- DocumentBreaking Out the Mastuploaded by
DQE040 HSSE
- DocumentAIR WINCH OPERATIONuploaded by
DQE040 HSSE
- DocumentAdjust Brake On Draw Worksuploaded by
DQE040 HSSE
- DocumentA.C motor Replacement(template)uploaded by
DQE040 HSSE
- Document213 Maintenance of motor of the Hydraulic systemuploaded by
DQE040 HSSE
- Document52. Enter Confined Sapce (Cellar)uploaded by
DQE040 HSSE
- DocumentSOP-4-Making Up & Break Out BHAuploaded by
DQE040 HSSE
- DocumentSOP-19-Load and Offload Containersuploaded by
DQE040 HSSE
- DocumentSOP-18-Mobil Tower Light Operationuploaded by
DQE040 HSSE
- DocumentSOP-17-Installation and Disassembly of Catwalkuploaded by
DQE040 HSSE
- DocumentSOP-16-Load and Offload Sledgeuploaded by
DQE040 HSSE
- DocumentSOP-14-Loading and Offloading Casings with Forkliftuploaded by
DQE040 HSSE
- DocumentSOP-15-Installation and Disassembly of BOP Hydraulic Control Lineuploaded by
DQE040 HSSE
- DocumentSOP-12-Installation and Disconnection of Live Head of Drilliing Lineuploaded by
DQE040 HSSE
- DocumentSOP-13-Loading and Offloading Casings with Craneuploaded by
DQE040 HSSE
- DocumentDQE SOP-183-Upper Substructure Disassemblyuploaded by
DQE040 HSSE