Professional Documents
Culture Documents
OSHA Working at Height
OSHA Working at Height
Investigation Equipment
The Investigator should have access to the following
equipment :
Camera
Pen and Paper
Tape Measure
Barrier Tape
Torch
Full set of PPE
Watch
Mobile Phone/ Two Way Radio
Vehicle
Leighton Contractors Indonesia
Observations
Make sure the incident scene is safe before entry and
assist any injured people
Secure the incident scene
Stop people entering the scene
If necessary, erect barrier tape
Preserve the incident scene
Photographs
Sketches
Measurements
Record critical information (weather conditions, time, etc.)
Identify possible witnesses
Record their names
Leighton Contractors Indonesia
Evidence
Search for evidence at the scene
Take samples and arrange analysis
Search for evidence removed from the scene
Training records
Maintenance records
Personal factors
JSA’s
Personal Employment file
Leighton Contractors Indonesia
Interviewing Witnesses
A Witness is any person who:
Saw
Felt
Heard
Smelt
Interviewing Technique
Make the witness feel at ease :
Build trust and establish rapport
Explain the reason for the interview
Be honest
It must be positive, otherwise witnesses may not provide all the
information
Have a planned list of questions
So you don’t forget things to ask
To ensure completeness of the interview
Ask open questions with the following leading words:
What?
Where?
How?
When?
Who?
Leighton Contractors Indonesia
Interviewing Technique
Don’t make any comment about “blaming" any
person during the interview
Record the witness statement
Read the statement back to the witness
Seek confirmation of correctness
Ask the witness to sign the statement
Ask the witness to get back to you if he/ she recalls
any further information
Thank the witness at the end of the interview
Leighton Contractors Indonesia
Unsafe JSA
Behavior
Personal
Factors
Evidence
INCIDENT
Maintenance
Records
Unsafe Inspection
Conditions Records
Analysis
Reports
Leighton Contractors Indonesia
Draw Conclusions
Conclusions need to be drawn based on factual
evidence
Determine all causation factors
Immediate causes
Basic causes
Control causes
Recommend short and long term remedial actions to
control causes and to make improvements in:
System
Personal and job factors
Conditions and practices
Leighton Contractors Indonesia
Communication
Make recommendations to management for
improvements and set a timeframe for completion
Communicate changes and control measures to the
workers at tool box talks, pre-start meetings etc.
Complete an Incident Alert for all PD Class1&2 and
NII Class1&2, post it on notice boards and the PM to
forward it to Regional HSE Manager, LAS for
distribution throughout the Group
“Follow up” close out form to be returned within 7
days
Leighton Contractors Indonesia
Trends
Analyse all causal factors and graph trends
Discussion item at monthly HSE committee meetings
Develop Action Plans to reverse trends
THANK YOU