The data was collected from Al Qaim Industries Multan production line and the simulation
model is built using arena software simulation. A simulation model provides a visual
animation of the line to see how the product will flow through the line. Input analyzer was
used to find out the various distributions which fit best on the data.
Tools Used:
Input Analyzer
Arena
Process explanation:
Data Collected:
Processing Times
Mixer Extruder Crusher Balling Unit
23 3.6 12 15
25 2.2 12 16
25 1.9 12 17
22 3.8 12 15
22 2.7 10 14
22 4.2 10 15
24 2.1 11 14
22 1.8 10 16
24 3.1 11 17
24 1.6 11 16
25 4 12 15
25 2.8 11 14
23 3.7 10 16
22 4.3 11 16
22 3.3 11 15
24 1.7 11 14
22 3.9 10 15
22 2.5 11 14
24 4.1 10 16
24 3.5 11 14
Probability Distributions:
S/n Process Distribution
In this study worker and machine performance in manufacturing system using simulation
has been used. The performance measure used parts in system, time in system, entities in
queue and resource utilization. The problems identified are the throughput time from the
existing system is low because of occurrence of bottlenecks, and waiting time identified.
Workers agent should be assigned on the machinery and workers performance to focus on
each operating system due that the number of recycle products can be reduced.