Professional Documents
Culture Documents
Suspension
• Albumin: Around (850 to 900kg).
• CWFI (Water for Injection) same
quantity of albumin. (first 70%
and 30%)
• Mixing time: 60 min.
• pH adjustment with NaOH
• pH= 6.9 to 7.1
• IR: 16% protein
• UF-120 filtration.
• IR value before starting is more and less
10%
• IR value to achieve is 14%
• Concentration Phase.
Diafiltration
and Heat Shock
• 2.5N NaCl required
• Total volume discard during
diafiltration.
• NaCl buffer solution (440 to
490 mOsm/.Kg)
Diafiltration
and Heat Shock
• Post- diafiltration
Concentration
• IR will be around 15% to 18%
after diafiltration.
• Final Volume is 14%
• Post wash: addition CFWI
and clean all the flow
connection process related
with UF.
Diafiltration and Heat Shock
• Stabiliser Calculation:
• Sodium Caprylate
• N-acetyl Tryptophan
• 2N NaOH solution
• Stabiliser Solution pH:
7.0 to 7.5
• Addition 1L/1min.
Heat Shock
• Temperature: 59.5 to 60.5
degrees.
• Start the Eurotherm
Electronic Recorded.
• Time: 3hr with 30minutes.
• Process starts when we get
59.5 degrees in PCS7.
Second
Clarification
• Flushing CUNO preparation
2x90 LA (CWFI x 30 min and
HWFI x 30 min.)
• Conductivity after the
flushing process ( Value: <
3uS/cm).
• Turbidity value during the
clarification must be less
than 8 NTU.
• Post flush volume taken
from PCS7.
Formulation 5%
Sterile
Sterilizing Filter Preparation. ( Flushing time and Sterilizing
Filter Test)
Autoclave Cycle (Equipment necessary to the set up)
Standardization Scales.
Pre-filter Preparation.
Sterile Filtration
Scale 5 Scale 6