DEVELOPMENT PLANNING
1
OUR ENGINEERS
2
OUTLINE
Field
Project
Innovation Conclusion development
Schedule
Scenario
3
COMPANY PROFILE
4
GEOLOGICAL FINDINGS AND REVIEW
Geological Review
The Exmouth Sub-basin, located in the
southernmost part of the Northern Carnarvon
Basin, is composed of the northeast-southwest
trending Jurassic syn-rift. Water depths within
the sub-basin range from approximately 100 to
more than 2,000 m. This sub-basin is bounded
by the Alpha Arch to the east and the Exmouth
Plateau to the northwest. The Alpha Arch forms
the boundary between the Exmouth Sub-basin
and the Barrow Sub basin, and the Kangaroo
Syncline forms the boundary between the
Exmouth Sub-basin and the Exmouth Plateau.
Figure Geological Regional of the Exmouth Sub-Basin
(modified from Tindale et al., 1998; Geoscience Australia, 2010)
5
GEOLOGICAL FINDINGS AND REVIEW
Stratigraphy Coloum
6
RESERVOIR DESCRIPTION
Initial Condition
7
RESERVOIR DESCRIPTION
8
RESERVOIR DESCRIPTION
9
RESERVOIR DESCRIPTION
Routine Core
Graph Semilog Porosity and Compressibility
10
RESERVOIR DESCRIPTION
Routine Core
11
RESERVE AND PRODUCTION FORECAST
Initialization
12
RESERVE AND PRODUCTION FORECAST
History Matching
13
FIELD DEVELOPMENT SCENARIO
14
PROJECT SCHEDULE
15
CONCLUSION
• Based on the running results and analysis that has been obtained from the
initialization results, volumetric OOIP data of 40585559 STB and OOIP data
simulated results that have used sensitivity of 2.27% are 40597558 STB.
Percent of errors obtained by 0.030%.
16
CONCLUSION
• Recovery Factor :
Basecase : 5. %
Infill : 23 %
17
INNOVATION
18
THANK YOU