Qatar
Metito South Qatar
Overseas
Catchment Zone Framework
Table of Contents
2 Scope of Work 7
4 Organization Chart 9
5 Resources 10
Introduction
The objective of operation and maintenance for FS & SGW network assets are to meet current
and expected flow demands and to ensure fully operational condition before and during rain
event by planned regular inspections and applying preventive and corrective maintenance.
Scope of Work For Network
The Major Scope of works which shall include but not limited to the following:
• Operation & Maintenance Procedure.
• Inspection & Cleaning.
• CCTV Inspection.
• Condition Assessment.
• Third Party Survey.
• Rain Emergency Response.
Scope of Work For SGW & FS Network
The Major assets which shall include but not limited to the following:
SGW FS
Manhole & Pipeline Manhole & Pipeline
Gullies House Connection
Soakaways Deep Trunk Sewers
Storage Tanks Solid waste removal, sludge removal &
disposal
Outfalls All types of blockages removal
Rising Main
Swales, Culverts, Interceptors, EFA,
Lagoons, Catch pit
SGW & FS ASSETS
PTP-Barwa City PTP-Al Kharaana PSG RAUP1 PSG RAUP2 PSG RUP PSG MUP
Lagon
PS46/1
Taking over of FSPS and related network should be scheduled in phases based on the main forwarding station
OPERATION AND MAINTENANCE PLAN – NETWORK
Equipment :
S. SGW Equipment QTY S. FS Equipment Description QTY
N Description N
1 Combi 4 1 Combi 3
6
5 5 5 5
5
4
3 3 3 3 3 3
3
2 2
2
1 1
1
0 0
0
bi bi ng ng A w TV er
a on
m om tti tti TM rro CC cti
Co rC Je iJ
e Ar am t e
pe Bi
g in ith rC de
Su M w na k
up So ea
ck /L
Pi te
m
ys
l lS
t Ba
ar
Sm
Required Available
Resources Availability (SGW)
4.5
4 4 4
4
3.5
3 3
3
2.5
2 2 2
2
1.5
1 1 1
1
0.5
0 0 0
0
Combi Super Combi Big Jetting TMA Pickup with Arrrow CCTV Sonar Camera Smart Ball System/
Leak detection
Required Available
OPERATION AND MAINTENANCE PLAN – NETWORK
Foul Sewer Area engineer A2 Surface ground water will be split into two area
engineers , They will have an engineer to lead the
teams , the area is splitted according to pump stations
in the area
Surface Ground Water Area engineer 1
Group 1 Group 2
1. PS SW9 1. PS SW7
Foul Sewer network 2. PS IC25 UP 2. PS SW5
will be split into two 3. PS IC26 UP 3. PS SIC
area , A1 and A2 4. PS GJUP 4. PS BTT
Each area will have 5. PS RAUP 1 5.PS RAUP2
an engineer to lead
Surface Ground Water Area engineer 2
his team
Group 3 Group 4
1. PS RUP 1. PS GRAVEYARD
2. PS MUP 2. PS SHO8
3. SW1 3. PS SH10
4. PS OBA 4. PS SHO1
5. PS RCOM
Foul Sewer Area engineer A1
Indicative information , for details kindly refer to the technical deliverables
READINESS FOR RAINY SEASON
Inform supplier and staff to confirm readiness According to the Alert Level 1, 2, 3, 4 we
Monitoring the situation & Weather
Inform the staff and plan resource Forecasting in Alert level 1 and 2 and be ready
Weather for Baseline mobilization in Alert 3 , and Full
Mobilization on Alert 4
forecast
Mobilize All Emergency Staff, Hotspots Team ,
Updating and Reporting to client condition, photos , All Networks FS,SGW,TSE, PS, STP, PTP,
number of trips and pumps in operation RRRU, Customer Services Team as per the
plan.
Alert Continuous communication , and coordination
With DNMC/ SCADA Technical coordinators,
Closely coordination between Emergency Manager Updating all the assets operation condition and
with DNMC Emergency coordinator/ assets Status updating the mobilization to client.
through the SCADA
Incident Meeting Ashghal coordinator to confirm the
mobilization
Supervisor and engineers moving to confirm that all
Resources are available and performing Properly.
30
25
25
22
20
15
10
10
6
5 3 3 3 3
2 2 2
1 1 1 1 1 1 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0
• To assign Rain emergency manger for day and night shift that manage the overall resources
and communication between groups to control the flow
Group 1 - Network
• Tankers for hotspot- Already contract with suppliers on place – once the additional
hotspot mitigation plan is approved , the assignment of the contractor will take place and
update of day/night shift emergency team
• Diesel pumps –Available as per existing mitigation plan- additional will be deputed
according to revised mitigation plan
• Customer service team to attend any clogging and provide additional tankers to support
the customer complaint.
• Foul sewer network group to be available with super sucker and jutting to attend any line
blockage .
• Rainy season 2020 (To be discussed)
Indicative information , for details kindly refer to the technical deliverables