Quality Improvement by reduce gate point for control the Hole on top of PV Bellow
[Unit: PPM.]
78%↓
70000
15000
Before After
Idea-
Provided a Chamfer step at the gate point area as
•Provide an air vent on the top part of the PV
shown in figure.
Bellow
Idea-
•Provide an air vent on the top part of the PV
Bellow Implementation Date – 01.08.23
Best Practice Bellow ASM
Quality Improvement by Implemented a Gauge for spring joint open during assy.
[Unit: PPM.]
100%↓
2000
0
Before After
Idea-
Round Gauge of Dia. 19 mm implemented to
•To check the maximum tension of the spring
check the tension in ID before assembly.
before open during the assembly
Easiness in 100% Inspection .
Operator Moral Increased
[Unit: PPM.]
100%↓
2000
0
Before After
• We apply grease by wooden stick through manually process • Jig Picture