Canteen Renovation
Additive and deductive
ADDITIVE WORKS

1. An issue arose when the grocery area’s ceiling was removed


2. Converting the old plate storage into a slop sink
3. Additional floor drains and Sinks
4. Leveling elevated area at main kitchen for additional floor drains
5. An issue arose when the food counter 2 and dining area 2’s ceiling was removed
6. An issue arose when the dining area 2’s ceiling was removed
7. Installation of dry wall, false beam and ceiling to cover up visible pipes
8. An issue arose when they drained the water tank near the nursing office
9. Applying epoxy resin and flakes to all counter dining tables tap and making 50 stool
chair with epoxy resin and flakes at the top
10. Fixed the pipes at the main kitchen and inventory room to look good
11. Additional 1 step at grilling station
12. Additional roof for washing area
13. Additional door at grocery area
1. An issue arose when the grocery area’s ceiling was removed
(Before)
An issue arose when the grocery area’s ceiling was removed (After)
2. Converting the old plate storage into a slop sink
3. Additional floor drains and Sinks

1. ADDITIONAL 1 FLOOR DRAIN


AND 1 SINK AT PANTRY AREA
2. ADDITIONAL 1 FLOOR DRAIN AT
SLOP SINK AREA (FORMER PLATE
STORAGE AREA)
3. ADDITIONAL 2 FLOOR DRAIN AT
DISHWASHING AREA
4. ADDITIONAL 4 FLOOR DRAIN
AND 4 SINKS AT MAIN KITCHEN
4. Leveling elevated area at main kitchen for additional floor drains
5. An issue arose when the food counter 2 and dining area 2’s
ceiling was removed

They used G.I


wires to support
the fire sprinkler
at dining area A.
and food counter
2
6. An issue arose when the dining area 2’s ceiling was removed

There was a
ceiling to cover, so
they didn't finish
putting the chb.
7. Installation of dry wall, false beam and ceiling to cover up visible
pipes

Grocery area ( Installed dry wall to cover up visible pipes and to make an extra storage).
Installation of dry wall, false beam and ceiling to cover up visible
pipes

Food Counter 1 (Installed false beam to cover up visible pipes).


Installation of dry wall, false beam and ceiling to cover up visible
pipes

Mimeo area
(Installed false beam
to cover up visible
pipes and installation
of 3 exhaust fans).

Additional 2 exhaust
fan
Installation of dry wall, false beam and ceiling to cover up visible
pipes

Main kitchen (Installed ceiling to cover up visible pipes).


An issue arose when they drained the water tank near the nursing office
8. Relocating panel box at grocery area
9. Electrical

1. Additional 7 outlets and 1 switch at grocery area


2. Additional 4 outlets at pantry area
3. Additional 3 outlets for heater
10. plumbing
11. Applying epoxy resin and flakes to all counter dining tables tap
and making 50 stool chair with epoxy resin and flakes at the top
12. Waterproofing of the balcony
13. Demolition of concrete sucalo
14. Fixed the pipes at the main kitchen and inventory room to look good
14. Additional 1 step at grilling station
15. Additional door for storage room of grocery area
14. The two cr will be activated in the nursing room
DEDUCTIVE WORKS

 Drop ceiling
 Air duct at grocery and bookstore
 Flooring tiles
 Lights
 Tv design