Professional Documents
Culture Documents
Presentation 1
Presentation 1
Quality Improvement by reduce gate point for control the Hole on top of PV Bellow
[Unit: PPM.]
78%↓
70000
15000
Before After
Idea-
Provided a Chamfer step at the gate point area as
•Provide an air vent on the top part of the PV
shown in figure.
Bellow
Idea-
•Provide an air vent on the top part of the PV
Bellow Implementation Date – 01.08.23
Best Practice Bellow ASM
Quality Improvement by Implemented a Gauge for spring joint open during assy.
[Unit: PPM.]
100%↓
2000
0
Before After
Idea-
Round Gauge of Dia. 19 mm implemented to
•To check the maximum tension of the spring
check the tension in ID before assembly.
before open during the assembly
Easiness in 100% Inspection .
Operator Moral Increased
Implementation 24/01/2023
Process Drain Hose Leakage Testing
Date
Improvement Idea
Problem
•A Block Provided in outer cuff. locating block in Before
Drain Hose Outer Cuff Assy. NG (Outer Cuff Location Out) Drain Hose Assy.
•Outer Cuff. guiding block design modified & [Unit: PPM]
replace in assy. inspection fixture in respect of
assy.
100%↓
200
0
Before After