Material discharge
Shell
Central or ventilation ring
Fresh air inlet
Ventilation ring grate
Supports
Trunnion
Leff C2
Leff C1
Leff TOT
D Deff
Purpose
Insuring proper cascading of the
balls and hence crushing of Step
material
General condition of liners
Plate conditions (breaks, chips,
attachments)
Criterion
Performance should be checked
when step < 40%
of initial step (wear=60%) rotation
Corrective measure
Replacement
Purpose
Insure adequate size reduction
Measure on 1/2 step or plate
Insure proper output transverse center
Quick estimate
Distance between charge and lower
part of the trunnion Vertical measurement
Purpose
Evaluating ball charge wear
Detecting a mechanical problem (breakage of a diaphragm sector)
Criteria
Clean charge (no scrap)
Round balls (not deformed) and
of suitable size
Corrective measures
Ball charge sorting in case of
contamination
C1 ball sorting (every 5000 - 7000 h)
Clean charge
C2 ball sorting (every 10000 - 14000 h) Polluted charge
Purpose
Limit wear and insure a good
particle size reduction
Detecting the presence of
spitzers (waves)
Quick evaluation
Material / ball level
Overfilled compartment
Criterion
Material level = ball level
over the entire compt.
Corrective measures
Change in the number of
Right level
small balls 60 mm (2-1/2”)
(or 50 mm (2”)) in C1 and
20 mm (3/4”) (or 17 mm
(5/8”)) in C2
Scoop adjustments
Control of the circulating load
Empty compartment
Purpose
Providing outlet for the material
in the compartments while Scrap
retaining spitzers and balls
Improving ventilation
General conditions
Slot plugging
Peening, clearances
Slot width
C1 side clearance
C2 side clearance
Criteria
C1 slots from 6 mm to
8 mm
C2 outlet slots larger by at
least 2 mm than those of Peened slots
C1 outlet
Corrective measures
Filing and cleaning
Diaphragm replacement
Purpose
COMPARTMENT N°1 COMPARTMENT N°2
Grinding assessmentSamples X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Determining X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
spitzer locations X X X X X X X X X X X
Progressive decrease 20
all along the mill 0
1 2 3 4 5 6 7 8 9 10 11 12
Corrective measure
Sample Number
Adapting the charge
granulometry 40
µm
1
63
µm
2,5
100
µm
5
200
µm
Diaphragm
500
µm
Diaphragm
Changing the length mm mm mm
Inadequate grinding
Presence of grains
Material level
Material level = ball level over the entire compartment
Ball charge classification :
progressive decrease of the ball size in C2
Diaphragm slots :
first compartment slots: 6mm to 8mm
second compartment outlet slots larger by at least 2mm than
those of first compartment
Ventilation screens
they have to have the maximum permeability to let the