SHUTDOWN SYSTEM
By Usama Sheikh
1
VISION, MISSION & VALUES
To be an inspiring business transforming
opportunities into sustainable realities.
Vision Innovation
Teamwork
Values Perseverance
Diversity
Mission Empowerment
01
Safety Instrumented Systems
02
HIMA PLC
03
HIMA Architecture through an
example
04
Some recommendations
05
3
Evolution of process safety
4
Safety instrumented system
5
Safety instrumented function
Overfill SIF I
O
O
LSH
I
Overpressure XV
SIF
PT
High Temp. O
SIF I
TSH XV
6
Layers of protection
Emergency Response
Dyke
Safety instrumented system
Relief Devices
Loss of
Operator Intervention
Basic Process Control System containment!
Process Design
7
Emergency Shutdown Systems at FFBL
8
HIMA Safety System
HIMA HIQUAD
Central rack
I/O rack
10
10
Central rack
11
I/O Rack
12
12
Low pressure SIF
PLC PSL
OIL OIL
PDSH
FILTER FILTER
Starter
RUN
OIL SUMP
STOP
RUN
OIL SUMP
TT
Lube oil
Filter being
starts pumping
to choke thruis
which
ESDS
PSLstarts
primarysends the backup
signal
pump, motor
to ESDS
detected bypressure
pdsh is
maintained
13
Low pressure SIF
Communication
module Redundant F3237: Safety Related Input module
SIL 3 redundant The main test routines are:
Coupling
Redundant module Central F3321: Non-safety related 16
outputAlarms
modules and with
events • Switch on and switch-off capability.
adds
communication
Data the
transfer rack
to DCS
Programming
line monitoring
display
Infinitewith andand
timing
MOSes! Module channel input card
address
I/O
modules bus to
is
provide
via the data
serial
MODBUS thebus HSR • input
Non-testable
DCS
monitoring
self-test
stampingpacket
through
capabilities
fromandcpu’s • Crosstalk of the circuits byw/o line 0 test
walking
HSRwith
LinkHIMA’s
and propriety
connect monitoring
EWSthe
to give viartcHIBUS
start
monitors
tocommand protocol
external systems the • input
Usedfilters
for non-safety signals
supply voltage • Function of the
EWS
through watch dog Coupling
• Correct function of the module- Short circuit and wire
I/O BUS Module
break of the sensor line
Line monitoring:
<3.6mA open circuit
>21mA short circuit
According to NE 43
16
Recommendations
Short Term
Upgradation:
F3236+F6250 F6217
Long Term
Upgradation:
18