There are two levelling tasks to complete for this practical instruction. Task 1 involves doing levelling work from a benchmark to any site around the university using either rise and fall or height of collimation methods. Task 2 involves doing earthwork calculations for cut and fill on a selected construction site. Both tasks require forming survey teams, planning the work with the necessary equipment and methods, and submitting a 6-8 page report on the working procedure, calculations, and conclusions. A single 8-10 minute video recording of both levelling and total station work is also required for presentation during construction week.
There are two levelling tasks to complete for this practical instruction. Task 1 involves doing levelling work from a benchmark to any site around the university using either rise and fall or height of collimation methods. Task 2 involves doing earthwork calculations for cut and fill on a selected construction site. Both tasks require forming survey teams, planning the work with the necessary equipment and methods, and submitting a 6-8 page report on the working procedure, calculations, and conclusions. A single 8-10 minute video recording of both levelling and total station work is also required for presentation during construction week.
There are two levelling tasks to complete for this practical instruction. Task 1 involves doing levelling work from a benchmark to any site around the university using either rise and fall or height of collimation methods. Task 2 involves doing earthwork calculations for cut and fill on a selected construction site. Both tasks require forming survey teams, planning the work with the necessary equipment and methods, and submitting a 6-8 page report on the working procedure, calculations, and conclusions. A single 8-10 minute video recording of both levelling and total station work is also required for presentation during construction week.
do task no.1 first and then continue with no.2 TASK 1 1.Do the levelling work from BM to any site around UTHM: -Any site here means for example your construction site
Other important instruction:
-Set up survey team as in Group member. -Plan the work accordingly (all the necessary equipment and method must be known: notes from slides or survey books) -Submit the work upon practical work completion (report on working procedure, calculation (use rise & fall and also height of collimation method) and discussion/conclusion- 6 to 8 pages, font arial 11 size font double spacing) TASK 2 2. Do the earthwork (cut & fill) on your selected construction site -Set up survey team as in your Group member -Plan the work accordingly (all the necessary equipment and method must be known: notes from slides or survey books) -Submit the work upon practical work completion (report on working procedure, calculation and discussion/conclusion, 6 to 8 pages, font arial 11 size font double spacing) VIDEO RECORDING IF FOR PRESENTATION IN CONSTRUCTION WEEK (WEEK 13) -Only need 1 video recording for all task- (levelling work and total station work) -Duration for video is 8 to 10 minutes