Qatar South Catchment Zone Framework

Qatar
Metito South Qatar
Overseas
Catchment Zone Framework
Table of Contents

6 Rain Emergency Preparation


1 Introduction

2 Scope of Work 7

3 SGW & FS Assets 8

4 Organization Chart 9

5 Resources 10
Introduction

OPERATION AND MAINTENANCE OF FS & SGW NETWORK

The objective of operation and maintenance for FS & SGW network assets are to meet current
and expected flow demands and to ensure fully operational condition before and during rain
event by planned regular inspections and applying preventive and corrective maintenance.
Scope of Work For Network

The Major Scope of works which shall include but not limited to the following:
• Operation & Maintenance Procedure.
• Inspection & Cleaning.
• CCTV Inspection.
• Condition Assessment.
• Third Party Survey.
• Rain Emergency Response.
Scope of Work For SGW & FS Network

The Major assets which shall include but not limited to the following:

SGW FS
Manhole & Pipeline Manhole & Pipeline
Gullies House Connection
Soakaways Deep Trunk Sewers
Storage Tanks Solid waste removal, sludge removal &
disposal
Outfalls All types of blockages removal
Rising Main
Swales, Culverts, Interceptors, EFA,
Lagoons, Catch pit
SGW & FS ASSETS

SGW Network FS Network


Qatar South
Qatar South
Description Unit Quantity / Asset
Rising Mains (Including Description Unit Quantity / Asset
Valve Chambers / Metres 15,485
Discharge Chambers)
Rising Main (Including
Sewer Pipe (Including Valve & Discharge Metres 93,770
Metres 719,027 Chambers)
Micro Tunnels
Gully Nos 46,589
Injection well Nos 13 Sewer Pipe (Including
Micro Tunnels Metres 1,132,879
Manhole(Including Micro Nos 12,812
Tunnel MH)
House Connection Pipe Metres 330,078
Pumping Station Nos 18
Outfall Nos 11 House Connection MH Nos 32,462
Culverts Nos 0
Soakaways Nos 14,183 Foul Sewer Manhole
EFAs Nos 0 (Including Micro Tunnel Nos 29,232
MH)
Tanks Nos 39
Lagoons Nos 0
FS Pumping Station Nos 54
Interceptors Nos 0
Swales Nos 0 FS Lagoons/Tanks Nos 6
QATAR SOUTH FS & SGW ASSETS
PSG GY PSG IC25 PSG IC26 PSG RCOM
STW-IA
Ras Abu Fontas PTP

PS IA2 PSG SW1 PSG- SW5 PSG SW7 PSG SW9


PS RAF-A
PS-Labour PS SCS1
City
PS RAF-B PSG -SHAFT
PSG-SHaft01 PSG-SHaft10 PSG BTT
08
PS 57 PS SCS2

PSG JUP PSG OBA PSG SIC


PTP-Barwa Village PTP-Barwa Mesaimeer PTP-Barwa Al Barahaa

PTP-Barwa City PTP-Al Kharaana PSG RAUP1 PSG RAUP2 PSG RUP PSG MUP

Lagon

Foul Sewer Water Surface Ground Water


• Stand alone assets as SGW-PS and NETWORK -can be taken over immediately after current rainy season and kahramaa
Meter changed.
QATAR SOUTH FS & SGW ASSETS
DS-STW

PS44 PS46 PS30 PS40

PS46/1

PS40A PSW1 PS17 PS16


PS20/1
PS17/1
PS6 PS30/2 PS11 PS30/1 PS40/1 PSWH
PS8
PS17/2
PS41 PSW12
PS20/2
PS1 PS10 PS17/3
PSW2 PS2
PS40/2
PSW7 PS17/4
PS3N
PS21/N PSW3 PS8/8 PS8/1 P8/6
PS44A
PSW6
Slaughter House PS3/1 PS9 PS8/7A PS5/5B PS8/5A
PS28
PTP PSW5
PS21/1

Taking over of FSPS and related network should be scheduled in phases based on the main forwarding station
OPERATION AND MAINTENANCE PLAN – NETWORK

GROUP 1 – FS NETWORKS ORGANIZATION CHART


OPERATION AND MAINTENANCE PLAN – NETWORK

GROUP 1 – SGW NETWORKS ORGANIZATION CHART


Resources

Equipment :
S. SGW Equipment QTY S. FS Equipment Description QTY
N Description N

1 Combi 4 1 Combi 3

2 Super Sucker 2 2 Super Sucker 2


3 Big Jetting 5
3 Big Jetting 4
4 Mini Jetting 3
4 TMA 4
5 TMA 5
5 Pickup with Arrow 5
6 Pickup with Arrow 7
6 CCTV Van 1
7 CCTV Van 3
7 Sonar Camera 1
8 Sonar Camera 1
8 Smart Ball System/ Leak 1 9 Smart Ball System/ Leak 1
detection detection
Resources

S. Equipment Description QTY Equipment Purpose


N
1 Submersible Pump 4’’ 1 For Rainy season / Emergency
2 Submersible Pump 6’’ 1 For Rainy season / Emergency
3 Submersible Pump 8’’ 1 For Rainy season / Emergency
4 Diesel Pump 3’’ 9 For Rainy season / Emergency
5 Diesel Pump 4’’ 15 For Rainy season / Emergency
6 Diesel Pump 6’’ 20 For Rainy season / Emergency
7 Diesel Pump 8’’ 5 For Rainy season / Emergency
8 Diesel Pump 12’’ 1 For Rainy season / Emergency
9 Diesel Generator – capacity 350 1 For Rainy season / Emergency
KVA
10 Diesel Generator – Capacity 50 1 For Rainy season / Emergency
KVA
11 Diesel Light Tower 1 For Maintenance/ Emergency
Resources

S. Equipment Description QTY Equipment Purpose


N
12 6200 USG suction tanker 50 During Rainy season (Rain Alert)
13 6500 USG suction tanker 100 During Rainy season (Rain Alert)
14 Boom Truck 8 T 2 During Rainy season (Rain Alert)
15 Boom Truck 15 T 2 During Rainy season (Rain Alert)
Resources Availability (FS)

EQUIPMENT AVAILABILTY - FOUL SEWER NETWORK


7 7
7

6
5 5 5 5
5

4
3 3 3 3 3 3
3
2 2
2
1 1
1
0 0
0
bi bi ng ng A w TV er
a on
m om tti tti TM rro CC cti
Co rC Je iJ
e Ar am t e
pe Bi
g in ith rC de
Su M w na k
up So ea
ck /L
Pi te
m
ys
l lS
t Ba
ar
Sm

Required Available
Resources Availability (SGW)

EQUIPMENT AVAILABILITY - SGW NETWORK


5 5
5

4.5
4 4 4
4

3.5
3 3
3

2.5
2 2 2
2

1.5
1 1 1
1

0.5
0 0 0
0
Combi Super Combi Big Jetting TMA Pickup with Arrrow CCTV Sonar Camera Smart Ball System/
Leak detection

Required Available
OPERATION AND MAINTENANCE PLAN – NETWORK

GROUP 1 - NETWORKS( FSPS-SGWPS–SURFACE GROUND WATER )

Foul Sewer Area engineer A2 Surface ground water will be split into two area
engineers , They will have an engineer to lead the
teams , the area is splitted according to pump stations
in the area
Surface Ground Water Area engineer 1

Group 1 Group 2
1. PS SW9 1. PS SW7
Foul Sewer network 2. PS IC25 UP 2. PS SW5
will be split into two 3. PS IC26 UP 3. PS SIC
area , A1 and A2 4. PS GJUP 4. PS BTT
Each area will have 5. PS RAUP 1 5.PS RAUP2
an engineer to lead
Surface Ground Water Area engineer 2
his team
Group 3 Group 4
1. PS RUP 1. PS GRAVEYARD
2. PS MUP 2. PS SHO8
3. SW1 3. PS SH10
4. PS OBA 4. PS SHO1
5. PS RCOM
Foul Sewer Area engineer A1
Indicative information , for details kindly refer to the technical deliverables
READINESS FOR RAINY SEASON

Inform supplier and staff to confirm readiness According to the Alert Level 1, 2, 3, 4 we
Monitoring the situation & Weather
Inform the staff and plan resource Forecasting in Alert level 1 and 2 and be ready
Weather for Baseline mobilization in Alert 3 , and Full
Mobilization on Alert 4
forecast
Mobilize All Emergency Staff, Hotspots Team ,
Updating and Reporting to client condition, photos , All Networks FS,SGW,TSE, PS, STP, PTP,
number of trips and pumps in operation RRRU, Customer Services Team as per the
plan.
Alert Continuous communication , and coordination
With DNMC/ SCADA Technical coordinators,
Closely coordination between Emergency Manager Updating all the assets operation condition and
with DNMC Emergency coordinator/ assets Status updating the mobilization to client.
through the SCADA
Incident Meeting Ashghal coordinator to confirm the
mobilization
Supervisor and engineers moving to confirm that all
Resources are available and performing Properly.

Mobilize additional resources as and when needed


Maintenance team available to Monitoring and Emergency
Controlling all equipment and doing immediate action
to rectify and problems

Down Report to client total number of trips and running hours of


pumps
Continue removing the water till hotspot is cleared grade to
Alert
Update and report to client the status of active hotspot and
Obtain client zone coordinator signature in the report
the closed ones
Business
Survey the area and report to client any complain from
public or any additional flooded area as usual
Demobilize from site
Transfer any resources if needed to different location .
Indicative information , for details kindly refer to the technical deliverables
READINESS FOR RAINY SEASON

35 NO. OF FLOODING COMPLAINTS DURING RAIN EMERGENCY 2019


35

30
25
25
22

20

15
10
10
6
5 3 3 3 3
2 2 2
1 1 1 1 1 1 1
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0

Indicative information , for details kindly refer to the technical deliverables


READINESS FOR RAINY SEASON
Management
• To coordinate with group manager and Ashghal to obtain the data of the assets that will be
newly handed over to Metito .
• Manage the groups to develop the mitigation plan , get it non objected by client , assign
resources and keep additional resources under the control of management team to divert them
to support any group

• To assign Rain emergency manger for day and night shift that manage the overall resources
and communication between groups to control the flow

Group 1 - Network
• Tankers for hotspot- Already contract with suppliers on place – once the additional
hotspot mitigation plan is approved , the assignment of the contractor will take place and
update of day/night shift emergency team
• Diesel pumps –Available as per existing mitigation plan- additional will be deputed
according to revised mitigation plan
• Customer service team to attend any clogging and provide additional tankers to support
the customer complaint.
• Foul sewer network group to be available with super sucker and jutting to attend any line
blockage .
• Rainy season 2020 (To be discussed)
Indicative information , for details kindly refer to the technical deliverables