Professional Documents
Culture Documents
2.2
1. General Description 35-8-5 RAM/ACC II
2. BJ Dwg. D 47714-1 35-8-5 (3305/ACC-II), System Diagram
3. BJ Sketch ADC022 35-8-5 ADC Hydraulic Schematic
4. BJ Dwg. D 48550-1 Hydraulic System Ass’y, ACC Kit, 35-8-5 RAM
48550-2 Pumping Skid
48550-3 Power Unit
48550-4 Pumping Skid
48550-5 RAM Tank/Power Unit
2.3
1. General Description SCP-348 (3305/ACC-II)
2. BJ Dwg. D 59851-1 348 (3305/ACC-II), System Diagram
59851-2 348 (3305/ACC-II), System Diagram
3. BJ Dwg. D 61968-1 to 14 Hydraulic System Ass’y, SCP-348/RAM
2.4
1. Sixty Tooth Gear and Drawing
2. BJ Dwg. D 127716 Magnetic Pick-up Ass’y, Pacemaker Pump Drive
2.5
1. Water Valve Potentiometer and Actuator (SCP-348, 35-8-5/RAM/ACC)
2. Water Valve Ass’y Drawing
3. BJ Dwg. C 49121 Potentiometer Ass’y, Stonel #MQ3VE1C
4. BJ Dwg. C 49701 Valve Ass’y, Ball 2”, Jamesbury w/Hydraulic
Actuator
5. BJ Dwg. D 56832 Manifold Ass’y, Mix Water, 35-8-5/ACC
6. BJ Dwg. D 64548-2 Manifold Ass’y Mix Water, SCP-348/RAM
64548-3 Manifold Ass’y Mix Water, SCP-348/RAM
7. Fax Transmission-Changing and Setting New Water Valve
8. Water Flow Meter (SCP-348, 35-8-5/RAM/ACC)
07/20/23
2.7
1. Bulk Valve Potentiometer and Actuator (SCP-348, 35-8-5/RAM/ACC)
2. Bulk Valve Drawing
3. BJ Dwg. C 57520, Valve Ass’y Norris 5” Butterfly w/ Parker Hydraulic
Actuator
4. SCP-348, 35-8-5/RAM/ACC Load Cells
5. Strainsert Load Cell (SCP-348) Data Sheet
6. Load Cell Position (SCP-348)
7. Beowulf Load Cell (35-8-5/RAM/ACC) Data Sheet
2.8
1. Dual Densimeters
2. BJ Dwg. D 42172-1, Densimeter Assembly, DB-IV (Electronic)
42172-2, Densimeter Assembly, DB-IV
42172-3, Densimeter Assembly
2.9
1. BJ Sketch ADC010 and Servo Valve
2. BJ Sketch ADCOO8, (outside) Servo Box 35-8-5/RAM/ACC
3. Servo Box and drawing (inside) 35-8-5/RAM/ACC
4. Servo Box connections 35-8-5/RAM
5. BJ Dwg. D 49148-1, Box Ass’y, 35-8-5 and 148 control
49148-2, Box Ass’y, 35-8-5 and 148 control
6. BJ Sketch ADC009, (outside) Servo Box SCP-348
7. Servo Box and drawing (inside) SCP-348
8. BJ Dwg. D 49148-2-1, Box Ass’y, 348/Control
49148-2-2, Box Ass’y, 348/Control
9. Servo Valve Null Point Adjustment Procedure
10. Sundstrand KVF Series Servo Valve, Data Sheet
07/20/23
2.11
1. ACC II Programming the Job
2. Programming BATCH Stage
3. Programming STAGE 1
4. Setting Ramp and Freeze Times
5. Reviewing the Programmed STAGES
6. Zeroing the DBIV Densimeter
7. Calibrating the Bulk Load Cell
8. Performing Slurry Operations
2.12
1. Introduction Sheet PID Basics - Proportional/Integral/Derivative
Control
2. Factory (Defaults) Presets
3. Calibration Menu
4. Utilities Menu
5. ACC II Module Screens
07/20/23
07/20/23