Total load coming on the floor = 5KN/sqm (clause 3.2.1 to 3.2.3 :NBC)
Ly/Lx = 1.33
Postive at support : Ly/Lx = 0.056, 0.08 Design comonent = 2.6 KNM, 2.52KNm (10mm torsteel @300mm c/c, 10m bar @450c/c)
Critical Factors
1. 2. 3. 4. 5. Proper compaction Soaking bricks in water before concreting Curing Quality of sand for concrete Raising reinforcements bars before concreting for adequate cover
Tools Used
1. 2. 3. 4. Trowels Plumb bob Thread Pans
DOS
1. Bricks should be soaked in water 2. Curing should be done atleast for 14 days for ponding 3. Proper Compaction has to be achieved with the help of steel rods and hammer 4. Concrete should be used within 30 minutes of adding water to the mix 5. Reinforcements should be raised by inserting aggregated below them
1. 2.
Construction Process