Long Term Planning: Prepared By: Rahul Priyadarshy Engr (O&M/MTP)

Uploaded by

Prince Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd

LONG TERM PLANNING

Prepared By :
Rahul Priyadarshy
Engr (O&M/MTP)

09/30/2025 1
A LITTLE RECAP

09/30/2025 2
AGENDA
PRECAP
ORGANIZATIONAL STRUCTURE
FUNCTIONING OF LTP
LTP SYSTEM PROCEDURE
QUERY (IF ANY)

09/30/2025 3
INPUTS FOR PLANNING SYSTEM
A GOOD PLANNING IS 50% BATTLE WON
DETAILED AND DEFINED WORK ACTIVITIES
STANDARD WORK PATTERN & JOB
DISTRIBUTION
AVAILABILITY OF SKILLED MANPOWER &
MATERIAL
REQUIREMENT OF SPARES & CONSUMABLES
AVAILABILITY WELL BEFORE THE ACTUAL
EXECUTION
QUALITY CHECKS
BUDGETS ( TO ALLOCATE BUDGETS)

09/30/2025 4
LTP MANAGEMENT
TO WORK AS DATA & INFORMATION BANK
CUSTODIAN OF LICENSES
ACCURATE ASSESMENT OF RESOURCES i.e :
MANPOWER , SPARES , TOOLS ETC
DEVELOPMENT & STANDARDIZATION OF
QUALITY CHECK SHEETS
CO-ORDINATION AMONG AGENCIES
TO PROVIDE SERVICES TO MAINTENANCE
(i.e : INTERNAL CUSTOMER)
CO-ORDINATION WITH OPERATION & C&M
DEPTT
FEEDBACK SERVICES TO STATION
MANAGEMENT & CORPORATE CENTER
09/30/2025 5
STRUCTURE

MTP

STP LTP/OUTAGE CMG

09/30/2025 6
FUNCTIONING OF LTP/OUTAGE
TO PLAN FOR MAINTENACE WHEN ITMES ARE
IN SHUT DOWN CONDITION
TO PREPARE PLAN FOR OVERHAUL SCHEDULE
FOR NEXT EIGHT YEARS i.e : ROLLING PLAN
TO CO-ORDINATE OVERHAUL MEETING
TO PREPARE OVERHAUL & EQUIPMENT
OUTAGE REPORT
TO PROCURE ITEMS FOR OVERALL O&M AREA ,
SUCH AS : BEARINGS , ELECTRODES , STEEL
ETC
TO CONTROL & CONSOLIDATE INDENTS
RAISED FOR ITEMS
TO CO-ORDINATE MATERIAL & CONTRACT
MEETING FOR PROPER CO-ORDINATION
BETWEEN EXECUTION & SERVICE DEPTT
09/30/2025 7
OUTAGE
WHEN UNIT IS NOT AVAILABLE FOR
GENERATION
FORCED OUTAGE – DUE TO NON-AVAILABILITY
OF COAL
PLANNED OUTAGE – i.e : OVERHAUL
WE SHOULD HAVE MINIMUM FORCED
OUTAGE
THE DURATION OF PLANNED OUTAGE
SHOULD BE OPTIMAL
DAILY GENERATION LOSS DUE TO OUTGAE OF
1 UNIT IS APPROX 50 LAKHS
MORE OUTAGE DURATION - MORE
MAINTENANCE COST  LESS EFFICIENCY  8
09/30/2025
PLANNED OUTAGE i.e : OVERHAUL
EQUIPMENTS HAVE CERTAIN LIFE
THEY NEEDS MAINTENANCE
MANUFACTURER OF EQUIPMENTS PROVIDES DATA
SHEETS FOR REQUIRED MAINTENANCE
OVERHAUL  INCREASED LIFE OF EQUIPMENTS 
INCREASED LIFE OF STATION  MORE PROFIT
MINOR OVERHAUL – FOR 15 DAYS AT AN INTERVAL
OF 6 MONTHS TO INSPECT CRITICAL EQUIPMENTS
MEDIUM OVERHAUL – 45- 60 DAYS AT AN
INTERVAL OF 2 YEARS FOR BOILER & ITS
AUXILIARIES TO REVIVE UNIT EFFICIENCY
CAPITAL OR MAJOR OVERHAUL – 60- 75 DAYS AT
AN INTERVAL OF 4 YEARS FOR BOILER & TURBO-
GENERATOR & THEIR AUXILIARIES
09/30/2025 9
PREPARATION BEFORE OVERHAUL
ENGINEERING DECLARATION & SCOPE OF
WORK
. PREPARED 24 MONTHS PRIOR TO ACTUAL OH
OF UNIT
. PREPARED BY LTP-OUTAGE AFTER TAKING
NECESSARY INPUTS FROM MAINTENACE
SECTION
. THEY ARE REVIEWED & REVISED EVERY 6
MONTHS BY OUTAGE COMMITTEE
. OH WORKS OUTLINED IN THE SCOPE OF
WORK IS TAKEN CARE IN THE OH
. SPARES & SERVICES ARE REQUIRED TO DO
OH WORK,THEY ARE WELL PLANNED 24-18
MONTHS PRIOR TO ACTUAL OH
09/30/2025 10
PREPARATION BEFORE OVERHAUL
OVERHAULING PREPAREDNESS INDEX ( OPI)
. THIS IS A MEASURE FOR HOW WELL WE ARE
PREPARED FOR OH
. ALL INDENTED SPARES & SERVICES ARE FED
IN SAP TO GENERATE OPI SCORE
. OPI MEETING IS HELD EVERY MONTH TO
REVIEW OPI SCORE & CO-ORDINATE WITH
C&M DEPTT TO EXPEDITE THE DELIVERY OF
MATERIALS WELL BEFORE THE ACTUAL OH
. AWARD OF CONTRACT SERVICES & SPARES 3
MONTHS PRIOR TO ACTUAL OH

09/30/2025 11
OVERHAUL
OVERHAUL WORKS WILL BE REVIEWED BY
OUTAGE COMMITTEE WHICH IS HEADED
BY SR.SUPDT OF MTP
HIS JOB IS TO PLAN 7 REVIEW ALL
OVERHAUL RELATED JOBS FOR A UNIT
HE ALSO REVIEWS ALL PURCHASE &
CONTRACTS RELATED TO OVERHAUL
WORKS
TO ENSURE JOB QUALITY
TO ENSURE THE COMPLETION OF JOB
WITHIN STIPULATED TIME AT REDUCED
COST & REDUCED DOWN TIME WITH
OPTIMAL MAN POWER UTILIZATION
09/30/2025 12
QUALITY CHECKS
ONE OF THE IMPORTANT PARAMETERS FOR
A SUCCESSFUL OH
FQA PERFORMS SUCH CHECKS
TYPE –A CHECK – FOR CRITICAL ITEMS
WHERE INVOLVEMENT OF FQA IS
MANDATORY
TYPE –B CHECK – INVOLVEMENT OF FQA IS
NOT MANDATORY BUT STILL ITS BETTER IF
FQA IS INVOLVED
TYPE –C CHECK – FQA IS NOT INVOLVED IN
THOSE CHECKS
CHECKS ARE SUCH AS : SAFETY VALVES ,
SHAFT ROTOR , STATOR WINDINGS ,
BEARINGS , SUPERHEATER TUBES
09/30/2025 13
SPARE MANAGEMENT
INDENTS FOR PROCUREMENT OF SPARES
SUCH AS : BEARINGS , STEELS , ELECTRODES
ETC
TO RAISE INDENTS FOR COMMON ITEMS
TO EXPEDITE INDENTS BY CO-ORDINATING
MATRIAL & CONTRACT REVIEW MEETINGS
TO CONTROL THE ISSUE OF SPARES &
CONSUMABLES
TO KEEP RECORDS OF DATA FOR FUTURE USE
TO INSPECT THE SPARES FOR USE