You are on page 1of 11

BABA INSTITUTE OF TECHNOLOGY AND SCIENCES

DEPARTMENT OF CIVIL ENGINEERING

A STEP TOWARDS CONSERVATION OF


YENDADA WATER BODY & PARK

ONE AREA - ONE IDEA - ONE FUTURE

Team members :
P. Vimochan Kumar (20NR1A0126)
K. Chandra Shekar Rao (20NR1A0116)
PROBLEM STATEMENT

Due to rapid urbanisation and


laying of a pipe line in 2008
along the Yendada water body
disturbed its natural drains, it led
to depletion of water levels in
the pond and started facing
severe water crisis since 2021.
REFERENCES
• Basic Ideology
• Articles
EVOLUTION OF YENDADA IN DECADE

2011 2013

2018 2023
Work plan
• The work plan mainly consists of interlinking of the dry water body, to
a minor reservoir (source) which is situated back to our college in
kambalakonda forest ranges.
• The improvement of park by performing a three stages of project
o Phase-1: Interlinking of source to target (water body) by laying
4.6km pipe line.
o Phase-2: Recharging of ground water levels in Yendada region
from conserved waterbody to residential clusters.
o Phase-3: Improvement of park and water activities like photo
landmark site, pedestal breaking and zip line.
Elevation profile & alignment from source to
target:

Alignment of pipe line


through gravity

Source

Target
IMPACT OF THE IDEA ON SOCIETY AND ENVIRONMENT

As by conserving of this water body may show


back of its past biodiversity, flora and fauna of
that place which create a new ecosystem that is
sustainable for environment and society too,
and by the mentioned 3- phases it fully
supports the society for their future water
needs.
FEASIBILITY REPORT
The distance from source to target is 4.6 km, so we need 4.6
kilometers of HDPE/RCC pipe . For every 1m of pipe costs 1000/-
hence for 4600m it takes 46 lakhs nearly 50 lakhs for laying and
construction of pipe line.
Phase-2: 20 lakhs
Phase-3: 30 Lakhs

RCC PIPES
CHALLENGES

The interlinking should passes through Foot Hill of forest.


The pipe line should have regular maintenance and it
should passes through contour regions such that to
encounter the pumping actions.
The pipe line alignment should crosses NH-16 at right
angle.
EVOLUTION OF SHILPARAMAM POND
IN DECADE

IN 2010 IN 2023
Any queries ?