PLAN OF DEVELOPMENT COMPETITION

OIL AND GAS INTELLECTUAL PARADE 2012

PETROLEUM ENGINEERING DEPARTEMENT


UPN VETERAN YOGYAKARTA
Lapangan Tango, Lapangan Cash, Lapangan Koboi

• Kajian Reservoir dan Produksi


• Mekanisme Pendorong
• Inflow Performance Relationship
• Perilaku Produksi Sumur
• Perilaku Produksi Lapisan
• Analisa Chans
• Decline Curve Analysis
• Analisa Keekonomian.
Kajian Reservoir dan Produksi
Data OOIP

Lapangan Metode OOIP (MMbbl)


Tangai
Tango Volumetrik 3,52
Bunian
Cash Volumetrik 3,45
Sukananti
Koboi Volumetrik 0,10
Total 7,07
Lapangan Tango

No PARAMETER Data

1 Daya Dorong Alami Gas Drive & Weak Water Drive


2 Porositas 20%
3 Permeabilitas -
4 Sor -
5 Jenis Batuan Reservoir Sandstone
6 Kedalaman Reservoir (m) 2000 m
7 Oil Gravity (API) 36
8 Viskositas minyak di tempat 3.5 Cst
Sifat Fisik Fluida

No. Lapisan Boi (bbl/stb) Der. API Temperatur ( C ) Pi (Psi) SG


1 HO
1 226.4 1816.57
2 K1
2 1.44 33.24 224.36 2001.28 0.8589
3 M3 1.29 226.4 2037.88
Mekanisme Pendorong
Mekanisme Pendorong
1.0

0.9

0.8

0.7
Drive Indeks

Lapisan 1
0.6

0.5

0.4

0.3

0.2

0.1

0.0
June-94 December-94 July-95 January-96 August-96 February-97 September-97 April-98
Waktu
DDI SDI WDI

1.0

0.9

0.8

0.7

0.6
Drive Indeks

0.5

0.4
Lapisan 3
0.3

0.2

0.1

0.0
October-92 May-93 November-93 June-94 December-94 July-95 January-96 August-96 March-97 September-97 April-98
Waktu
DDI SDI WDI
Inflow Performance Relationship
(IPR)
IPR Sumur

2500

2300

2100
1800
1900

1700

Pwf, PSI
1500
Pwf, PSI

1300
1300

1100

900 800

700

500

300 300
100 300 500 700 900 1100 1300 1500 1700 1900 2100 2300 2500 100 300 500 700 900 1100 1300 1500 1700 1900
LAJU ALIR, BLPD LAJU ALIR, BLPD

Tango 1 Tango 2
IPR Sumur (lanjutan)

2300 2300

1800 1800
Pwf, PSI

Pwf, PSI
1300 1300

800 800

300 300
100 300 500 700 900 1100 1300 1500 1700 1900 100 300 500 700 900 1100 1300 1500 1700 1900
LAJU ALIR, BLPD LAJU ALIR, BLPD

Tango 3 Tango 4
Perilaku Produksi Sumur
Perilaku Produksi Sumur Tango-1 Lapangan
Tango
1400 100
Qo (bbl/d)
Qw (bbl/d)
90
Qg (Mscf/d)
1200 WC (%)
80

1000
70

60
Laju Produksi

800

Water Cut
50

600
40

30
400

20

200
10

0 0
Jul-92 Jan-93 Aug-93 Mar-94 Sep-94 Apr-95 Oct-95 May-96 Dec-96
Waktu
Perilaku Produksi Sumur Tango 2 Lapangan
Tango
4000 100

90
3500

80
3000
70

2500
60
Laju Produksi

Water Cut
2000 50

40
1500

30
1000 Qo (bbl/d)
Qw (bbl/d) 20

500 Qg
(Mscf/d) 10
WC

0 0
Mar-94 Sep-94 Apr-95 Oct-95 May-96 Dec-96 Jun-97 Jan-98 Jul-98
Waktu
Perilaku Produksi Sumur Tango Lapangan Tango

900 100

800 90
Qo (bbl/d)
Qw (bbl/d)
Qg (Mscf/d) 80
700 WC (%)

70
600
Laju Produksi

60

Water Cut
500
50
400
40

300
30

200
20

100 10

0 0
Oct-96 Dec-96 Jan-97 Mar-97 Apr-97 Jun-97 Aug-97 Sep-97 Nov-97 Jan-98
Waktu
Perilaku Produksi Sumur Tango-4 Lapangan
Tango

500 120
Qo (bbl/d)
Qw (bbl/d)
450 Qg (Mscf/d)
WC (%)
100
400

350
80
Laju Produksi

300

Water Cut
250 60

200

40
150

100
20

50

0 0
May-97 May-97 Jun-97 Jul-97 Jul-97 Aug-97 Sep-97 Sep-97 Oct-97 Nov-97 Nov-97
Waktu
Perilaku Laju alir Lapisan
Perilaku Lapisan 1 Lapangan Tango
350 100

Qo (Laju Produksi Minyak)


Qw (Laju Produksi Air) 90
300 Water Cut (%)
80

250
70

60
Laju Produksi (bbl/d)

200

Water Cut (%)


50

150
40

30
100

20

50
10

0 0
Sep-97 Sep-97 Oct-97 Nov-97 Nov-97 Dec-97 Jan-98 Jan-98 Feb-98
Waktu
Perilaku Lapisan 2 Lapangan Tango

10000 100

90

80
1000
70
Laju Produksi (bbl/d)

60

Water Cut, (%)


100 50

40

30
10
20

Qw (Laju Produksi Air)


Qo (Laju Produksi Minyak) 10
Water Cut (%)
1 0
Jun-94 Dec-94 Jul-95 Jan-96 Aug-96 Feb-97 Sep-97 Apr-98
Waktu
Perilaku Lapisan 3 Lapangan Tango

10000 100

90

80
1000
70
Laju Produksi, (bbl/d)

60

Water Cut, (%)


100 50

40

30
10
20
Daily Oil
Daily Water 10
Water Cut
1 0
Oct-92 Apr-93 Nov-93 May-94 Dec-94 Jun-95 Jan-96 Aug-96 Feb-97 Sep-97 Mar-98
Waktu
Analisa Chan’s
Tango 1
100
Near Wellbore Water Channeling
WOR WOR'

10

1
WOR-WOR'

0.1

0.01

0.001

0.0001
10 100 Interval Days 1000 10000
Tango 2
1000
Multilayer Channeling
WOR WOR'
100

10

1
WOR-WOR'

0.1

0.01

0.001

0.0001

0.00001
10 100 1000 10000
Interval Days
Tango 3
100
Near Wellbore Water Channeling
WOR WOR'

10

1
WOR-WOR'

0.1

0.01

0.001
10 100 1000 10000
Interval Days
Decline Curve Analysis
Penentuan Zona Decline Lapisan 2 Lapangan Tango
10000 100

90

80
1000
70
Laju Produksi (bbl/d)

Water Cut, (%)


60

100 50

40

30
10
20

10

1 0
Jun-94 Dec-94 Jul-95 Jan-96 Aug-96 Feb-97 Sep-97 Apr-98
Waktu
Qw Qo Zone Decline-1 Zone Decline-2 Jumlah Sumur Water Cut (%)
Analisa Decline Lapisan 2 Lapangan Tango
1000 10

7
100
Laju Produksi (bbl/d)

Jumlah Sumur
5

10
3

1 0
Jun-94 Dec-94 Jul-95 Jan-96 Aug-96 Feb-97 Sep-97 Apr-98
Waktu
Qo (Laju Produksi Minyak) Decline-1 Decline-2 Jumlah Sumur Expon. (Decline-1)
Lokasi Sumur Infill Pada Lapisan 2 Lapangan Tango (Top
Struktur)

Tango 04
Tango 03

Tango 02
Tango 01
Penentuan Zona Decline Lapisan 3 Lapangan Tango

10000 100

90

80
1000
70
Laju Produksi (bbl/d)

60

Water Cut (%)


100 50

40

30
10
20

10

1 0
Oct-92 Apr-93 Nov-93 May-94 Dec-94 Jun-95 Jan-96 Aug-96 Feb-97 Sep-97 Mar-98
Waktu
Qo (bbl/d) Zone Decline-1 Zone Decline-2 Zone Decline-3 Daily Water(STB/D) Water Cut Jumlah Sumur
Analisa Decline Lapisan 3 Lapangan Tango

10000 10

8
1000
7
Laju Produksi Minyak

Jumlah Sumur
100 5

3
10
2

1 0
Oct-92 Apr-93 Nov-93 May-94 Dec-94 Jun-95 Jan-96 Aug-96 Feb-97 Sep-97 Mar-98
Waktu
Daily Oil (STB/D) Decline-1 Decline-2 Decline-3 Jumlah Sumur Expon. (Decline-1) Expon. (Decline-2) Expon. (Decline-3)
Lokasi Sumur Pada Lapisan 3 Lapangan Tango
(Top Struktur)

Tango 4
Tango 3

Tango 2
Tango 1
Lapangan Cash
Kurva IPR

Kurva IPR/VLP
2500

2000

1500
Pwf, Psi

1000

500

Qomax 3940.5 BOPD


0
300 800 1300 1800 2300 2800 3300 3800 4300
Qo, BOPD
Prod TIP/VLP
Performance Produksi
10000 90
Qo (bbl/d)
Qw (bbl/d)
Qg (Mscf/d) 80
Water Cut (%)

70

1000 60

50

40

100 30

20

10

10 0
Mar-97 Jul-98 Dec-99 Apr-01 Sep-02 Jan-04 May-05 Oct-06 Feb-08 Jul-09
Performance Produksi (Qo & WC)
Performance Produksi

1400 90

80
1200

70
1000
60

800 50

WC
Qo

600 40

30
400
20

200
10

0 0
Mar-97 Jul-98 Dec-99 Apr-01 Sep-02 Jan-04 May-05 Oct-06 Feb-08 Jul-09
Time
Chan’s diagnostic
100
WOR WOR'

10

1
WOR-WOR'

0.1

0.01

0.001

Near Wellbore Water Channeling


0.0001

0.00001
10 100 1000 10000
Interval Days
10000 10

7
1000

6
Laju Produksi (bbl/d)

Jumlah Sumur
5

100
3

10 0
Mar-97 Jul-98 Dec-99 Apr-01 Sep-02 Jan-04 May-05 Oct-06 Feb-08 Jul-09
Waktu

Qo Decline Zone 1 Decline Zone 2 Jumlah Sumur


Lapangan Koboi
IPR

2900.00

2400.00
PWF, Psi

1900.00

1400.00

900.00

400.00
0 100 200 300 400 500 600 700 800 900
LAJU ALIR, BPD
Performance Produksi Sumur Koboi-01
100 120

100

10 80

Water Cut (%)


Laju Produksi

60

1 40

Qo (bbl/d)
Qw (bbl/d)
Qg (Mcf/d)
Trend 1 20
WC (%)
Expon. (Trend 1)

0.1 0
Feb-96 May-96 Aug-96 Dec-96 Mar-97 Jun-97 Sep-97 Jan-98 Apr-98
Waktu
Chan Diagnostic Sumur Koboi-01
100

WOR WOR'

10

1
WOR, WOR'

0.1

0.01

0.001

Multilayer Chanelling

0.0001
1 10 100 1000
Interval Day
Indikator Keekonomian

• Pay Out Time (POT)


• Net Present Value (NPV)
• Rate of Return (ROR)
• Profit to Investment Ratio (PIR)
• Discounted Profit to Investment Ratio (DPIR)
Asumsi

• Jenis Kontrak : KKKS


• Waktu Proyek : 25
• Harga Minyak : 90 US$ per barel
• Bagian Negara : 73.26 %
• Bagian Kontraktor : 26.74 %
• Pajak Pemerintah : 45 %
• DMO : 20 %
1. Kerjakan soal ini dengan POD Murni.
2. Peserta diberi kebebasan untuk berkreatifitas dalam mengembangkan
lapangan ini sesuai dengan ketentuan yang berlaku.
3. Kekreatifitasan peserta dalam pengerjaan POD Lapangan ini sangat
dianjurkan selama masih bisa dipertanggungjawabkan.

SELAMAT MENGERJAKAN!!!