Training Schedule for 3 STS Cranes for Contecar, Colombia

Rev No 01

Time
1 day:
st

Training Course
8:00~11:00 Section 1Safety 1.1 Safety 1.2 Emergency escape Section 2: Outline of the crane 2.1 Structure 2.2 Drive system 2.3 Safety device 2.4 Auxiliary system 2.5 Device for maintenance 2.6 Access, Elevator, Houses 2.7 Lifting System Section 3Maintenance instruction 3.1 Cleaning 3.3 Fastening 3.4 Alignment 3.5 Lubrication 1:00~17:00 Comprehend the crane observing and being trained on the crane. 8:00~11:00 Section 4: Wire rope 4.1 Basic knowledge of wire rope 4.2 Transportation of wire rope 4.3 Rope end connecting 4.4 Rope cutting 4.5 Inspection 4.6 Rope failure type 4.7 Rope lubricating 4.8 Rope changing Section 5Typical Maintenance tasks 5.1 Move the Gantry incase of shaft broken 5.2 Move the trolley in case of shaft broken 5.3 Open the gantry wheel brake manually 5.4 Open the drum Brake manually 5.5 Release the trolley/catenary trolley rope tensioner

Place
Classroom

Note

Crane

2nd day:

Classroom

2nd day:

1:00~17:00

Classroom

Section 5Typical Maintenance tasks 5.6 Operating the trolley when loosing tension of Hydraulic 5.7 Operating the crane after snag 5.8 Install or Adjust the Motor brake 5.9 Install or Adjust the wheel or drum brake 5.10 Reset the Zero position of T/L/S 5.11 Emergency operating-Boom hoist/Main 5.12 Hoist/Trolley trailing 5.13 Adjustment when trolley / Gantry skew 5.14 Gantry Jacking procedure Section 6: Maintenance of Structure 6.1 Material 6.2 Welding symbol 6.3 Welding rod 6.4 Inspection of structure 6.5 Inspection method 6.6 Interval of inspection 6.7 Repairing of structure Note: 1. The schedule may be adjusted according to the practical situation of training. 2. The training will be in English. A translator (English to Spanish or Chinese to Spanish) at the cost of buyer may be necessary if there are some trainees who are not good at communicating in English.

You might also like