P-501 E-501 E-502 E-503 E-504 E-505 E-506 V-501 P-502


F-501 NOTES
CENTRIFUGAL PUMP HEAT EXCHANGER HEAT EXCHANGER HEAT EXCHANGER HEAT EXCHANGER HEAT EXCHANGER HEAT EXCHANGER VESSEL CENTRIFUGAL PUMP
DUTY DUTY DUTY DUTY DUTY SIZE, CAPACITY SIZE, CAPACITY FURNACE
SIZE, CAPACITY DUTY
DUTY
DES. PRES. @ TEMP SURFACE AREA SURFACE AREA SURFACE AREA SURFACE AREA SURFACE AREA SURFACE AREA DES. PRES. @ TEMP DES. PRES. @ TEMP ABBREVIATIONS
MAT. OF CONST. SHELL DES. PRES. @ TEMP SHELL DES. PRES. @ TEMP SHELL DES. PRES. @ TEMP SHELL DES. PRES. @ TEMP SHELL DES. PRES. @ TEMP SHELL DES. PRES. @ TEMP MAT. OF CONST. MAT. OF CONST.
INSULATION TUBE DES.PRES. @ TEMP TUBE DES.PRES. @ TEMP TUBE DES.PRES. @ TEMP TUBE DES.PRES. @ TEMP TUBE DES.PRES. @ TEMP TUBE DES.PRES. @ TEMP INSULATION INSULATION DES – DESIGN
1 MAT. OF CONST. (SHELL/TUBES) MAT. OF CONST. (SHELL/TUBES) MAT. OF CONST. (SHELL/TUBES) MAT. OF CONST. (SHELL/TUBES) MAT. OF CONST. (SHELL/TUBES) MAT. OF CONST. (SHELL/TUBES) . PRES – PRESSURE 1
INSULATION INSULATION INSULATION INSULATION INSULATION INSULATION
TEMP – TEMPERATURE
MAT – MATERIALS
CONST – CONSTRUCTION
REQT – REQUIREMENT
CAPACITY - Capacity (Flow and D/P)
790 FLUID
INSULATION - Insulation/Tracing
0003 PFD 2/N LEGEND
TO SOAKER
STREAM NO.

37.5
300
2 2
F-501 TEMPERATURE °C

PRESSURE BAR

3 3
29.65
260

3 2

E-506
V-501
4 4
E-505

300 E-504
37.5
P-502
E-503
5 5

E-502

6 BATANGAS STATE UNIVERSITY 6


E-501 The National Engineering University
Department of Chemical Engineering

CAPSTONE PROJECT
148.5 PROCESS FLOW DIAGRAM
VACUUM RESIDUE
UNIT 500
0000 PFD 2/N 1
VISBREAKING UNIT
FROM STORAGE TANK 170 DIANNA CAMILLE P. ACHICO SECTION/GROUP
7 P-501 12 JOHN KENNETH E. ALCANTARA ChE 3102 7
MARDON JUSTIN CARL I. BAUAN
JOHN JOEMEL O. COMIA
G5
JULLIA NICOLE R. GARCIA SHEET REV
CHELO JENNICE A. RIVERA 2/N 00
ANGELA G. ROBLES
A B C D E F G H I J
A B C D E F G H I J

V-502 T-501 P-504 P-507 NOTES


VESSEL FRACTIONATOR PUMP PUMP
SIZE, CAPACITY SIZE, CAPACITY SIZE, CAPACITY SIZE, CAPACITY
DES. PRES. @ TEMP DES. PRES. @ TEMP DES. PRES. @ TEMP DES. PRES. @ TEMP ABBREVIATIONS
MAT. OF CONST. MAT. OF CONST.
MAT. OF CONST.
INSULATION
MAT. OF CONST.
INSULATION
DES – DESIGN
INSULATION INSULATION
1 . . PRES – PRESSURE 1
TEMP – TEMPERATURE
MAT – MATERIALS
CONST – CONSTRUCTION
REQT – REQUIREMENT
CAPACITY - Capacity (Flow and D/P)
FLUID
8 INSULATION - Insulation/Tracing
0006 PFD 2/N
439 TO E-507 LEGEND
6
STREAM NO.
2 5 2
TEMPERATURE °C
FLUID
0003 PFD 2/N PRESSURE BAR
FROM SOAKER

V-502
6
3 110 T-501 3

4 P-504
460
57.5

4 E-506 4

E-505 STEAM
317
E-504 FLUID
0023 PFD 2/N
5 TO STRIPPER 5
E-503

E-502

19
6 BATANGAS STATE UNIVERSITY 6
215 The National Engineering University
Department of Chemical Engineering
E-501 FLUID
0027 PFD 2/N CAPSTONE PROJECT
TO E-514
PROCESS FLOW DIAGRAM
UNIT 500
VISBREAKING UNIT
DIANNA CAMILLE P. ACHICO SECTION/GROUP
7 JOHN KENNETH E. ALCANTARA ChE 3102 7
MARDON JUSTIN CARL I. BAUAN
JOHN JOEMEL O. COMIA
G5
P-507 6 JULLIA NICOLE R. GARCIA SHEET REV
CHELO JENNICE A. RIVERA 2/N 00
ANGELA G. ROBLES
A B C D E F G H I J
A B C D E F G H I J
P-501 E-501 E-502 E-503 E-504 E-505 E-506 V-501 P-502 F-501 V-502 T-501 P-504 P-507 NOTES
PUMP HEAT EXCHANGER HEAT EXCHANGER HEAT EXCHANGER HEAT EXCHANGER HEAT EXCHANGER HEAT EXCHANGER VESSEL PUMP FURNACE VESSEL FRACTIONATOR PUMP PUMP
SIZE, CAPACITY DUTY DUTY DUTY DUTY DUTY DUTY SIZE, CAPACITY SIZE, CAPACITY DUTY SIZE, CAPACITY SIZE, CAPACITY SIZE, CAPACITY SIZE, CAPACITY
DES. PRES. @ TEMP SURFACE AREA SURFACE AREA SURFACE AREA SURFACE AREA SURFACE AREA SURFACE AREA DES. PRES. @ TEMP DES. PRES. @ TEMP DES. PRES. @ TEMP DES. PRES. @ TEMP DES. PRES. @ TEMP DES. PRES. @ TEMP ABBREVIATIONS
MAT. OF CONST. SHELL DES. PRES. @ TEMP SHELL DES. PRES. @ TEMP SHELL DES. PRES. @ TEMP SHELL DES. PRES. @ TEMP SHELL DES. PRES. @ TEMP SHELL DES. PRES. @ TEMP MAT. OF CONST. MAT. OF CONST. MAT. OF CONST. MAT. OF CONST.
INSULATION TUBE DES.PRES. @ TEMP TUBE DES.PRES. @ TEMP TUBE DES.PRES. @ TEMP TUBE DES.PRES. @ TEMP TUBE DES.PRES. @ TEMP TUBE DES.PRES. @ TEMP INSULATION INSULATION
MAT. OF CONST. MAT. OF CONST.
INSULATION INSULATION
DES – DESIGN
INSULATION INSULATION
1 MAT. OF CONST. (SHELL/TUBES) MAT. OF CONST. (SHELL/TUBES) MAT. OF CONST. (SHELL/TUBES) MAT. OF CONST. (SHELL/TUBES) MAT. OF CONST. (SHELL/TUBES) MAT. OF CONST. (SHELL/TUBES) . . . PRES – PRESSURE 1
INSULATION INSULATION INSULATION INSULATION INSULATION INSULATION
FLUID TEMP – TEMPERATURE
8 0000 PFD 2/N MAT – MATERIALS
CONST – CONSTRUCTION
439 TO E-507
6 REQT – REQUIREMENT
CAPACITY - Capacity (Flow and D/P)
INSULATION - Insulation/Tracing
5
LEGEND
STREAM NO.
2 2
790 TEMPERATURE °C

PRESSURE BAR

V-502
300

F-501 6
T-501

3 3

4 P-504
460

260
2
3
E-506
4 4

V-501

E-505
317 FLUID
E-504 0000 PFD 2/N

37.5 TO STRIPPER

5 P-502 E-503 5

E-502

19
6 215 BATANGAS STATE UNIVERSITY 6
The National Engineering University
FLUID Department of Chemical Engineering
0000 PFD 2/N
E-501 TO E-514 CAPSTONE PROJECT
PROCESS FLOW DIAGRAM
UNIT 500
VACUUM RESIDUE 148.5 VISBREAKING UNIT
0000 PFD 2/N 1 DIANNA CAMILLE P. ACHICO SECTION/GROUP
7 FROM STORAGE TANK P-507 6 JOHN KENNETH E. ALCANTARA ChE 3102 7
170 MARDON JUSTIN CARL I. BAUAN
P-501 12 JOHN JOEMEL O. COMIA
G5
JULLIA NICOLE R. GARCIA SHEET REV
CHELO JENNICE A. RIVERA 2/N 00