… Introduction
1.1) Establishment
Established in accordance with CCE, b/n OCC(Gov’t owned)
& GTC (Foreign partner) with a share of 70 % : 30 %(Ref.
MoA & AoA No.10 & 25)
OPF Plc was emerged as one of the few manufacturer of
plastic pipes in Ethiopia since Nov. 2007 to manufacture Geo-
synthetic products with special attention to uPVC pipes.
Initiated to fill the supply gap of ‘development corridors’
projects.
Start of OPF
Oromia Plastic Pipe factory is established in accordance with the
commercial law of Ethiopia and as per the MoA and AoA No. 10
OPF = A joint venture
and 25 made between OWWCE & GTC (Foreign partner) with a
share of 70% & 30% to undertake the manufacturing of uPVC
between OWWCE (Oromia
pipes, geo-membrane and other related plastic products.
OPFOPF
Water
= Aisjoint
now ventureWorks
planning Construction)
to expandOWWCE
between its business so as toWater
(Oromia adjustWorks
itself
with the changing/growing business environment and aspires to
& GTC
Construction)
manufacture &highly (Golden
GTC demanded
(Golden Trade Trade
Company)
products of HDPE pipes and
fittings.
Company)
With this also, greater emphasis is given to establish a pipe
assembly plant that will permit greater opportunity for the factory
and the country as well.
..
Started production in the year 2007
Registered & paid up Capital = 77 Mil. Birr
• OCC= 53.9 Mil. Birr & GTC = 23.1 Mil. birr];
Certified & implemented ISO 9001: 2015 QMS.
Organized with manpower having different skills & experience in different
fields of specialization.
G.M ; 2 DGMs; 6 department managers.
Current man power=178 (176 permanent & 2 contract)
Shareholders Management
Internal
OPF The
Stakeholders Regional
Internal
Employee
Stakeholders
Government
External
Internal Stakeholders
Stakeholder
Private
Banks,
Insurance
CBE , NBE, Companies
Ethiopian Ministry of
Internal Insurance Revenue
Companies
External Stakeholders
Vision, Mission, Values and Principles
1.1. Engage in Export Conduct market study in Will be regular supplier to More wealth
market to earn foreign neighboring African these countries Business expansion
currency countries; Kenya, Somalia, Foreign currency demand More jobs
Sudan, south Sudan, Eretria will be fulfilled Improved income to its
and Djibouti workers
Profit will be doubled
Reliable source of supply
Operates at optimal More jobs, additional
both for Export and
capacity workers will be hired
domestic market
Maintaining product quality Shareholder value will
Export to same countries double
additional wealth will be
created
1.2 Engage stakeholders Factory side- Supply plastic Efficiency of exportable shortages of foreign
who are engaged in products required for agricultural production exchange for
exporting agricultural irrigation through consistent and importation of plastic
commodities as a raw materials resolved;
Stakeholders side-Imported reliable supply of plastic
Smooth operation and
shareholder Plastic raw materials products
sound business
operation
No Suggested core Output Outcome impact
strategy
1. Critical Issue – Shortage of foreign currency
Shortage of foreign currency is a critical issue for the factory as long as the factory imports all raw materials and machine spare parts from abroad to
run its production process
No Suggested core Output Outcome impact
strategy
1.3 Build good working · Secure the required foreign currency; · Consistent and reliable supply · More wealth
relations with · Un interrupted production of water pipes to government · Business expansion
government to be water works projects and · More jobs
contained in high organizations · Improved income to its workers
priority list to · Strong compliance to
secure foreign contractual agreements
currency
1.4 Create working · Open Bank accounts with client banks · Secure the required foreign Smooth business operation
relations with and depositing sufficient local currency currency; Business expansion
More Revenue
government and · Building strong business relationship · Sustained raw material supply
private banks · Optimum production
1.5 Examine our · Giving first priority for the projects run · Alignment of Factory policy · Improved potable water supply
collaboration how by the gov’t with government objectives; coverage of the public;
best we serve the · Criteria is set to fulfill the demands of · Assist timely completion of · Large coverage of irrigated
government the government when there is short public water development agriculture ensuring Increased
supply of pipes projects; agricultural production and food
self-sufficiency
No Suggested core strategy Output Outcome Impact
2- Critical issue : Shortage of working Capital loan from banks, both for ope ration and to ope n
L/C; Critical financial proble m
2.1 Setup a revolving fund by Financial challenges Healthy business Revenue growth
shareholders contribution for smooth operation operation; Increased
resolved Capacity utilization shareholder values
to be retained from their
uninterrupted Consistent
dividend payment and on production process production of pipes
time collection of
receivables
Create ownership right Ownership right on Working capital Optimum
2.2 over factory buildings to Factory building and loans available as production,
compound premises required, Higher revenues
allow collateral for bank
for collateral Smooth business Increased income
loans operation
No Sugge ste d core O utput O utco m e Im pact
strate gy
3- Critical issue : O ld and in-e fficie nt facto ry m achine rie s, lo w pro ductio n and pro ductivity due to facto ry
do wn tim e co uple d with fre que nt powe r inte rruptio n critical o pe ratio nal pro ble m
3.1 Renovation of existing Full scale maintenance of The optimum revenue Efficiency of machinery will
machineries; the plant facilities and generation will be increased
renovating the machine increased Sustainability uPVC pipe in
Replacement of old
parts with necessary latest The optimum Profit gain a competitive environment
machineries and a technology also will be increased Customer Satisfaction,
standby generator Purchasing one New stand Downtime due to power Retention of staff
by generator will be interruption will be
purchased minimized,
Replacing of the old belling Unit Costs of production
machines, Laboratory will decrease, which will
equipment, chiller units, result in price
and recycling machines; competitiveness
No Suggested core O utput O utcome Impact
strategy
4- Critical issue : Shift o f custo m e rs de m and fro m uPVC pipe s to HDPE pipe s and dive rsificatio n o f pro ducts
4.1 Product Diversification HDPE production lines, O ptimum re ve nue will be Business expansion,-capacity
Geo-membrane, Fittings, and generated for re-investing from Net
others installed O ptimum profit will be income
obtained High return to investment
Q ualified professionals
Maximization of Profit
recruited
5- Critical issue : Mainte nance wo rksho p
5.1 Establish workshop W ell organized and equipped Modification and/or Improved revenue, saving
facility and employ mechanical and electrical fabrication of worn out and costs of maintenance
workshop will installed damaged machine parts will Satisfaction of technical
technical crew that run
be undertaken within the workers and customers
the workshop factory Improved production
Re-winding of burnt motor efficiency;
coils will be maintained Reduced Factory down
internally within the factory time
5.2 Establish W ater pump Full fledged water pump Locally available water Increased and sustainable
assembly plant assembly facility pumps that reach many end agricultural production and
users exportable commodities
Strategic Area
uPVC 110,000
1 machineries 50,000 30,000 30,000
renovation
HDPE 95,600
2 95,600
Production lines
Geo-membrane
& fittings
3 200,000 200,000
manufacturing
plants and other
4 Spare parts 5,000 5,000 5,000 15,000
Workshop 50,000 50,000
5
establishment
Pump
6
Assembly*1
Total Investment 145,600 285,000 30,000 5,000 0 5,000 0 470,600
Cost
152,675
Working capital 140000 100000 192000 140000 111750 131000 151500 171000 188750 200750
Yearly
Summary of Capital required
for the strategic plan years
Share
Govern holders
ment
Source of Finance
Plastic Pipe Manufactures in the Country
List of Plastic Pipe Manufactures and Production Capacity
Description of Oromia Amhara HAKAMMAZ
S/n Geosyncthet
measuring Parameter Pipe TANA Water Concord Pipe Excle AZIZA Cosmetics &
ic Industrial MWA AZ PIPE
Factory Drilling Fit Industry Factrory Plastic PLC Plastic Fitsum
Works (GIW)
(OPF Plc) (APF) Factory Tenaye
Finfinn Finfinn
1 Location of the factory Finfinne Finfinne Finfinne Sebbata Bahirdar Finfinne Finfinne Finfinne Finfinne Bishan
e e Guracha
300.0
264.7
250.0
222.6
195.4 199.0
Mil.Birr
200.0
176.8 172.7 172.4
150.0 144.6 156.8 156.5
133.1 120.0
115.0
100.0 83.1
52.9 52.9 35.1 29.6 23.1 35.2
50.0
30.8 33.8
25.6 10.4 15.9 6.7
0.0 2.1 2.2
Budget year
TOTAL SALES (Mil.Birr) PROFIT BEFORE TAXATION
Economic Reform Agenda of the
country + Demand growth for
domestic food supply
32
Transported to Factory Compound
uPVC Scrap under crusher
34
Quality uPVC pipes reproduced from scrap
Advantages (Economic, Social & Environmental)
Efficient utilization public resources
Re-utilization of unused & lost resources
Confronting ineffectiveness
Income generation
Means of getting working capital
Hard currency saving /for raw material import/
Environmental protection from undecomposed plastic scraps &
residuals
Temporary job creation/ loading, unloading & transporting/
Never give up !!