Watts Radiant Onix Tubing Installation Manual
Watts Radiant Onix Tubing Installation Manual
A v a i l a b l e S i z e s :
Onix is available in the following nominal I.D.: 3/8", 1/2", 5/8", 3/4", and 1".
O n i x M a n i f o l d s :
Watts Radiant offers a wide range of
manifolds for Onix. Manifold accessories
include unions, isolation valves, temperature
gauges, vent-and-purge assemblies, and flow
meters. Additional specifications can be found
in the Watts Radiant Onix Submittal or the
Watts Radiant full-line Product Catalog.
Introducing
Modular Control Panels
Our new Hydronex™ Panels come in three main
configurations: P-Series, D-Series, and Z-Series.
The 35 standard models can be customized, with
control and circulator options available. P-Series and
D-Series Panels feature the Rail Mount enclosure
while Z-Series Panels feature a Box Mount enclosure.
• Cost-effective
• Fast delivery
• Quick installation
• 35 standard models; more
with custom options
• Linked together or stand-alone
• Contractor-friendly
• Three circulator brand options Protective pin-mounted
To learn more about Hydronex panels call 800-276-2419, or go cover included.
to www.wattsradiant.com and click on the Hydronex link.
Onix is tested to relevant portions of several ASTM standards, carries the BOCA 4500 E. Progress Place Springfield, MO 65803-8816
certification mark as approved by BOCA research report number 95-47.1, and carries
the UPC mark as approved by the International Association of Plumbing and Mechani- USA & Canada: 800-276-2419 Phone: 417-864-6108 Fax: 417-864-8161
cal Officials. Watts Radiant is a charter member of the Radiant Panel Association. See our Radiant Catalog online at: www.wattsradiant.com
Copyright © 2005 Watts Radiant, Inc. Onix Installation Manual LIT#ONIXMAN0505 Effective: 05/01/2005
Snowmelting Applications
This Onix Installation Manual represents the
Slab on Grade
collective knowledge of thousands of our cus- Warm up a concrete slab to provide space heat.
tomers who have been kind enough to furnish us Install a minimum of 2" of
concrete above the top of the Onix for
with ideas and techniques that have worked for residential and 3" for commercial floor heat
applications.You may need a greater
them. We have selected the best of these ideas thickness over the Onix, depending on
structural loading.
and rigorously refined them. Use an extruded polystyrene (Dow¤ Blue Board¤ )
insulation board on the edge of, and optionally under
the slab, depending on site conditions.
combined experience with modern floor heating Where space permits, we recommend the use of extruded polystyrene Use a foil-faced insulation for this application, with the foil facing up, and
(Dow¤ Blue Board¤ ) insulation at the perimeter of the new slab. a 2" minimum air space between the foil surface and the steel deck.
and snowmelting. Please take the time to The use of poly-fiber material in the new concrete slab will add crack Sprayed-on insulation also works well in this application.
resistance.
carefully read this manual before installing your
In this application the Onix can be tied to rewire or poultry netting
depending on the structural needs of the project.
floor heating or snowmelting system.
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Heat Transfer Basics . . . . . . . . . . . . . . . . . . . . . . . . . . .6
Onix™ Radiant Piping . . . . . . . . . . . . . . . . . . . . . . . . . .6
The Design Process . . . . . . . . . . . . . . . . . . . . . . . . . . . .7
Step 1: Initial Design Considerations . . . . . . . . . . . . . .8
Floor Coverings . . . . . . . . . . . . . . . . . . . . . . . . . . . .8
Tile Floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9
Hardwood Flooring . . . . . . . . . . . . . . . . . . . . . . . .9
Controlling Moisture . . . . . . . . . . . . . . . . . . . . .10
Installation Cautions . . . . . . . . . . . . . . . . . . . . .11
Carpet and Pad Flooring . . . . . . . . . . . . . . . . . . .12
Step 2: Radiant Zoning . . . . . . . . . . . . . . . . . . . . . . . .12
1. Zoned by Floor Coverings . . . . . . . . . . . . . . . . .12
ZONE 1 2. Zoned by Occupancy . . . . . . . . . . . . . . . . . . . . .12
ZONE 2A 3. Zoned by Construction . . . . . . . . . . . . . . . . . . . .12
ZONE 2
4. Zoned by Mechanical Considerations . . . . . . . .12
Step 3: Manifold Location . . . . . . . . . . . . . . . . . . . . .13
Typical radiant zoning.
Step 4: Heat Loss Calculations . . . . . . . . . . . . . . . . . .14
Using RadiantWorks® Reports . . . . . . . . . . . . . . . .14
Zone List Report . . . . . . . . . . . . . . . . . . . . . . . . .15
Assumption Report . . . . . . . . . . . . . . . . . . . . . . .15
Heat Loss Report . . . . . . . . . . . . . . . . . . . . . . . . .15
Applications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16
Frame Floors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16
Design Parameters . . . . . . . . . . . . . . . . . . . . . . . . . . .16
Onix Spacing . . . . . . . . . . . . . . . . . . . . . . . . . . . . .17
Perimeter Banding . . . . . . . . . . . . . . . . . . . . . . . . .17
Staple-Up™ Applications . . . . . . . . . . . . . . . . . . . . .18
Tools Required . . . . . . . . . . . . . . . . . . . . . . . . . . . .18
Fasteners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18
Staple Gun . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .18
Staple-Up™ Applications Installation Steps . . . . . . . . . . . . . . . . . . . . . . . . . . . .19
Step 1: Install Manifolds . . . . . . . . . . . . . . . . . . . . .19
Step 2: Zone Boundaries . . . . . . . . . . . . . . . . . . . . .20
Step 3: Tubing Requirements . . . . . . . . . . . . . . . . .20
Step 4: Drill Joists . . . . . . . . . . . . . . . . . . . . . . . . . .20
Step 5: Install Onix . . . . . . . . . . . . . . . . . . . . . . . . .20
Step 6: Repeat With Next Circuit . . . . . . . . . . . . . .21
Step 7: Visual Inspection . . . . . . . . . . . . . . . . . . . .22
Step 8: Pressure Test . . . . . . . . . . . . . . . . . . . . . . . .22
Insulation Details . . . . . . . . . . . . . . . . . . . . . . . . . . . .23
TJI Joists . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .23
Open Web Joists . . . . . . . . . . . . . . . . . . . . . . . . . . .23
Layout Examples . . . . . . . . . . . . . . . . . . . . . . . . . .24
page 2 Watts Radiant: Onix Installation Manual
Table of Contents
Section Page
Appendix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .58
Fluidd F
Flui Flo
low Supp
pply Man
Manifold
fold
Manifolds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .58
Factory Supplied Manifolds . . . . . . . . . . . . . . . . . .58
Field Constructed Manifolds . . . . . . . . . . . . . . . . .58
Flui
Fl uidd F
Flo
low Return
rn Man
Manifold
fold
Manifold Set Up . . . . . . . . . . . . . . . . . . . . . . . . . . .59
Onix Circuit Balancing Valves . . . . . . . . . . . . . . . . . .61
Onix Clamps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .61
Field Repairs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .61
Pressure Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .62
Manifold Options
Nomograph . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .63
Pressure Drop Charts . . . . . . . . . . . . . . . . . . . . . . . . . .64
Near Boiler Piping . . . . . . . . . . . . . . . . . . . . . . . . . . . .69
Primary/Secondary . . . . . . . . . . . . . . . . . . . . . . . . . . .69
Point of No Pressure Change . . . . . . . . . . . . . . . . . . .69
Circulator Sizing . . . . . . . . . . . . . . . . . . . . . . . . . . . .69
Step 1: Determine Zone Flow Rate . . . . . . . . . . . .70
Step 2: Determine Circuit Flow Rate . . . . . . . . . . .70
Step 3: Determine Zone Pressure Drop . . . . . . . . .70
Step 4: Determine Supply/Return
Pressure Drop . . . . . . . . . . . . . . . . . . . . . . .70
Step 5: Determine Complete
Pump Spec . . . . . . . . . . . . . . . . . . . . . . . . .70
Expansion Tank Sizing . . . . . . . . . . . . . . . . . . . . . . .70
Piping Mixing Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . .72
Mix Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .72
Injection Pump . . . . . . . . . . . . . . . . . . . . . . . . . . . .73
General Schematics . . . . . . . . . . . . . . . . . . . . . . . . . .75
All of these features relate to one 3/8" . . . . . . . . .3" . . . . . . . . . .6.25 gal. . . . . . . . . . . . . .200 ft. . . . . . . . . . . . .600 ft.
major benefit - longevity. Onix carries 1/2" . . . . . . . . .4" . . . . . . . . . .10.25 gal. . . . . . . . . . . . .300 ft. . . . . . . . . . . . .600 ft.
5/8" . . . . . . . . .5" . . . . . . . . . .16.0 gal. . . . . . . . . . . . . .400 ft. . . . . . . . . . . . .600 ft.
3/4" . . . . . . . . .6" . . . . . . . . . .25.00 gal. . . . . . . . . . . . .500 ft. . . . . . . . . . . . .400 ft.
1" . . . . . . . . .8" . . . . . . . . . .45.00 gal. . . . . . . . . . . . .600 ft. . . . . . . . . . . . .200 ft.
*Lengths indicated are non-factory spliced lengths. Longer factory spliced lengths are available upon request.
For a slab on or below grade, a mini- similar precautions should be 2. Do not allow the flooring to be
mum 6 mil plastic vapor barrier should observed, as the plywood subfloor delivered before the masonry and
be used under the slab to prevent the may also be saturated with moisture. plastering are completed and fully
absorption of ground moisture through dry, unless a dry storage space is
the concrete during the non-heating The recommended procedure is to first available.
season. Verify with local code and drive off the moisture in the slab, then 3. Have the heating plant installed
building practices. heat the plywood subfloor for a few before the flooring is delivered.
days before unwrapping the finish 4. Break open the flooring bundles
Before wood flooring is installed over flooring from its factory packaging. and expose all sides of the flooring
any slab or elevated thin slab, the slab to the atmosphere inside the struc-
should be well aged. Preferably, the Plywood or oriented strand board ture.
slab should have been heated for at make good candidates for subfloor 5. Close up the house at night and
least a week before the flooring is materials in radiant installations. Do raise the temperature about 15¡F
delivered. Pre-heating the slab before not use particleboard as a subfloor. above the outdoor temperature for
flooring installation will drive out 3 days before laying the floor.
residual moisture that might cause USDA Forest Service 6. If the house is not occupied imme-
problems. This pre-heating must be diately after the floor is laid, keep
done before a surface vapor barrier is The following procedures are recom- the house closed at night or during
installed. mended by the USDA Forest Services damp weather and supply some
Wood Handbook . heat, if necessary, to keep the
Cracks develop in flooring if (the house at about 65¡F.
wood) absorbs moisture either before
% Moisture Approx. Width
Change Change/Inch Without a vapor barrier: moisture With a vapor barrier, moisture
Standard slab on grade moves through a slab via capillary is prevented from entering the
1 1/128" construction movement. slab.
4 1/32"
8 1/16"
12 5/64"
16 7/64"
20 9/64"
24 11/64"
The above illustration uses the occu- With respect to any design, the mani-
pancy technique for zoning, dividing fold location has a direct impact not
the waking areas from the sleep- only on the aesthetics of a room, but
ing areas. Zoning choices are subject also on the tubing being installed.
to change as the design progresses. It
is not uncommon to go back and 1. Manifolds should be placed in a
rearrange rooms and zones to create a location that allow them to remain
better overall design. accessible, but also out of sight. In
cabinets, behind doors, and in clos-
ets are good locations. These loca-
tions allow for the use of a cover
plate or manifold box over the
Supply Line
perature to stay comfortable. With
Return Line
radiant heat, the indoor thermostat
Manifold mounted on side of joist. can be set 2¡—3¡ lower.
Use fasteners, as necessary, to support Onix and to maintain proper bend radii.
2. Indoor air movement and tempera-
ture gradient is greatly reduced.
This reduces heat loss through
the ceiling.
Manifold Mounting Bracket
Using RadiantWorks®
larger manifolds, 1-1/4" to 6" i.d., addition, the use of these unadjusted Reports as a Design Tool
are available. calculations will tend to oversize boil-
ers, circulators, and piping, as well as For most projects, the radiant design
the amount of radiant piping required. will be performed using Watts
Step 4: There are four major factors that Radiant s RadiantWorks design soft-
reduce heat loads as compared to con- ware. This is an easy, efficient way to
Heat Loss Calculation
ventional heating systems. apply the design steps discussed earli-
Conventional heat loss calculations er. A variety of reports are available
1. Lower indoor air temperatures through RadiantWorks, including a
can be used to size radiant heating can be maintained for greater
equipment; however they tend to over- Zone List, an Assumption report and a
human comfort. When the floor is Heat Loss report. These reports help to
state the actual heat loss that a radiant- radiantly warmed, the human body
ly heated building experiences. In transfer information about a given
does not need as warm an air tem- project quickly without unnecessary
guess work.
Zone Specifications
Supply Delta T GPM Head Radiant Product Tube No. of
Assumption Report
Fluid [∞F] [∞F] [ft] Panel Type Length [ft] Circuits The Assumption Report is a way to
Load
[Btu/h]
convey information about the heating
112 20 2.4 2.1 24,038 3/8" Onix 200 11 system to those working on the proj-
Pump Specs & Radiant Panel Load are calculated on the smaller of ect. It shows all of the assumed values
Required Heat or Radiant Capacity (+ back and edge losses)
and conditions taken from a plan or
RadiantWorks Assumption Report blueprint when calculating the heating
Project Assumptions load for a project. If things are differ-
ent from what is assumed, then
OutsideTe Elevation Wind Glycol Job Type System
mp [∞F] [ft] Speed Chemicals
changes to the heating design need to
[mph] be made.
0 1268 10 None Residential No
Room Construction Parameters: If the window size for the family room
Space Below: Crawl Crawl Space Yes goes from 30 sq.ft. to 50 sq.ft., the
Space Insulation:
Foil Faced 3.5 in Tube Spacing: 8 heat loss through that section of wall
Insulation just increased over 60%! This simple
Thickness:
construction change might require
Room Heat Loss Parameters: modifications to the radiant heating
Indoor Design 68 F Max Eff. Surface: 85 F Heating Intensity: 15.70 Btu/h
Temp: ft≤
system, such as additional banding
Floor Covering: Tile Floor & R Value: 0.16 Unheated Floor R 19 (tighter tube spacing along an exposed
Mudset Value: wall) or higher water temperatures and
ACH: 0.5 CFM: 7.867 Number of Stories: 1
Ave. Ceiling 9 ft Exp'd Ceiling Area: 118 ft≤ Ceiling R Value: 30 possibly a larger heat source.
Height:
Foil
oil Fa
Facedd Insulation
on
Banding Areas.
Onix is often installed at closer spacings at the perimeter of exterior rooms to improve comfort.
Onix Cautions
Step 5:
Install the Onix
Place the unwinder underneath the
Onix routed from Staple-Up to manifold with a coil of Onix placed
manifold in wall. over the center post and cut the bind-
ing straps on the coil. Pull one end of
Wall Stud
1-3/4” hole should be placed 1/3 to 1/2 way down from the top of the joist.
Onix
Staple
Joist
Band Joist
It is always a good idea to connect the Repeat until the Onix comes off the
circuits to the manifolds in reverse unwinder. Attach the free end to the
return pattern, i.e. the first water in, return manifold.
is the last water out.
Step 6:
Repeat With The Next Circuit
Repeat steps 4 through 6, keeping the
new series of joist holes at least 8"
away from the first to maintain struc- Make sure to use all of the Onix tubing
tural integrity of the joist. Pull the specified for the zone. Do not cut cir-
cuits to make them shorter as an imbal-
Onix down to the first open bay, gen-
Typical Onix Staple-Up. ance in flow may occur
Step 8:
Final Assembly and
Pressure Test
With the zone fully installed and
inspected, finish the connections to the
manifold. Begin by identifying corre-
sponding ends to the same circuit. If
the tubing has not been marked, select
two circuit ends and blow through one,
with a thumb placed over the other
end. Air should be felt on the other
side, confirming both ends of the same
Zone 1
Main Living Area circuit have been selected.
Insulation needs to
Foil-faced batt insulation. make contact with
the header beam
to create a sealed
cavity.
TJI Joist
Open Web Trusses offer several advantages
on large construction projects. Webb Truss
floors can carry heavier loads and can span
greater distances.
To help seal the joist cavity, the insula- tained. It still remains critical that the
tion needs to be placed up against the insulation does not touch the radiant
header plate of the truss. This will pre- tubing.
vent air from moving from bay to bay
and from moving downward to the
environment below. By doing this, a
2" air gap is no longer a possibility.
If the insulation is placed so it just
extends into the header space, a 1/2" -
3/4" air space should be easily main-
Layout Examples
e Floor: Step
Frameby Floor:
Step Step
Frame
me by :Step
Floor:
F Ste
Step by Step
Supply Manifold Supply Manifold Supply Manifold Supply Manifold Supply Manifold Supply Manifold Supply Manifold Supply Manifold
Return Manifold Return Manifold Return Manifold Return Manifold Return Manifold Return Manifold Return Manifold Return Manifold
bove illustration
The aboveshows
The aabove
serpentine
illustration showslayout
a serpentine
illustration layout The
shows a serpentine above illustration
layout The aboveshows aabove
sperpentine
illustration
The shows layout
a sperpentine
illustration The above illustration
layout layout
shows a sperpentine The aboveshows how to illustration
illustration
The above "pick
shows up"how
ashows
bay
to "pick
howup"toa"pick
bay up
Thisparallel
illustration shows a serpentine layout with a This
banded area
with arunning
banded
with aarea to the
running
banded areaexposed
parallel
runningto parallel to thewith
the exposed a banded
exposed withillustration
area arunning
banded shows a serpentine
withperpendicular
aarea running
banded area the layout
toperpendicular
running
with a
to the
perpendicular
This illustration
the the previous
towhen
shows
when thehow
circuit to “pick mid-run.
terminates
previous
when
up” a bayThe
thecircuit
previous terminates mid-run. The
circuit terminates mid-run
banded area running parallel to the exposed wall. banded area running perpendicular to the when the previous circuit terminates mid-run. The
The bandedwall.area
Theiswall.
spaced
banded atbanded
Thearea 4"isoc.spaced 4" oc. at 4" oc.exposed wall. exposed
at spaced
area is The banded wall.area
exposed Theiswall.
spaced
banded atbanded
Thearea 4" isoc.spaced at spaced
area is 4" oc. circuit loops
4" oc. atsecond second back down
circuit
second the
loops open
back
circuit bay back
down
loops from the bay
the open
down the from
openthe ba
The banded area is spaced at 4" o.c. exposed wall. The banded area is spaced at 4" oc. second circuit loops back down the open bay
far end. The remainder
far end. of
The
farthe
end.circuit
remainder
The
from the far end. The remainder of the circuit is
is installed
of the
remainder in
circuit
ofthe
is
the installed
circuit isin the
insta
same fashion
installed in theas the first
same
same fashioncircuit.
same
fashion as the
thefirst
asfashionfirstascircuit.
the first circuit.
circuit.
Supplyy Manifold
Supply Supply
Supplyy Manifold Supply
Supplyy Manifold
Return
Return Manifold Return
Return Manifold Return
Return Manifold
Ste
tep 11
Step Ste
tep 2:2
Step Ste
tep 3:3
Step
Frame F
Floor:: C
Counte
ter Flow
w Me
Method Frame Floor:
F : C Counte
ter Flow
w Me
Method
Supply
Supplyy Manifold Supply
Supplyy Manifold
Return
Return Manifold Return
Return Manifold
Ste
tep 4:6
Step Ste
tep 5:5
Step
Long manifolds are installed perpendicular to the floor joists. To ensure balanced
flow through each circuit, a reverse return method is recommended. A reverse return
manifold requires a third copper line to be installed. This extra line allows each
circuit to “see” the same total manifold length, thus creating a balanced system.
For more information on long manifolds and other manifold options, refer to the
Appendix.
Flow
Supply Manifold Capped End
Flow
Capped End
Flow Flow
Supply Manifold
Flow
Capped End
Return Manifold
Capped End
Flow
Return Manifold
Step 7:
Repeat With
The Next Circuit
top. If a thinner subfloor is to be used, Pull the free end of Onix from the Repeat steps 4 through 6, keeping
a tighter sleeper spacing will be unwinder and begin placing it along the new series of sleepers spaced
required. This is usually done by the position sleeper to the far end of according to the required tubing
adding a sleeper between each run of the room/zone. Alternate sleepers in spacing. If a partial sleeper bay
Onix. between Onix runs. It is generally eas- needs to be filled, cut in a new tran-
ier to install full sleeper lengths and sition point 8" from the previous
Whenever possible, run the sleepers then cut transition points in a sleeper point for the new circuit.
perpendicular to the joist direction. run with a circular saw.
This will help add stability and stiff- Make sure to use as much of each
ness to the floor. circuit as possible. If the last circuit
is too long, try not to cut it. Shorter
Step 5: circuits have a lower pressure drop
Install the Onix
Place the unwinder underneath the
manifold with a coil of Onix placed
Finished Upper Floor
over the center post and cut the bind-
Upper Subfloor
ing straps on the coil. Pull one end of Sleepers
the Onix off the unwinder and loosely Duct Tape
attach it to the first barb of one of the Onix
manifolds. Take a white paint pen, or
other marker, and mark this end of
Onix with a number 1, indicating the Foil-Faced Insulation
first circuit installed. Do the same to
the other end of Onix, marking it with
the number 1. This will help later in
the installation process.
Floor Joist
Do not push the Onix on more than
the first barb at this point, just in case
the circuit needs to be removed.
Onix Tubing
Insulation Board
Nailer
Onix Tubing
Poultry Netting (chickenwire)
Poultry Netting
Interior Wall
Wall Stud/ Foil-Faced Batt Insulation
Ceiling Joist Onix transitioning from one
Onix (Cross Section) joist/stud bay to the next
Cross section of a wall or ceiling application using poultry netting (chicken wire).
8”o.c.
Recessed Wall
Supply/Return Manifolds
Typical wall or ceiling application using a recessed insulation or plywood board.
Cross sections of a wall or ceiling application using a recessed insulation or plywood board.
SubRay¤
Wall Stud/
In some cases, the wall or ceiling cavi- Ceiling Joist
ty may not be deep enough to allow
for the Onix, insulation and support
material. In these cases, Watts Radiant
SubRay can be used. This will go on Support for
Header Stick
top of the wall studs or ceiling joists.
Sleeper
Onix
Header Stick
Gripper
Supply/Return Manifolds
Onix Spacing
In applications
where rewire/rebar is
not used and an insu-
lation board is
Primary Tubing placed underneath
the slab, some addi-
Interior Wall
tional attachment
devices can be used
to secure the Onix.
Watts Radiant s
Foam Staples or
Foam Clips can be
used to secure the FoamBoard Stapler™
Onix tubing directly
to the insulation
board. Standard
Onix staples can be
used if a thin slab is
Supply
Supply Manifold
Manifold
installed over a
Return
Return Manifold
Manifold wood subfloor.
Installation Steps
The most common installation pattern Lay Onix across slab area,
for slab applications is a double ser- keeping tubing spaced to
design conditions.
pentine layout, although in some cases
a single serpentine may be used.
Step 1:
Pre-Pour Conditions
Step 3:
Determine Zone
Boundaries
Step 4:
Confirm Tubing
Requirements
This double serpentine layout places cuits with the zone are in position.
Step 9:
the cooler return end of the circuit Leave 2’—5’ slack on each circuit in
next to the warmer supply end. This case the manifold position needs to be Final Assembly and
layout helps bring the finished floor adjusted from its temporary location. Pressure Test
surface to an even temperature in the
shortest time possible. After all circuits are in place and any With the zone fully installed and
adjustments have been made, fasten inspected, finish the connections to the
Unless the zone has only one loop or the Onix to the wire mesh or insula- manifold. Begin by identifying corre-
has a very short exterior perimeter, do tion board every one to two feet. This sponding ends to the same circuit. If
not heat more than half of the perime- will keep the Onix from shifting or the tubing has not been marked, select
ter with one circuit. floating during the concrete pour. If two circuit ends and blow through one,
cable ties are used, do not pull the ties with a thumb placed over the other
Step 6: so tight that the Onix is flattened or end. Air should be felt on the other
pinched shut. Also, make sure all side, confirming a single circuit has
Securing the Onix
tails of the cable ties are either cut been selected.
Slab applications usually require some off or turned downward to prevent any
unwanted surface protrusions. Take one Onix Clamp and slide it over
form of fastener, depending on the
one end of tubing. Slide the clamp
construction details. Most slab applica-
Step 7: down about 2" from the end and push
tions use rewire or rebar to add
strength or crack resistance to the slab. Repeat With The Next
In this application, the Onix attaches Circuit Manifold
directly to the rewire/rebar by the use
of cable ties or ClipTie clips. If the Repeat steps 4 through 6, keeping the
slab is poured without the next circuit spaced according to the
rewire/rebar, other fasteners can be design. Make sure to use as much of
used that will secure the Onix directly Onix Clamp Onix Barb
each circuit as possible. If the last cir-
to the foam insulation beneath the cuit is too long, which sometimes hap- Onix
slab. pens, try not to cut it to make it short-
er. Shorter circuits have a lower pres-
After no more than three circuits have sure drop and will tend to cause an
been roughly laid out, tie down imbalance in the fluid flow. Some tub- Manifold
enough of the bends in the circuits to ing may be removed from this last cir-
temporarily hold the Onix in place. cuit as long as the remaining length is
Lay out all of the remaining circuits in within 10% of the existing circuits.
the zone before tying down more than For example, if 200 ft. lengths were
the bends. This helps eliminate time installed, the last circuit can be cut to a
and wasted fasteners in the event cir- length of 180 ft. and still maintain a Pressure Test Kit
cuits need to be moved or adjusted. balanced system. If more than 10% is
Repeat this process until all of the cir-
Return
rn Manififold
ld
Return Manifold
Tools and Materials 3. Manifold. al damage has been done to the tub-
Required Only use manifolds provided by ing during installation.
Watts Radiant or Watts Radiant
It is a good idea to make sure all mate- manifold components for field con- 9.Installation Accessories
rials are present and in good working structed manifolds. a. Spray Paint: For marking
order before beginning a radiant instal- out zones and subzones,
lation. The following is a list of the 4. Unwinder. as well as areas not to be
most common items needed for a typi- A required component for easily heated.
cal Thin Slab installation. unrolling each precut Onix coil b. Electrical Tape: For
without kinks and twist. temporarily mounting the
1. RadiantWorks Reports. manifolds or taping ends of
These reports will ensure the proper 5. Field Repair Kit. tubing together.
amount of tubing is installed in each Each kit will contain two barb-by- c. Cable Ties, ClipTies,
area, along with the correct manifold barb splices and four Onix Clamps. Screw Clips or other
size. fasteners.
6. Manifold Mounting Bracket.
2. Onix tubing and corresponding Each bracket can be used to tem-
number of Watts Radiant Onix porarily or permanently mount each Fasteners
Clamps. manifold pair to the floor or wall.
Each Onix TorqueTite clamp will Use Watts Radiant Manifold brack- Although the Watts
ets or SnapClips to hold manifolds. Screw Clips
require an in.-lb. torque wrench for Radiant staple gun is
installation, while the SelfTite the most useful
clamps need a pair of SqueezeTite 7. Watts Radiant staple gun, staples attachment tool,
Pliers. See manifold assembly sec- and NailTites. other fasteners are
Foam board Staple available for areas
tion for more details. The number of
Onix coils on the jobsite should cor- 8. Pressure test kit. where the staple gun
respond to the number listed in the Each manifold pair must be pressure can not reach. Watts
Zone List report. tested. This helps ensure each Onix Radiant s NailTites
connection has been performed cor- are used to secure Onix at turns and
rectly and to make sure no addition- bends and in areas inaccessible to the
staple gun. Both staples and NailTites
Return
rn Manif
Return ifold
ld
Manifold
Step 7:
and construction details may make one arm. Make sure the staple gun is set to
Visual Inspection
method easier to install. 100 psi and does not flatten or deform
the Onix. Other applications may use a
After all the circuits are installed, take
Walls and Built-Ins a few minutes to walk each circuit and
visually inspect the tubing for possible
In most thin slab applications, built-ins damage caused during installation. If a
such as cabinets, showers and walls damaged area is found, repair it using
are already in place before the thin Onix Good Staple Onix deformed an approved Watts Radiant Repair Kit.
slab is poured. This also means these too much.
More information on the repair kits
items are in place before the radiant can be found in the Appendix.
tubing is installed. foam installation board below the thin
slab. In these applications, FoamBoard
Staples or ScrewClips can be used. In Step 8:
Walls and other structural members
can often create unique situations with each case, secure the Onix to the floor Final Assembly and
tubing layouts. Most structural code every 18". Pressure Test
requirements restrict the amount of
material that can be removed from a Step 6: With the zone fully installed and
wall member. Because of this, it is Repeat With inspected, finish the connections to the
advised to try to run the Onix tubing manifold. Begin by identifying corre-
The Next Circuit
through doorways when ever possible. sponding ends to the same circuit. If
the tubing has not been marked, select
Repeat steps 4 through 6, keeping the
Step 5: Securing the Onix two circuit ends and blow through one,
next circuit spaced according to the
with a thumb placed over the other
design. Most thin slabs use circuit
Most thin slab applications will end. Air should be felt on the other
spacing of 6", 9" or 12" on center.
require some form of fastener, depend- side, confirming a single circuit has
Don t space the tubing wider than 12"
ing on the construction details. When a been selected.
on center as possible thermal striping
thin slab is being installed over a sub- may occur. Likewise, spacings tighter
floor, standard staples are used. To Take one Onix Clamp and slide it over
than 6" on center is not advised due to
help reduce installation time, the staple one end of tubing. Slide the clamp
possible structural conflicts with the
guns may be fitted with an extension down about 2" from the end and push
thin slab material. If tighter spacing is
the Onix onto the first barb of the sup- For a thin slab application over an
ply manifold, making sure the tubing existing concrete slab, one inch
covers the entire fitting. If the Onix is extruded polystyrene insulation board
difficult to push onto the barb, lubri- is recommended to isolate the new
cate the end of the Onix with some pour from the existing. If a one-inch
water. board is unavailable or if space does Board insulation is used to isolate the thin slab
not allow for a 1" board, a thinner from the subfloor below. ScrewClips are used to
Do not use soap, oil, WD-40®, or secure the Onix to the foam insulation board.
board can be used. It is not recom-
Additional insulation may be added below, in the
other petroleum or silicone based mended to go below a 1/2" insulation joist cavity, for an increased R-Value.
lubricants as they may damage the board.
interior of the Onix tubing. Soap or
lubricants may make the connects and Thin Slab with Sleepers
splices leak, even at low pressures.
Sleepers are sometimes installed with-
Do not over-tighten the Onix in a thin slab application to allow for
TorqueTite clamp. Tighten points of attachment for future floor
TorqueTite clamps using an in.-lb. coverings. The most common applica-
torque wrench. More information on tion is with a hardwood floor.
how to make the TorqueTite or
SelfTite connection can be found in Caution: The thin-slab surface Onix tubing stapled down to the subfloor with
the Appendix. must contact the upper wood floor paper faced batt insulation located below in the
or subfloor. Thin slab can shrink joist cavity. Since no foil facing is used, the insu-
during curing, creating an air gap. lation has to be installed against the subfloor. A
lightweight concrete filler is used between the
Insulation Details sleepers for added sound quality and increased
thermal mass.
Foil-faced insulation is primarily used
when an air gap can be maintained
between the tubing and the insulating
member. In the case of a thin slab
application, the tubing is completely
encapsulated in the lightweight con-
crete, eliminating any need for an air
Precast Slabs
Supply/Return Manifold
Brick Paver
Onix
Supply/Return Manifold
Slab
Onix
Rewire/
Rebar
Base Material
Subgrade / Gravel
9. Installation Accessories
a. Electrical Tape for
Subgrade / Compacted Earth
temporarily mounting the
manifolds or taping ends of
Typical Snowmelt Slab on Grade with RailWays. tubing together.
b. Cable Ties, ClipTies,
Screw Clips or other
fasteners.
Brick Paver
Manifold Enclosure
Onix
Slab Manifolds
Rewire/Rebar
Step 3:
Determine Zone
Boundaries
Step 4:
Confirm Tubing
Requirements
Lay Onix across slab area,
keeping tubing spaced to
Measure the distance from the mani-
design conditions.
folds to the farthest point in the zone.
Make the minimum circuit length is at
least twice this distance. If not, the
Onix will not be long enough to reach
the farthest point and still have enough
length to return to the manifold.
Step 5:
Install the Onix
Typical slab snowmelt installation. Onix is installed using a double serpentine pattern.
Miscellaneous
Although a snowmelt installation is
very similar to a standard slab installa-
tion, there are a few additional areas
that need to be discussed. These being
steps and glycol.
Steps
Flui
Fl uidd F
Flo
low Return
rn Man
Manifold
fold
Mini Ball Valve
Flui
Fl uidd F
Flo
low Return
rn Man
Manifold
fold
Return
rn Man
Manifo
fold
ld Flow
Fluid Flo
Long manifolds are installed perpendicular to the floor joists. To ensure balanced
flow through each circuit, a reverse return method is recommended. A reverse
return manifold requires a third copper line to be installed. This extra line allows
each circuit to “see” the same total manifold length, thus creating a balanced
system.
Flow
Supply Manifold Capped End
Flow
Capped End
Flow
Flow
Return Manifold
Supply Manifold Capped End
Flow
Capped End
Flow
Return Manifold
id Flow Return
rn Man
Manifold
fold Caution:
Use of materials not supplied by Watts
Radiant to make a splice or manifold
connection may eventually result in
Onix requires special mechanical b. All Onix and brass fitting surfaces
clamps, designed for higher tempera- must be clean and dry before mak-
ture and burst pressure ratings. Watts ing the connection.
Radiant provides two clamp options:
c. Whenever possible, avoid making
1. TorqueTite clamps are heavy-duty connections or splices in inaccessi-
screw-type, wide-band, stainless ble locations.
steel clamps. An in.-lb. torque
wrench is required to install them. d. Repairing Onix that has been in
Each clamp should be tightened service requires special attention, SelfTite Repair Kits include two barb-by-barb
according to the proper torque particularly when glycol has been splices and four clamps.
40 85
30 Room’s Actual 80
Conditions
Required Heat Load Line
25 77
20 74
15 71
10 67
5 EXAMPLE ONLY 63
0 58
60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220
98 Mean Water Temperature [°F]
Typical Nomograph the project is at an altitude of 2000 ft. The top axis on the nomograph
and 3/8’’ Onix is being installed. reflects the total heat loss through the
edges and underneath the radiant floor.
Nomographs are generated by The left vertical axis displays the radi- As the radiant floor heat loss increas-
RadiantWorks as design aids for con- ant floor heat output intensity, as es, the mean water temperature in the
tractors and engineers for optimizing expressed in BTU/h/sq.ft. of radiant floor also increases. This heat loss is
radiant floor heating designs. Each floor surface. expressed as BTU/h/sq.ft. of radiant
nomograph is customized for a specif- floor. It is calculated for each project
ic room or zone within a project. The The right vertical axis displays the by RadiantWorks based upon the actu-
following is a brief explanation of how average floor surface temperature. The al design parameters which include
to interpret a nomograph. actual floor surface temperature will floor insulation, floor covering and
vary –1¡F relative to the measurement overall system design.
Note: The accompanying slab nomo- location; that being taken over a cir-
graph is customized and should not cuit or between two circuits. In general The bottom horizontal axis shows the
be generalized to frame floors, other a system will need to be designed so average, or mean, water temperature
floor coverings, other Onix sizes or the average floor surface temperature flowing through the radiant circuits.
differing indoor air temperatures. is 85¡F or below. Higher surface tem- This is not the entering water tempera-
peratures can be used if allowed by ture. For example, if the entering
On the upper left hand corner of the ASHRAE guidelines and the floor water temperature is 108¡F and the
nomograph you will see the system covering manufacturer. exiting temperature is 88¡F then the
design parameters. In this case, the mean temperature is 98¡F, the average
nomograph is for a slab with 1/4’’ tile of the two.
where the desired indoor temperature
is 70¡F, the outdoor temperature is 0¡,
Note that if the flow rates are to be Because of the lower heat carrying
manually calculated, the required sup- capability of glycol, a good rule of
ply temperature can make a significant thumb is to add an extra 10% to the
difference in the resulting calculations. flow rate.
All three of the following charts are
TM
Pure Water
100,000 10
90,000 9
80,000 8
70,000 7
60,000 6
50,000 5
40,000 4
30,000 3
Qs HEAT REQUIRED (BTU/h) FOR AREA SERVED BY ONE CIRCUIT
20,000 2
7 ft/sec
6 ft/sec
5 ft/sec
10,000 1
T
ng
8,000 0.8
7,000 3 ft/sec 0.7
1"
6,000 0.6
5,000 2 ft/sec 0.5
g
in
ub
4,000 0.4
1.5 ft/sec
g
T
in
4"
ub
g
in
8"
1 ft/sec
ub
5/
"T
2,000 0.2
ng
2
bi
1/
Tu
8"
3/
1,000 0.1
900 0.09
800 0.08
700 0.07
600 0.06
500 0.05
0.0001 0.001 0.01 0.03 0.1 1.0
PRESSURE DROP (Feet of Head Pressure Drop per Lineal Foot of Tubing)
Notes: 1. The heat required is the energy the boiler must deliver for the calculated heat output of a circuit. If only the net heat output of
the circuit is known, multiply by 1.1 to get Qs, assuming the back and edges are insulated or space below is heated.
2. If the ∆T is different from 20°F, the value of Qs must be multiplied by 20/∆T.
3. Numbers from 1–7 in graph show the average water velocity in the hose (ft./sec).
4. This chart is for pure water only. It cannot be used for other liquid mixes.
30,000 3
Qs HEAT REQUIRED (BTU/h) FOR AREA SERVED BY ONE CIRCUIT
20,000 2
7 ft/sec
6 ft/sec
5 ft/sec
T
10,000 1
9,000 4 ft/sec 0.9
5,000 0.5
bi
2 ft/sec
Tu
4,000 0.4
ng
1"
1.5 ft/sec
bi
3,000
ng
0.3
Tu
bi
4"
Tu
1 ft/sec
3/
ng
8"
2,000 0.2
bi
5/
Tu
ng
2"
1/
bi
Tu
1,000 0.1
8"
3/
900 0.09
800 0.08
700 0.07
600 0.06
500 0.05
0.0001 0.001 0.01 0.03 0.1 1.0
PRESSURE DROP (Feet of Head Pressure Drop per Lineal Foot of Hose)
Notes: 1. The heat required is the energy the boiler must deliver for the calculated heat output of a circuit. If only the net heat output of
the circuit is known, multiply by 1.1 to get Qs, assuming the back and edges are insulated or space below is heated.
2. If the ∆T is different from 20°F, the value of Qs must be multiplied by 20/∆T.
3. Numbers from 1-7 in graph show the average water velocity in the hose (ft./sec).
4. This chart is for 50% propylene glycol/50% water mixture only.
5. Remember to correct the flow rate for the different heat carrying capacity of propylene glycol, as opposed to plain water.
30,000 3
Qs HEAT REQUIRED (BTU/h) FOR AREA SERVED BY ONE CIRCUIT
20,000 2
7 ft/sec
6 ft/sec
5 ft/sec
T
10,000 1
9,000 0.9
4 ft/sec
4,000 0.4
ng
bi
Tu
bi
ng
1"
bi
4"
Tu
3/
ng
bi
5/
Tu
ng
2"
bi
1/
Tu
8"
1,000 0.1
3/
900 0.09
800 0.08
700 0.07
600 0.06
500 0.05
0.0001 0.001 0.01 0.03 0.1 1.0
PRESSURE DROP (Feet of Head Pressure Drop per Lineal Foot of Tubing)
Notes: 1. The heat required is the energy the boiler must deliver for the calculated heat output of a circuit. If only the net heat output of
the circuit is known, multiply by 1.1 to get Qs, assuming the back and edges are insulated or space below is heated.
2. If the ∆T is different from 20°F, the value of Qs must be multiplied by 20/∆T.
3. Numbers from 1-7 in graph show the average water velocity in the hose (ft./sec).
4. This chart is for 50% ethylene glycol/50% water mixture only.
5. Remember to correct the flow rate for the different heat carrying capacity of ethylene glycol, as opposed to plain water.
Onix
6"
6"
Baseboard Fan Coil
Backflow Preventer
Control
Sensor
Pressure and
Temperature Gauges
Ball Valve
Boiler Drain
Gravity Check Valve
Spring Check Valve
Zone Valve
50% Glycol-50% Water: Zone A calls for 20,000 BTU/h to Assuming 3/4" supply lines are
BTU = gpm × 455 × ∆T be delivered to a zone with 5’—200’ installed, with a flow rate of 2 gpm.
circuits of 3/8" Onix. The manifold is 0.02 × 40’ (supply and return dis-
For most heating systems using a 20¡F located 20’ from the mechanical room. tance) = 0.80 ft.-hd.
temperature drop it can be assumed
1 gpm = 10,000 BTU/h Step 1: Step 5:
Determine the zone flow rate. Determine complete pump spec.
So, a system requiring 100,000 BTU/h
will need 10 gpm of flow. The flow rate for the zone is The required pump load is 2 gpm at
20,000/10,000 = 2 gpm. (6.20 + 0.80) or 7.0 ft.-hd.
The other performance factor in sizing
a circulator is the head pressure. Head Step 2: The actual pump required for this zone
Pressure is the friction loss associated Determine the circuit flow rate. is selected using the given manufactur-
with the water moving against the er s guidelines. This is usually done
inside surface of the tubing or pipe. The flow rate through each circuit is with the use of a pump curve chart.
The circulator should be sized to over- 2 gpm/5 circuits = 0.40 gpm/circuit The chart is set up showing the pumps
come this loss, while moving the capacity at various pressure drops.
required volume of system fluid. Choose the pump that best reflects the
needs of the system.
For more detailed information, please achieve this goal, including 3-way mix Most manufacturers will provide this
read these other publications. This valves, 4-way mix valves, injection information in a graph similar to what
manual is designed to give a basic pumps, and even standard ball valves. is seen for pump sizing. Consult the
understanding of primary/secondary The most common means is to use corresponding mix valve manufacturer
piping and to offer several piping either a three way mix valve or an for more sizing information.
schematics as well as some correspon- injection pump.
ding electrical diagrams. Watts
Radiant is not responsible for the per- Mix Valves
formance or functionality of these
illustrative diagrams to any particular Non-electrical mix valves are designed
project. Please consult a professional to provided a fixed supply temperature Mix Valve
mechanical contractor or a Watts whenever there is a call for heat.
Radiant representative for detailed
advice. This reduced temperature is achieved
by allowing a controlled amount of
Mixing Options high temperature boiler water to mix
with the cooler return water from the Temperature Gauge
Controlling the supply fluid tempera- zone. It is important to choose a mix
ture to the zones is one of the more valve that has enough flow volume for
critical features of the mechanical sys- the zone design.
tem design. There are several ways to
Zone Pumps
Primary Pump/
Boiler Loop
Injection Pump
gpm = 2.5
White
PP P1
Black
Blue
Black
Black
Blue
BIM L N G W1 R
Blue
Blue
Yellow
Black Black
White White
Green Green
Blue
Fusetron
Blue
Yellow
Transformer
Watts Radiant: Onix Installation Manual page 75
Appendix
Piping Schematic
Multiple zones
off boiler
The schematic shown illustrates a
multi-zone system, where two
non-electric mixing valves are
being used.
White
PP P1 P2 P3
Black
Blue
Black
Black
Black
Black
Black
Black
Blue
Blue
Blue
BIM L N G W1 W2 W3 R R R
Blue
Blue
Blue
Blue
Yellow
Yellow
Black Black
White White Yellow
Green Green
Blue
Blue
Blue
Fusetron
Blue
Yellow
Transformer
White
Electrical Diagram
Green
PP P1 P2 P3 INJ
Black
Black
Black
Black
Thermostat
Hook-ups
L N G R W W W
White
Black Black White
White
White White
Green Green
Fusetron Red
Black
Black
Yellow/Green
Blue
1 2 34 56789
Supply/Return
Black
Transformer
Com
ing
S
um
mer
2005
Always use a foil-faced fiberglass (foil facing up), leaving a 2" air gap Install a high-temperature foil-faced foamboard insulation, such as
between the foil and the underside of the subfloor. It is very important to Thermax¤ or equivalent, between the nailers. It is very important to
select the correct nailer thickness, so that the Onix maintains continuous carefully select the correct nailer and foamboard thickness, so that the
contact with the underside of the upper floor or subfloor, but isn t crushed Onix maintains continuous contact with the underside of the upper
or deformed. floor or subfloor, but isn t crushed or deformed.
Alternatively, a concrete mix or gypsum-based mix can be used to fill this Alternatively, a concrete mix or gypsum-based mix can be used to fill this
void. void.
Do not use staples or NailTites in this application. Use duct tape or Do not use staples or NailTites in this application. Use duct tape or
contractor s adhesive if the Onix needs to be held in place. contractor s adhesive if the Onix needs to be held in place.
collective knowledge of thousands of our cus- Warm up a concrete slab to provide space heat.
tomers who have been kind enough to furnish us Install a minimum of 2" of
concrete above the top of the Onix for
with ideas and techniques that have worked for residential and 3" for commercial floor heat
applications.You may need a greater
them. We have selected the best of these ideas thickness over the Onix, depending on
structural loading.
and rigorously refined them. Use an extruded polystyrene (Dow¤ Blue Board¤ )
insulation board on the edge of, and optionally under
the slab, depending on site conditions.
combined experience with modern floor heating Where space permits, we recommend the use of extruded polystyrene Use a foil-faced insulation for this application, with the foil facing up, and
(Dow¤ Blue Board¤ ) insulation at the perimeter of the new slab. a 2" minimum air space between the foil surface and the steel deck.
and snowmelting. Please take the time to The use of poly-fiber material in the new concrete slab will add crack Sprayed-on insulation also works well in this application.
resistance.
carefully read this manual before installing your
In this application the Onix can be tied to rewire or poultry netting
depending on the structural needs of the project.
floor heating or snowmelting system.
A v a i l a b l e S i z e s :
Onix is available in the following nominal I.D.: 3/8", 1/2", 5/8", 3/4", and 1".
O n i x M a n i f o l d s :
Watts Radiant offers a wide range of
manifolds for Onix. Manifold accessories
include unions, isolation valves, temperature
gauges, vent-and-purge assemblies, and flow
meters. Additional specifications can be found
in the Watts Radiant Onix Submittal or the
Watts Radiant full-line Product Catalog.
Introducing
Modular Control Panels
Our new Hydronex™ Panels come in three main
configurations: P-Series, D-Series, and Z-Series.
The 35 standard models can be customized, with
control and circulator options available. P-Series and
D-Series Panels feature the Rail Mount enclosure
while Z-Series Panels feature a Box Mount enclosure.
• Cost-effective
• Fast delivery
• Quick installation
• 35 standard models; more
with custom options
• Linked together or stand-alone
• Contractor-friendly
• Three circulator brand options Protective pin-mounted
To learn more about Hydronex panels call 800-276-2419, or go cover included.
to www.wattsradiant.com and click on the Hydronex link.
Onix is tested to relevant portions of several ASTM standards, carries the BOCA 4500 E. Progress Place Springfield, MO 65803-8816
certification mark as approved by BOCA research report number 95-47.1, and carries
the UPC mark as approved by the International Association of Plumbing and Mechani- USA & Canada: 800-276-2419 Phone: 417-864-6108 Fax: 417-864-8161
cal Officials. Watts Radiant is a charter member of the Radiant Panel Association. See our Radiant Catalog online at: www.wattsradiant.com
Copyright © 2005 Watts Radiant, Inc. Onix Installation Manual LIT#ONIXMAN0505 Effective: 05/01/2005