You are on page 1of 32

Zealogics offering to KPMG

IT & Engineering for Better Tomorrow

05/12/2023 Copyright © 2023 by Zealogics.


About Zealogics
Zealogics is a global IT consulting and engineering R&D We are pleased to formally announce that we recently
services company working with Fortune 500 customers across established our new presence in the UK and Canada. In the
Industries. upcoming years, we intend to grow our clientele and
expand into more countries.
Aero Semicond. Banking
Global Presence
Mobility Healthcare Energy
Richmond Hill, ON, Canada Russell Sq, London, UK

Bridgewater, NJ, USA Netherlands

San Jose, CA, USA Shanghai, China


Hi-Tech Oil & Gas Abu Dhabi, UAE
Dallas, TX,
USA Taiwan

Kochi, India

• Build next generation engineering solutions for our


engineering partner through our engineering expertise in
Mechanical, Embedded Systems, and Software.
• Zealogics has been named one of America's Fastest- 650+ Engineers globally spread.
Growing Private Companies by Inc. 5000.
• Zealogics is honoured to be recognized for 2022 Great North UK and Middle East South Asia Southeast
Place to Work – Certified™ America Europe Asia

05/12/2023 Copyright © 2023 by Zealogics. IT & Engineering for Better Tomorrow


Our Key Offerings
Product Engineering Services [Integrated or Discrete]
Software Embedded Electrical & Mechanical
Engineering Engineering Engineering
Application Development​, Maintenance & Electronic Hardware Design, Firmware Product Design, Component Design,
Support, Robotic Process Automation​, Development, Embedded system Accessories Design, Electromech Design,
Blockchain Development​, UX/UI, DevOps integration, Obsolescence Management, System Integration, Design Optimization,
& CI/CD, Cloud Services, Next-gen Test Change Management, Performance Value Engineering, Engineering Analysis,
Automation​, Code Security Analysis, optimization, Box Build & Assembly, Testing & Validation, NPI Engineering,
Machine Learning & AI, Big Data Testing & Validation, Compliance and Sustenance Engineering, Change
Analytics, Internet of Things Regulatory, Product Documentation Management, Technical Publication

Technology Stack for Digital Transformation

Machine Cloud & Low Code / Big Data Blockchain Automation Experience
Learning & AI DevOps No Code Analytics Solutions RPA Design UXUI
505/12/2023
December 2023 Copyright © 2023 by Zealogics. IT & Engineering for Better Tomorrow3
IT & Software
Services

IT & Engineering for Better Tomorrow


Our Services to

We have 100% resources with KPMG project knowledge

Departments
Serving 7 Departments in KPMG
7+
Tie-up
More than 15 Years experience with KPMG
15+
Delivery
Successfully delivered 50+ Projects

50+
Associates
More than 90+ Associates working from India, Canada &

90+ US for KPMG

Independence Risk Team Digital Nexus


Audit Advisory Tax – US
group (GBO) (K-Tech)

05/12/2023 Copyright © 2023 by Zealogics. IT & Engineering for Better Tomorrow


Staffing Positions

Position Name Position Name Position Name Position Name


Algorithm Engineer Engineering Product Manager Project Integrator Software Engineer
Analog Design Engineer ETL Talend Developer Project Lead Solution Architect
Audit Security Analyst Hadoop Developer Python Engineer Solutions Architect
Automation Analyst Hadoop Java developer QA Engineer SQA position
Automation Engineer HPC Engineer QA TESTER SQA tester
Automation Test Engineer Integrator Scrum Master System Integration Engineer- Proto
Azure DevOps Lead IT Executive director SEM Integrator Team Lead
Business Analyst IT Project Manager Senior Business Analyst Technical Architect
C++ Developer Java Developer Senior C++ Developer Technical Lead
C++ Metrology PrintCheck role Lead Developer Senior Infrastructure Analyst Technical Program Manager
CME Loan IQ Analyst Material Handler Senior Java Developer Technician
Component Engineer Mechanical Engineer Senior Software Engineer Test Engineer
Connectivity Designer Mechatronics Engineer Senior System Admin Testing Analyst
Database Programmer Operations Analyst I Senior Technical Lead UX designer
DevOps Engineer PCB Cordinator Sharepoint Architect Verification Engineer
Electrical Engineer Power BI Developer Software Developer

05/12/2023 Copyright © 2023 by Zealogics. IT & Engineering for Better Tomorrow


Case Study Background: The existing Learning Application portal has some limitation with respect to
overall customer experience. Also had difficulty is communication and management of
Learning Portal Teams AI courses due to multi-tenant scenarios. As part of their digital transformation initiative,
they decided to transition from a traditional website to Microsoft Teams with integrated
Project Requirement: chatbot capabilities to enhance customer engagement and streamline support processes.
Learning Portal Teams SOLUTION: Zealogics designed and developed a Teams application with ChatBOT AI capability and onboarded into Microsoft
Integration with AI capability Teams App Store. Users can interact with the Chat BOT in natural language from Teams, get the course details, register, review, get
reminders, learning progress, course insights, search and filter, and many more features incorporated in it.
on Cognitive analysis

WORKFLOW REMINDERS CHATBOT

MICROSOFT STORE NOTIFICATIONS

COLLOBRATION Q&A ALERTS

COGNITIVE SERVICE INTEGRATION

Status: Completed
Customer Benefits: Zealogics’ App helping customer global distribution of the application
Software Tools through Microsoft Teams App store. By centralizing all interactions within Microsoft
Teams, customers enjoyed a consistent user experience. They no longer needed to switch
between channels, quick Q&A connects, stipulated reminders and alerts, course progress,
completion status and more seamless and convenient experience.
05/12/2023 Copyright © 2023 by Zealogics.
Case Study BACKGROUND: Support Team, daily deals with a high volume of various contents as
Customer service emails, Financial reports, Engineering documents, Job applications etc.
Generative AI Solutions resulting in longer response times and potential delays in resolving customer queries and
leads to delays in accessing critical information. They seek a solution to efficiently
Project Requirement: manage and generate quick outcome to serve the customers.
Implementation of AI SOLUTION: By leveraging the capabilities of the Generative AI , Zealogics significantly enhances the employees & customer support
capabilities to handle document experience by developing custom Natural Language chatGPT like experience which offers Summarization of large financial reports, Q&A with
processing documents, Chatting with tabular reports, Autonomous agents, Automated Resume screening, Automated chart/report generation through chat
etc..

OPEN AI GENERATIVE AI

CUSTOMER SUPPORT SUMMARIZATION

CHAT GPT AGENTS TOOLS

NATURAL
LANGUAGE

Status: On Going
CUSTOMER BENEFITS: Zealogics team significantly enhanced customer support
Software Tools operations, providing timely and accurate assistance to its customers while optimizing
resources and improving overall customer satisfaction.

05/12/2023 Copyright © 2023 by Zealogics.


Case Study Background: Every time a prototype is about to be built, team faces challenges in
obtaining the right parts and quantity on time because they were not notified of any
CAB Tracker updates made by various stakeholders during the ongoing process. Because of numerous
stakeholder verification, validation and approval process, the implementation time for
Project Requirement: proto getting extended beyond the deadline.
Configuration-AS-Build (CAB) SOLUTION: Below is a new platform developed to assist system integrators in performing Proto Build more accurately and without
Project issues. This platform will make sure that before the build begins, all stakeholders have approved the materials and tools listed in the
processes that will be utilized for the proto build.

WORKFLOW SIGN-OFF PROTO BUILD

ANOMALIES MS POWER APP

SHAREPOINT MATERIALS TOOLS

CONFIGURATION MFG PROCEDURE

Status: Completed
Customer Benefits: Zealogics team developed a workflow app in SharePoint using power
Software Tools app, where all the stakeholders are onboarded to the platform. The CAB team initiates the
workflow, and the relevant stakeholders are notified for review, approval & closure,
monitor & track progress of task, view pending tasks on their dash, download any data for
consumption and more. This in turn reduced the overall follow-up and reminders,
workflow status tracking with UpToDate status and faster time to market.
05/12/2023 Copyright © 2023 by Zealogics.
Case Study Background: The engineering team was maintaining the system configuration data in
bulky XML files, which were basically cluttered and obviously left the users prone to
making mistakes while updating, resulting in incorrect data that could lead to project
XML Data Parser deadlines being extended. Additionally, there was no user-friendly method available to
view and manage the configuration data.
Project Requirement:
Below is a new SharePoint online platform developed to help users keep, track, and manage System Configurations accurately. It has
Configuration-AS-Build a user-friendly interface for uploading and editing large XML files and applies various validations to ensure data accuracy. The
Project system has specific permission levels for security.

SECURITY MS FLOW SP GROUPS

ANOMALIE MS POWER APP


S
SHAREPOINT CONFIGURATION

CONDITION FILES XML FILE UPLOAD

Status: Completed
Customer Benefits: Zealogics' new platform facilitated improved data visualization for the
Software Tools customer, with alerts for incorrect data and the ability to manually add data for certain
fields. A workflow was established using Power Automate to send system configuration
data to stakeholders at specified intervals, including the upload time.

05/12/2023 Copyright © 2023 by Zealogics.


Case Study Background: KPMG wanted to improve the performance and user experience of their
SharePoint Online (SPO) portals. They needed to analyze user behavior, identify popular
SharePoint Online Analytics content, detect broken links, perform network analysis, and identify unused portals. The
challenge was to extract and analyze this data in a way that was efficient and effective.
Project Requirement:
SOLUTION: Zealogics team developed a comprehensive solution to meet their requirements. The solution involved utilizing the
Detailed analysis, Optimization Analytics Data API, SPO REST API, Office 365 Management API, Search API, and custom add-ins/SPFx applications. Key
with insights about the online technologies used included .NET Core, Application Insights, TypeScript, SPFx, Power BI, and SQL Server.
SharePoint portal

ANALYTICS DASHBOARD TRAFFIC

CONTENTS & GROUPS DOCUMENTS

LINKS Q&A
NETWORK ANALYSIS

Status: Completed

Software Tools Customer Benefits: A detailed analytics dashboard was delivered that provides multiple
filter options and customization features. The dashboard can be used to review priorities,
critical sites, broken links, and network traffic analysis. This information can be used to
make decisions about the future and scope of SharePoint.
05/12/2023 Copyright © 2023 by Zealogics.
Case Study Background: KPMG faced the challenge of efficiently
managing the creation of Teams for their entire organization.
Teams Templating With numerous requests coming in, they needed a solution
that would streamline the process and allow for customizable
Project Requirement: templates based on the department. Their goal was to simplify
Create Teams Templates based the Team creation process for requesters by providing them
on Department which can be with a seamless way to select the appropriate department
module and have the entire Teams structure created with just
reused by new Teams
one click upon approval..
TEMPLATES MESSAGING AZURE

GROUPING REUSABILITY SOLUTION: Below is a new robust system that allowed the creation of different
Templates with multiple channels and features. QMessage, a powerful messaging
COLLOBRATION Q&A
INTEGRATION platform, was integrated to facilitate seamless communication and collaboration
within Teams. Tools used for implementation are Azure Service Bus, Azure Function,
Azure SQL Database, Azure Key vault and Azure Logic Apps

Status: Completed
Customer Benefits: Zealogics team developed a solution that would allow organizations to
Software Tools create Teams templates using QMessage. The templates could be customized to include
different channels and features. A Service Now form was also implemented, which
allowed member firms to request Team creation and choose from pre-defined templates.

05/12/2023 Copyright © 2023 by Zealogics.


Case Study Background: A large financial organization, wants to keep all the Teams data in a
snapshot mode, so that any future requirements, they can simply refer the snapshots and
Teams SnapShot gather required information from the same. This include all the chat history,
communication groups, folders, files and multiple channels.
Project Requirement:
Teams Data Snapshot with all
groups, channels, files and SOLUTION: Below is a new robust system that enabled
Teams-aware webpages embedded in Microsoft Teams in the
folders form of Tabs. They are simple iframes which can be added as
part of a channel inside a team, a group chat, or as a personal
app for an individual user. The custom tabs within the app
SNAPSHOT MESSAGING AZURE
allows to embed web content in Teams and add Teams-specific
GROUPING REUSABILITY functionality to the web content. Technologies used for
implementing this solution are : Microsoft Teams Custom
COLLOBRATION Q&A
INTEGRATION App, Microsoft Blazor, Framework Server App (.NET Core
3.1), Azure Cloud Services - (Azure AD, Application Insights,
App Service, Key Vault), Azure Storage Services, Azure SQL
Database, Azure Functions, Power BI Reports, Service Now
Integration

Status: Completed
Customer Benefits: Out Solution enabled the Snapshot of a specific Microsoft Teams
Software Tools content with a maximum size of 50 GB and sends email to users with multiple zip files.
The embedded web page in the custom tab hosted in the Azure environment allows the
users to take snapshot of the Microsoft teams messages, posts and files. An Azure
background process runs in the background will do all the plumbing and will email the
details to the end users with download link.
05/12/2023 Copyright © 2023 by Zealogics.
Case Study Background: A retail chain with multiple stores receives a high volume of invoices from
vendors for products purchased. Previously, the invoices were manually processed and
Invoice Data Extraction entered into the accounting system, which was time-consuming and prone to errors.
Additionally, the manual process made it difficult to track and analyze the data, the ability
Project Requirement: to make informed decisions.
Automating Data Extraction SOLUTION: The prebuilt AI model for invoice processing captures important invoice data to aid in automating the processing of
invoices. The invoice processing model is optimized to recognize common invoice elements such as the invoice ID, customer details,
with AI Builder vendor details, ship to, bill to, total, tax, subtotal, line items and more. In addition, the prebuilt invoice model is trained to analyze and
returns all the text and tables on the invoice.

AI AUTOMATED
BUILDER WORKFLOW
POWER AUTOMATE MS POWER APP

POWER BI MACHINE
LEARNING
OPTICAL CHARACTER
RECOGNITION
XML FILE UPLOAD ALGORITHM
S

Status: Completed

Software Tools Customer Benefits: Zealogics' AI Builder streamlines invoice processing for a retail chain.
It extracts invoice data and exports it to a centralized database or Excel sheet, with an alert
system that notifies of any errors. This solution reduces errors, improves efficiency and
streamlines the invoice processing in accounting and finance processes of the retail chain.
05/12/2023
Copyright © 2023 by Zealogics.
Case Study Background: Client needs to ensure that all parts under different categories are ready for release by
the end of the year. For each of these of parts the responsible Project leads are expected to enter the
proposed week, along with some additional information. That contributes towards Release readiness
Release Readiness Report are to be fetched from other sources which could be an excel sheet or a smart sheet. Handling and
collaborating this huge data manually is cumbersome and reading the data and drawing a conclusion
Project Requirement: is time consuming.
Report to keep track of the SOLUTION: Below is a new report developed to enable the users to understand the list of parts that are ready for release, if not when
will it be ready , identify the priority parts, make sure that the part scheduled for release on a week is completed as expected, if not
release readiness proposals for track it.
parts under different categories
Power BI Excel DAX

SHAREPOINT Smartsheet

CONFIGURATION

Status: Completed

Software Tools Customer Benefits: Zealogics team developed a report that keeps track of the estimated
week of completion taking a list attributes into account, making sure that work is
completed as per plan. This is achieved by combing numerous data sources.

05/12/2023
Copyright © 2023 by Zealogics.
Case Study Background: Each week a list of component with issues on which the team must work is shared
from Tainan factory, team needs to work on a selected number of component based on a set of
Material Notification List criteria also taking priority into account. This list should be determined for a specific interval of time
which is susceptible to change. Handling this manually and integrating with different data sources is
Management Report
time consuming as this must be updated every day.
Project Requirement: Below is a new platform developed on Power BI for assisting the users to analyze, track and manage the top Material
Notification List based on the selected criteria. By doing so the users would be able to narrow down the list of component on which
Report to fetch the top list of they have to work on. The set of filters are also helpful for achieving the same.
items on the bases of selected
criteria.

Power BI Excel DAX

SHAREPOINT AIR Report

Status: Completed

Software Tools Customer Benefits: Zealogics team developed a power BI report to determine the top N component
based on the selected criteria and time frame. Identify if they are a part of priority list used in the
release readiness report, view the issue and ticket created for them. This report also provides the
visual representation of the data as per the user requirements.

05/12/2023
Copyright © 2023 by Zealogics.
Case Study Background: For the Restrictions Management Team who wanted to improve efficiency
and accuracy of RMD Data, the integration of CPL and FFRL into RMD provides a
Restriction Management consolidation of data points and an improved user experience. Unlike the multiple
Database (RMD) systems in the past which require data to be maintained separately, this new solution
streamlines this information, and reduces maintenance efforts.
Project Requirement:
Improve efficiency and accuracy of SOLUTION: Below is an enhanced version of an existing application designed and developed by the Zealogics team. The new
RMD Data by integrating Covered platform now has CPL and FFRL integration.

Person Lists (CPL) and Firm


Financial Relationships Lists
(FFRL) into a Restriction
Management Database (RMD).
WORKFLOW SECURITY DATA
ACCURACY
EFFICIENCY RECONCILIATIO RISK MANAGEMENT
N
FIRM FINANCIAL
COVERED PERSON
RELATIONSHIP LIST
LIST
LEAD AUDIT ENGAGEMENT INTEGRATIO
PARTNER N
REPORTS Q&A
Customer Benefits: The Zealogics team has designed, developed, and integrated the
Status: Completed enhanced version of this RMD application. The enhanced solution increases data accuracy,
optimizes risk mitigation capabilities, and improves reconciliation/validation processes.
Software Tools

05/12/2023 Copyright © 2023 by Zealogics.


Case Study
Background: Client faced challenges in managing variables in Azure DevOps Pipelines
Config Management due to the lack of historical change tracking in Variable Groups. They needed a solution
that addressed this limitation and offered additional functionality.
Project Requirement:
Variable Management in Azure
DevOps
SOLUTION: Zealogics team developed a SharePoint-based solution to manage their variables more effectively. The solution
involved the implementation of a custom SharePoint application that provided a robust and flexible environment for managing
variables. The applications key features, including the ability to add an unlimited number of variables, maintain audit trails, enforce
DEVOPS CI-CD AZURE
granular security controls
OFFICE 365 AUTOMATION

SHAREPOINT Q&A
ENVIRONMENT

Status: Completed Customer Benefits: The solution resolved the challenges faced in Azure DevOps Pipelines
and provided a robust and flexible environment for managing variables. The solution
Software Tools included historical change tracking, granular security controls, validations, and seamless
integration with Azure DevOps Pipelines.

05/12/2023 Copyright © 2023 by Zealogics.


Case Study
Background: A leading enterprise, faced the challenge of implementing consistent and
CI-CD Implementation efficient CI/CD processes across their diverse technology stacks, including .NET,
Angular, React, Java, Azure Service Fabric, Docker, and Kubernetes. They needed a
Project Requirement: comprehensive solution that would streamline their development and deployment
End-to-End CI/CD pipelines, incorporate best practices, and integrate various tools for security and artifact
Implementation for Diverse management.
Technology Stacks

DEVOPS CI-CD AZURE


SOLUTION: Zealogics team developed an-to-end CI/CD solution that addressed their diverse technology stack requirements. The
OFFICE 365 AUTOMATION solution resulted in streamlined processes, consistent best practices, enhanced security, and efficient change and artifact management.

SHAREPOINT Q&A
ENVIRONMENT

Customer Benefits: The end-to-end CI/CD implementation delivered significant benefits


Status: Completed to our client, including increased efficiency, faster time-to-market, improved code quality,
enhanced collaboration, cost savings, scalability, and compliance. These benefits enabled
Software Tools to stay competitive in their industry and deliver high-quality software solutions to their
customers efficiently.

Disclaimer: The information published here is the sole property of Zealogics and is only intended for internal distribution among Zealogics and
05/12/2023 Copyright © 2023 by Zealogics. Zealogics contingent workforce (Zealogics employees). This document contains proprietary and confidential information that should not be used,
published, or distributed outside of the company.
Case Study Background: Our client faced challenges, including the need to track project progress,
allocate the workforce effectively, monitor projects by location, determine billable status,
Industry identify critical projects, and generate comprehensive reports. These challenges
underscored the importance of enhancing their project management capabilities.
Semiconductor
The application within the Power Platform was constructed using a combination of Power Apps for UI design, Power Automate for
Project Requirement: workflow automation, and Power BI for data visualization. Data sources were integrated, and logic was implemented to create a
dynamic dashboard, enabling real-time data updates.
Drive efficacy with Work
Progress Tracker
TRACKIN STATUS BILLING
G
TASK VIEW PROEJCT MGMT

DASHBOARD APPLIED / IDLE

Status: On Going
Customer Benefits: Leveraging the power of Power Apps, Power Automate, and Power
Software Tools BI, we created a dynamic dashboard. This platform allowed the client to effortlessly track
projects across various locations, providing insights into project status, billability, and
Power Apps, Power location-specific activity. With real-time data integration and automation.
Automate, Power BI
Disclaimer: The information published here is the sole property of Zealogics and is only intended for internal distribution among Zealogics and
05/12/2023 Copyright © 2023 by Zealogics. Zealogics contingent workforce (Zealogics employees). This document contains proprietary and confidential information that should not be used,
published, or distributed outside of the company.
Case Study Background: Our client struggles to efficiently manage multiple vendors, lacking a unified
system to track project allocation, performance metrics, payments, and expenses. The
Industry absence of a comprehensive dashboard hinders timely decision-making, project
transparency, leading to potential delays, budget overruns, and an inability to optimize
vendor relationships..
Telecom
Power Apps facilitated a responsive UI for data input, while Power BI's robust integration extracted real-time data, enabling dynamic
Project Requirement: analytics. Power Automate synchronized workflows, ensuring seamless collaboration in our multi-vendor management application.

Vendor360. Unified
Management for Excellence
TRACKIN STATUS INVOICES
G
PAYMENTS PERFORMANCE

VENDOR MGMT TRACK EXPENSE

Status: Delivered
Customer Benefits: This application ensured streamlined vendor management, real-time
Software Tools insights through Power BI for decision-making, optimizing project allocation,
performance tracking, and financial management. The unified platform enhances
Power Apps, Power efficiency, mitigates risks, and fosters proactive decision-making, ultimately driving
Automate, Power BI project success and vendor satisfaction.
Disclaimer: The information published here is the sole property of Zealogics and is only intended for internal distribution among Zealogics and
05/12/2023 Copyright © 2023 by Zealogics. Zealogics contingent workforce (Zealogics employees). This document contains proprietary and confidential information that should not be used,
published, or distributed outside of the company.
Case Study Background: Our Client encountered challenges in tracking project progress due to
disparate task management. Issues included difficulty prioritizing tasks, lacking a
Industry consolidated overview, and struggling to monitor diverse project phases effectively. The
absence of a centralized system hindered real-time status assessment, impeding decision-
making.
Semiconductor
The application employs Power Platform for a comprehensive project management solution. Leveraging dynamic visuals, filters, and
Project Requirement: real-time data, it consolidates tasks, prioritizes projects, and enhances decision-making. The modular design facilitates seamless
integration, ensuring an adaptive and scalable approach to project tracking.
Dynamic Project Management
with Power
TRACKIN STATUS PHASE
G WISE
REAL-TIME POWER PLATFROM
DATA
DYNAMIC DEVELOPMENT
VISUALS PHASE

Status: Delivered
Customer Benefits: The implemented Power Platform dashboard addresses these
Software Tools challenges, offering a holistic project snapshot, phase-wise insights, and dynamic filters
for streamlined project management. Gain clarity with dynamic visuals and Gantt charts.
Power Apps, Power filter tasks by users, weeks, months for precise insights, enhancing project efficiency and
Automate, Power BI decision-making.
Disclaimer: The information published here is the sole property of Zealogics and is only intended for internal distribution among Zealogics and
05/12/2023 Copyright © 2023 by Zealogics. Zealogics contingent workforce (Zealogics employees). This document contains proprietary and confidential information that should not be used,
published, or distributed outside of the company.
Thank You
About Zealogics
Zealogics, [Est. 2012] is a Global Engineering company that offers Engineering and Information Technology services to a wide range of industry
verticals, including Semiconductor, Mobility, Healthcare, Industrial, Oil & Gas, Energy, Banking & Financial, and Sustainability. Our deep domain
expertise and engineering practices instill creativity and nimbleness into our clients' businesses to produce measurable results and long-lasting
transformation.

Visit us at To learn more please contact


www.zealogics.com info@zealogics.com
Zealogics Development Centre (IDC) or A Remote
Engagement
A Joint Journey between Zealogics and the Customer

• The Journey is performed in phases to minimize risks, maximize ROI, and shorten time-to-market
• The model provides Customer with a dedicated skilled team aligned well to their technology and business needs
• The engagement model is an umbrella framework, under which different appropriate pricing model can be adopted depending on the nature and
scope of work

Phase 0 Phase I Phase II Phase III Phase IV

Piloting Planning Engage-In Stabilization Service Delivery


• Due-diligence • Team ramp up @ Zealogics • Engagement / execution • Work in-take and co-execution • Work in-take and Execution
• System study • Engagement/ Execution initiation • Continuous Improvement • Delivery Management
• Identification of pilot planning • Team alignment • Process Adoption and • Continuous Improvement
engagement • Infrastructure and • Process tailoring customization • Structured Innovation
• Execute pilot, review connectivity planning • Knowledge acquisition • Knowledge management • Multi-layer governance
results and move to • Outcome Management • Metric driven governance
phase 1

Program Management Delivery Enablers

Planning Risk Management Communication Governance Process & Quality People Practices Partners Centres of Excellence

Note: The phases and tasks will be customized to accommodate Customer’s specific needs and objectives
05/12/2023 Copyright © 2023 by Zealogics. IT & Engineering for Better Tomorrow
Knowledge Acquisition and Management Process
 Existing SDLC Process training  Create process rollout plan
 Customise the process, workflows and roles  Communication and change management
 Offshore facility setup to include the remote team  Conduct user training for new team
 IT infrastructure setup with onsite facilities  Ensure all stakeholders speaks and  Initiate metric updates and reporting
 Understand the IT standards, processes, understand all terminologies identically  Create Release management plan
practices, technical components, and tools  Define and document governance and
communication plans
Phase II

Knowledge Acquisition
Infrastructure
Ramp-up of Setup
Zealogics team Process Process
Tailoring rollout

Phase I Phase III

Planning Deliverables Deliverables Stabilization

Continuous
improvement
Knowledge Acquisition Shadowing Reverse Shadowing Readiness review

 Prepare knowledge acquisition plan  Working with Onsite team in  Offshore team work independently in  DEMO: Conduct reverse
 Business background and process details from shadow mode reverse shadow mode presentations
Customer SMEs  Revise and update SAD (SMEs  Execution plan base lined  Execute activities to demonstrate
 Review and understand systems inventory to review)  Measure Knowledge acquisition acquired knowledge
 Document the technical environment  Measure knowledge acquisition effectiveness  Remote team readiness assessment
 Create System Appreciation Document (SAD) effectiveness

Note: Specific tasks will be customized to meet the type and scope of work involved – Example : Maintenance and Support engagements
05/12/2023 Copyright © 2023 by Zealogics. IT & Engineering for Better Tomorrow
AI & Machine Learning
Shaping Business Transformation Through Advanced AI and Machine Learning

Natural Language Data Mining &


Predictive Analysis Computer Vision
Processing Analytics

 Analyse data classification,  Advanced texts, speech, and cognitive  Optical Character Recognition to  Advanced Data Analytics
segmentation, anomaly detection, and analytics extract text  Clustering
fraud detection solutions.  Structured and unstructured data  Image Analysis to process visual  Pattern Detection
 Cybersecurity and physical security analysis features from images  Statistical Analytics
objectives  Chatbots, Digital Assistants  Facial recognition solution to detect  Data Visualization
 Predict quality, maintenance &  Text generation  Spatial Analysis to analyse the
revenue  Sentiment analysis presence and movement
 Personalize the user experience to  Image processing to capture, classify,
make the product intuitive and extract, validate
tailored for all users.  Stream processing

05/12/2023 Copyright © 2023 by Zealogics. IT & Engineering for Better Tomorrow


Power Platform

Power Power Power


Apps Automate Pages

Power Power
BI Agent

Curious about how Zealogics accelerates


your Application development with the Power
Platform?"
05/12/2023 Copyright © 2023 by Zealogics. IT & Engineering for Better Tomorrow
Transforming Businesses with Power Platform
Enhancing Productivity,
Data Insights, and
Automation.
The Power Platform includes Power Apps
for building custom apps, Power Automate
for process automation, and Power BI for
data visualization. It also offers the
Common Data Service for secure data
storage, AI Builder for automation and
predictions, and over 275 data connectors
for various applications.

05/12/2023 Copyright © 2023 by Zealogics. IT & Engineering for Better Tomorrow


Boosting Business Agility with Custom Apps
We empower business power users to create and utilize custom business apps across
platforms, enhancing agility, seamlessly integrate multiple data sources, catering to specific
needs, and enabling users at all levels to boost efficiency.

Seamless Integration:
Seamlessly integrate with your existing data and systems for
effortless connectivity and data access, simplifying the process.

Code-Free Development :
Develop apps, forms, and workflows effortlessly, all without the
need for coding.

Universal Accessibility:
Enjoy the flexibility of using your apps on various devices, be it
web or mobile, ensuring accessibility and usability across
platforms.

05/12/2023 Copyright © 2023 by Zealogics. IT & Engineering for Better Tomorrow


Low-Code / No-Code
Accelerate digital transformation with our low-code development services. Allowing you to create smart applications at a low cost and in record time.

We provide custom low-code/no-code solutions, you can streamline your operations and improve your efficiency, without requiring a large budget or a team of developers.
Low-code development is a modern approach to building software applications that allow developers to create complex systems with minimal coding. Our low-code development services provide
businesses with the tools and expertise they need to quickly and easily create powerful software applications without the need for extensive coding knowledge.
We specialize in providing solutions using low-code development platforms:

Power Pages
OutSystems is a low-code platform that allows businesses to create custom applications quickly PowerApps is a low-code/no-code platform developed by Microsoft that allows users to create
and easily. It features a drag-and-drop interface that makes it easy to create custom forms, custom business applications for various platforms such as web, mobile, and tablet. It allows users to
workflows, reports and its pre-built connectors allow you to integrate with other systems. connect to data sources such as SharePoint, Excel, and Dynamics 365 and use that data to create
custom business apps that can be accessed from anywhere.

Low Code Design & Architecture Power Platform Consulting


Mobile and Web App Development Enterprise App. development using Power Apps
OutSystems QA Portal and Data Driven Development
Advisory Services Business Process Automation
Maintenance & Support
Humancentric Design (UX/UI)
End to End Solutioning
05/12/2023
Copyright © 2023 by Zealogics. IT & Engineering for Better Tomorrow
Empowering Data Collaboration at scale
Power BI empowers users to access, share, and collaborate on data effortlessly,
fostering a global data-driven community. Experience your data, your way,
anytime, anywhere.

05/12/2023 Copyright © 2023 by Zealogics. IT & Engineering for Better Tomorrow


Overview of AI Builder for Power Platform
AI Builder has a "low-code" approach that allows users to introduce artificial
intelligence into projects without requiring coding experts. Users can build
custom models that adapt to their company's unique business needs, or they can
get started quickly with a pre-built model.

05/12/2023 Copyright © 2023 by Zealogics. IT & Engineering for Better Tomorrow

You might also like