Pendahuluan Total Productive Maintenance
Nilai tambah yang disumbangkan oleh equipment ini akan berkurang secara
signifikan oleh adanya WASTE dan 6 BIG LOSSES
1. QUANTITATIVE
Meningkatkan jumlah jam kerja dari peralatan
2. QUALITATIVE
Mengurangi jumlah barang rusak, stabilisasi proses, perbaikan kualitas
Aktifitas TPM
Six Big Losses Total Productive Maintenance
4. Speed Losses
Aktifitas TPM
Production Time Frame Total Productive Maintenance
Working time
Planned
Loading time Downtime
Downtime
Operation time losses
Speed
Net Operation time losses
Aktifitas TPM
OEE Formula Total Productive Maintenance
OEE Formula
Aktifitas TPM
Planned Downtime Total Productive Maintenance
Planned Downtime
5R
Management meeting
Preventive Maintenance
Aktifitas TPM
Downtime Losses Total Productive Maintenance
Downtime losses
Breakdowns
Aktifitas TPM
Speed Losses Total Productive Maintenance
Speed losses
Reduced speed
Aktifitas TPM
Quality Losses Total Productive Maintenance
Quality losses
Startup losses
Aktifitas TPM
Availability Total Productive Maintenance
Operation time
= X 100 %
Loading time
Aktifitas TPM
Performance Rate Total Productive Maintenance
Aktifitas TPM
Quality Rate Total Productive Maintenance
Jumlah produk yang bagus = Input – (startup defect + process defects + trial products)
Aktifitas TPM
Contoh perhitungan OEE Total Productive Maintenance
HASIL PRODUKSI
Model A Model B Model C Total
Target produksi 800 400 400 1600
Hasil produksi 750 420 380 1550
Working time 180 120 150 450
Planned downtime 10 5 5 20
Loading time 170 115 145 430
Downtime (model change) 10 10 20
Downtime (breakdown) 12 6 18
Operating time 158 105 129 392
Ideal cycle time 0.2 0.23 0.27 0.23
Loss produksi 50 -20 20 50
Aktifitas TPM
Contoh perhitungan OEE Total Productive Maintenance
KERUSAKAN PRODUK
CACAT Model A Model B Model C Total
Dimensi 3 1 4
Fungsi 3 3
Fisik 2 2
TOTAL 3 5 1 9
Aktifitas TPM
Contoh perhitungan OEE Total Productive Maintenance
Operation time
Availability = x 100 % = 392 x 100 % = 91.2 %
Loading time 430
= 90.9 %
Produk yang bagus 1600 - 9
Quality Rate = x 100 % = x 100 % = 99.4 %
input 1600
= 82.4 %
Aktifitas TPM