• Worked as an Electrical Supervisor at DOOSAN in Ain Sokhna power station 2*650 Mw.
• Installation of transformers and installation of cables.
• Installation of cables and termination.
• Installation auxiliaries transformers.
• Lighting and power sockets system.
• Installation of the grounding grid and its connection to all equipment.
• Tests for All cables and transformers.
• synchronization on electrical network.
• Worked as an Electrical technician at KUN CHUNG in Ain Sokhna power station 2*650
Mw.
• Installation the lighting and power sockets system.
• Installation Electrical network to connect electrical equipment.
• Repair of some electrical equipment.
Demonstrate good
understanding of electrical
Good Following the elec. drawings and wiring
technical drawings.
Root cause analyzing and Performing reports and analyzing the results very
reporting. Very Good well.
Good technical knowledge I know all the equipment and each equipment the
for completion of Very Good preventive maintenance dates of the factory and
maintenance activities. make a schedule for them with my leader.
.Good knowledge of using Testing the LV&MV cables and Dry & Oil
Very Good
test equipment. transformers.
. Good understanding of electrical drawing, and I knowledge all Electrical equipment of drawing .
. By identifying the Electrical equipment and knowing their location to detect and maintain the faults.
. It is possible that the errors in the design and when it is discovered we identify the place and point
mechanism and then inform the director and designer.
.To ensure that work properly and analyze the results, which achieves productivity and reduce errors and
injuries and save time and cost reduction.
. know all the equipment and each equipment the preventive maintenance dates of the manufacturer, and
make a schedule for this equipment.
. Doing the Preventive Maintenance according to the schedule .
. Replacement spare parts must be original from the manufacturer.
.the tests it is very important for the ensure the equipment it is worked or no ,and Define faults.
.Can test for DRY transformer.
.Can test for oil transformer.
.Can test the AC & DC motor.
.Can test for LV & MV cable.
. Arrange the work by importance and arrange the work site before and after work .
. An work plan for Preventive maintenance.
. Identification and requisitioning of spare parts that are frequently used.
.
. Repair of motor.
. Termination end of cables.
. Check the transformers.
. Check the switch gear and MV compartment.
. Make of tests for the cable and transformer.
. Fix electronics devices.
. Fix computers and servers.