Spirometry
12 Audiometry
MCU RESULT CRITERIA
6.4 Fitness Categories
There are four fitness categories: fit, fit with restriction, temporarily unfit and permanently unfit. Promotion or demotion might happen among
each category. Only those who are Fit as remote site worker and Fit with restriction that are allowed to work at Tangguh LNG site.

 6.4.1 Fit
The employees are considered fit for the designated jobs, i.e. they are capable of doing their jobs without any restrictions.
 
6.4.2Fit with Restriction
Worker with restriction may be considered fit with one or several restriction for the designated jobs. Within this category, there is fit with
accommodation where the employees are considered to be fit for the designated jobs but they need certain accommodations of work environment
to accomplish their works. Worker with restriction may be temporary or with permanent restriction.
6.4.3 Temporarily Unfit
The employees are temporarily unfit for their designated jobs because for temporary:
• They cannot perform their tasks and/or they might endanger either their own health and safety or the health and safety of others,
• They have severe health risks that significantly increase the probability of having to be medical evacuated, but the health problem
may be recovered for time which determined;
• They have contracted either a waterborne or airborne disease, but the disease may be recovered for time which determined.
• For remote site workers who cannot meet the FFT requirements for remote site workers will be considered temporary unfit.
• CSTS Employee that are temporary unfit for Tangguh or remote site, when recover to some extent, may be considered fit for
Jakarta office assignment if appropriate.
6.4.4Unfit
The employees are permanently unfit for their designated jobs because permanently:
• They cannot perform their tasks and/or they might endanger either their own health and safety or the health and safety of
others;
• They have severe health risks which consider unmanageable at site and significantly increase the probability of having to be
medically evacuated;
13
14
15
OGUK DRUG TESTING PARAMETER

The drug test will, as a minimum, test for the following drug panel :
• THC
• Amphetamine
• Metamphetamine
• Cocaine
• Benzodiazepines
• Opiates
• Methadone

GC/MS confirmation should be performed for all positive results


EXAMPLE OF WORK INSTRUCTION

1. The FFT review process takes 3 working days after the FFT complete results
received by the FFT officers, and can be conducted only on weekdays (Monday-
Friday) and working hours (8:00 to 16:00 pm).
2. Capacity FFT team to review will be 40-50 review in every working day
3. MCU and job exposure results are in soft copy and hard copy sent to OH Nurse.
MCU Review System
MCU Result Diagnosis Module
Modules for analyzing the entire set
of supporting examination results to
determining conclusion and patient
health status. In this module, doctor
can review and analyzing all
integrated examination result.

18
MCU Result Print Module

Module to review all examination result has been


inputted, and printed to be MCU report centrally,
this module is integrated to all examination
support module, included to laboratory
information system

19
20
21
THANK YOU

You might also like