FOOTPATH
FOOTPATH
CARRIAGE WAY
EXCAVATED EARTH
VARIES
MEDIAN
300 NP3 pipe 300
VARIES
300
CARRIAGE WAY
STONE DUST FILLING
A
MANHOLE COVERT
NP3 PIPE FOR SWD
JULY-2020
DESIGNED : KBN
GREATER WARANGAL SMART CITY TYPICAL PIPE CROSS SECTION
ROAD CORRIDOR IMPROVEMENT FOR NORTH
CHECKED : KBN
CORPORATION LIMITED LEA Associates South Asia Pvt. Ltd., India ELEVEN ROADS IN PACKAGE - 1
in Consortium with PricewaterhouseCoopers
APPROVED : AV DRAWING NUMBER : 73607\LASA\GWMC\HIGHWAY\TS-01 REV. R0
NO. DATE REVISION BY