Specification
What is waste heat recovery system explain steam turbine PTO & PTI
Specific fuel oil and how to calculate without flowneter and its unit
Clover leaf
Hoop stress
Promixity switch
MEP
How to remove bearing and hot to fit it
Bumping clearence
Tappet clearence
Nomograph
Centrifugal pump
4.Compressor which cycle based on, explain the cycle full process and advantage
5.Trips in GE and how to check what are the precautions to do before starting and to avoid trips
8.How will you change the belt in compressor inspections before and after change how will you find out
correct belt
10.Flooding actions
11.Inspection in running centrifugal pump and overhauled pump checks on shaft what all chances to be
made why to make
13.How to start Emergency fire pump checks before and after staring
17.Purifier overhauling
4b & 6
1. Mixing chamber
2. Checks in crankcase
Fn(4b)
-Power rating of engine at a particular rpm(lots of cross ques)
Fn(6)
-ovality of con rod
-tappet clearence
1)Type of engine
3) what is dynamometer?
MEP
1)use of purifier disc stack?
9) Purifier Alarms/Trip
1. Crankcase explosion
2. Scavenge fire
3. Boiler mountings
4. Compressor safety
Motor
1 ae tappet clearance why push rod free he wanted to hear cam
4 refer plant meat room tempr can you reduce or increase it how this I didn’t answered
5 ref plant air comp suction side ice i answered but not satisfied
5 mins he shouted that you dont know anything about ref system
6 asked about leak test he asked more methods i told all in ap singh