You are on page 1of 10

Internship

Concrete Repair

Submitted to Dr Wael Slika


Done by: Hadi El Chami
201802016
Contents

01 02 03 04
Introduction Steps for Concrete Damage Re- Methods for repairing Case studies for con-
pair concrete crete repair

05 06 07
Failure of repaired con- How to avoid failure/crack
crete: after repair Conclusion
Introduction

What is concrete repair?

Concrete repair is the process of fixing or restor-


ing damaged concrete structures that, over time,
has lost the ability to hold the binding concrete
materials together due to damage or environ-
mental exposure. Concrete repair is appropriate
for cracks, physical impacts, chipped out sur-
faces or surface scaling.
Steps for Concrete Damage Repair in
Reinforced Concrete Structures

01 02 03 04
Determine Causes of Assess the Extent of Concrete Evaluate the Need for Select Concrete Repair
Concrete Defects Damage Concrete Repair Method

05 06 07
Prepare Damaged Concrete Apply Suitable Repair Cure Repaired
for Repair Method Concrete
Patching

Resurfacing
Methods for Re-
pairing Concrete
Injection

Overlaying
Case Studies

Hoover Dam Willis Tower


• The Hoover Dam is a concrete arch-gravity • The Willis Tower is a skyscraper located in
dam built in 1930 on the Colorado River in Chicago, Illinois. In the early 1990s, the
the United States. In the 1990s, a concrete re- building's concrete exterior began to crack
pair project was undertaken to address issues and spall due to corrosion of the reinforcing
such as alkali-aggregate reaction (AAR) and steel. A major concrete repair project was un-
freeze-thaw damage. The repair work in- dertaken to replace damaged concrete and re-
volved removing and replacing damaged con- inforce the building's exterior. The repair
crete, injecting epoxy into cracks, and in- work involved installing new steel reinforce-
stalling steel reinforcement. ment, applying a protective coating to the ex-
terior, and using high-pressure water jets to
remove damaged concrete.
Failure of repaired concrete and how to
avoid it

Incompatibility

In terms of composition, strength, and


coefficient of thermal expansion, the re-
pair material must be compatible with
the original concrete.
If the repair material used does not
match the original concrete in terms of
composition and strength, it may not
bond properly, leading to failure in its
strength, durability, and workability
Project Admir

One of Lebanon's largest projects ever, Admir, is a rare residen-


tial gem nestled between Adma and Ghazir in a serene green
area with a panoramic landscape that oversees the scenic moun-
tains and the peaceful Jounieh bay.

Project Admir consists of 78 buildings and 639 apartments. This


project needed about 500 workers, including engineers, accoun-
tants and designers
What do they know about BIM?
Are they implementing BIM?
Are they using Revit?
How does adjusting any plan on site work?

They use BIM as a methodology and Revit in their work as they im-
plement it in projects to make sure their work is 100% efficient

You can not adjust or change anything in the design and execution plan
without first contacting the consultant Knowing that the consultant is
the competent authority for any engineering adjustments.
Thank YOU!