You are on page 1of 21

Ballast water management system with its criteria.

2. Oil tanker deck fire fighting system. And quantity of foam calculation

3. Annex 4 regulations and discharge criteria.

4. Annex 6 certificates and explain chapter 22

5. Jumping clearance in the stearing Gear system and how we can check this inside stearing Gear room
and what will happen if there is no jumping clearance?

nternal: Choudhury sir

External: Mathews sir

Fun.applied: 3, 4b, 5, 6

1.How ur ship complied with annex1

2.Validity of IOPP

3.What is interval bw annual and i termediate survey ( he wants exact word as in SOLAS.)

4.What is GZ, show it in diagram

5.Type of fixed extinguisher onboard gas carrier, and he asked lot n lot of questions in DCP fixed system

6.What is EPIRB at wat freq. it send signal..and wat it send

7.What is lat entry in ORB before reaching port.. retention quantity he didnt accept.. thn i said entry of
last transfer in engine room.. for that he firmly said "that is wrong answer".

8.How frequently u drydock ur ship.

9.Docs under annex.1

Fun:4b

1.Type of ME and it specs

2.How to calculate power of an engine and hw u will adjust fr balancing (asusual lots of questions in
it..planimeter working, formula to find power.. spring constant wr it mentioned.. unit of spring
constant.. etc..etc..)
3.One unit high temp. Wat s ur action

4.In Ref compressor both suction and discharge pressure are same.. and rooms are getting heated up..
reason and ur action)

5.What cyl.oil used in ur ship

6.What type of fueloil burned in ur engine.

7.Draw power card and mark TDC and BDC on it

Fun:6

1.What all clearances measured in drydock

2.How to measure ruddle pintle bearing clearance

3.How to measure propeller drop. How to access the area to measure drop

4.How to arrest a leak in pump casing

5.Checks on conrod

6.How to do dye penetrant test

7.How to check conrod bending

8.From poker gauge reading wat u will do

Result: Fun:4b & 6 pass.

Fun 6 :

Main bearing survey before opening wat all checks

How do calibrate oxygen Meter

Wire sling certificate is missing how will u check wire sling

Magnetic particle indication how u will check

Centrifugal pump shaft wat All checks


Fun 3

Ism certificate

Co2 10 years maintenance

Co2 cylinder testing

Water ingress alarm location and testing

Ippo certificate

Fun 4

Eng spec

Ae connecting rod inspecting

Result,

Washout

He is not accepting any answers ....wat we tell😔

20.11.2018

Mathews and harish

Fun 3

1.container ship structure stress are maintained i said about torsional box

2.annex 6 certificate explain

3.what is gz what u know abt gz

4. Validity of certificates all interval has to be explain

Fun 4

1.oil mist alarm wt ur action. With all the points he wants if engine slow down i wil stop fresh water
temperature lot of discussion for this question

2.boiler survey preparation


3.engine power calculation explaining

Fun 6

1.Cylinder liner condition report

2.magnetic particle test

3.rudder drop

Result ---- cleared 3 and 6

External : Mathews

Internal : shrish

Attempt 3

Functions applied : 3 & 6

Function 3

1. Types of ships sailed

2.What are all fixed fire fighting system in your ship

2. Co2 maintenance and certificate

3. Which regulation says cargo hold system doesn’t require fixed firefighting system

4. How to check water ingress system and how water ingress system is working

5. Exact location of water ingress system and why it is fitted their

6. What are check you will do in scba. Which regulation has says keep scba

Function 6

1. Propeller drop where u will insert the poker gauge

2. you are going to lift the cylinder liner before that What are all the checks u will made in E/R Cranes

3. How the limit switch is working


4. How will u check electro magnetic brake in crane

F4

Chain tightening procedure

Sfoc calculation

BHP calculation

PID controller

Purifier optimisation

Crosshead brg removal

Guide shoe forces

19 Nov

Ext Mathew + New surveyor

Int Shreesh

F4

Engine particulars

Type of fuel used onboard

Fuel standards

What is mean by ISO 8217

Sfoc for ur engine& calculation

What is underslung engine & construction

Where the crank shaft load is acting

How to remove main bearing

OMD alarm & lot of cross questions

Boiler safety valve, what info you will give to surveyor before setting safety valve
Boiler alarms and trips, if low level alarm not working in front of surveyor, what will be ur action

Expansion valve, how to order, what details you will provide to supplier

Relation between speed power and fuel consumption

F6

Checks on centrifugal pump

Where the shaft can get bend, checks on impellers

Function of bottom bush bearing

How to check trueness of shaft

There is the hole in FWG ejector line, how will you identify?

Checks on connecting rod

How to check trueness , ovality, gudgeon pin clearence, where to check, how to check, what is mean by
ovelness

F4 pass

Loganathan, [15.12.18 12:44]

[Forwarded from Sivakumar]

Internal: shirish

External: mathews & new surveyor

Function 4b

Main engine specification

Critical rpm why give in range why not particular rpm

One unit exhaust temperature high in ME actions

Boiler trip tryout in front of surveyor

Ac plant two room having different temperatures how to make same temperature
Main engine thrust bearing measurement

Ae thrust bearing location

Ae surge after 50% load- turbocharger was recently overhauled, what other checks u will carry out.

External : Matthews and other guy

1. How will you check the performance of main engine ?

- Draw power card and indicator card, explain

- how planimeter works

- If all unit indicator cards gives different values how you will check performance if sea trail data not
available.

2. Exhaust gas boiler fire

- Indications

- All temperature from exhaust manifold upto egb outlet

- Draw tube design of egb

- How you will fight fire, from where you will do inspection.

- some other cross questions.

3. Steering gear safeties( only mechanical)

- For all answer he asks where fitted , what value, how fitted ,

4. Accumulation pressure test

- Detailed procedure each step

- Both valves done at same time ?

5. What is general rule for minimum and maximum butt clearance for all engines ?

6. Refrigeration all gas leaked. How you will instruct shore technician ?

7. How you will order TEV.

That's all I remember.


nternal: shirish

External: mathews & new surveyor

Function 4b

Main engine specification

Critical rpm why give in range why not particular rpm

One unit exhaust temperature high in ME actions

Boiler trip tryout in front of surveyor

Ac plant two room having different temperatures how to make same temperature

Main engine thrust bearing measurement

Ae thrust bearing location

Ae surge after 50% load- turbocharger was recently overhauled, what other checks u will carry out.

19 Nov

Ext Mathew + New surveyor

Int Shreesh

F4

Engine particulars

Type of fuel used onboard

Fuel standards

What is mean by ISO 8217

Sfoc for ur engine& calculation

What is underslung engine & construction

Where the crank shaft load is acting

How to remove main bearing

OMD alarm & lot of cross questions


Boiler safety valve, what info you will give to surveyor before setting safety valve

Boiler alarms and trips, if low level alarm not working in front of surveyor, what will be ur action

Expansion valve, how to order, what details you will provide to supplier

Relation between speed power and fuel consumption

F6

Checks on centrifugal pump

Where the shaft can get bend, checks on impellers

Function of bottom bush bearing

How to check trueness of shaft

There is the hole in FWG ejector line, how will you identify?

Checks on connecting rod

How to check trueness , ovality, gudgeon pin clearence, where to check, how to check, what is mean by
ovelness

F4 pass

F4

Chain tightening procedure

Sfoc calculation

BHP calculation

PID controller

Purifier optimisation

Crosshead brg removal

Guide shoe forces


Applied function 4b & 6

Internal mr. Choudhry

External mr.mathews

1. How VIT is actuated in MAN B&W engines , how horizontal movement of rack is converted to vertical
movement in barrel

2. Oil mist detector alarm , steps to be followed in sequence (answer as per procedure in manual )

3. Auxiliary engine con rod complete inspection , wat to check , wer to check & how to check ( mention
about serrations , fretting , bolt checks , dye penetrant testing , spray name , oil holes in con rod to
check )

4. Auxiliary engine exhaust valve seat renewal procedure ( I told about welding old valve to seat &
hammering the seat out)

5. Main engine air cooler efficiency how to check ( air side fouling indicated by drop in air pr across the
cooler & water side fouling indicated by Drop in temp difference across the cooler)

6. Air cooler air side cooling ( ACC chemical , mixing ratio with water & how water circulated & drained )

7. Only meat room temperature not able to be maintained wat are reasons & wat u will do (main reason
is faulty TEV , if it's blocked no ref flow & so temp not maintained , I told tev setting not to be adjusted
but as a temporary measure will pour hot water on TEV )

Result both cleared

4.08.18

External mathew

Function : 3

1. Type of ship sailed? TEU ?

2.Gz ?

3.Annex 6 documents.

4.Water ingress alarm testing in cargo hold.

5. Grt ,dwt
Function: 4B.

1. Engine details.

2.sfoc

3. ME no 3 unit high temp.

4. Refregerant HP cut out.

Function 5.

1.Alternator details.

2.reverse power trip

3.msb safties .

4. What all voltages in ship.

5.emergency generator solas requriment.

6.you started a generator but not got voltage? Reasons?

Function 6

1. Pump overhaul .How will you check shaft starightness.

2.crankshaft inspection from all safties.

3. How will you align a pump.

1.In Cylinder calibration report column wat u will fill and send to company regarding with values

2.main bearing survey

3.imbolaisation certificate for wat wat al contents in tat

4.main bearing cap weight according wt range chain bock u will use,see we're pulley to fix, Draw pulley

5.stern tube seal leaking what u will do .how to reduce it.


External: Mr. Mathews

Internal: Mr. Chowdhary

Function 3 and 5

1: all ships sailed after class4, then he asked for bulk carrier cargo hold diagram, y the shape of
cargohold like this, after looking at dia.

2. Stable ship, unstable ship... Show how we get GZ and then too many cross questions in stability.

3. Annex 1 all certificates, what all surveys?? Interval of these surveys??? Orb enteries??? Bilge
Discharge criteria??

4. For vlcc what is the firefighting system for deck, I told low expansion foam then what's the ratio and
cross questions on calculations of area and factors of multiplication, what was foam capacity of tank on
your ship- I told straight I don't remember

5. Types of fire detectors available on ship and their tests.

Decider by chowdhary: stern tube lube oil leaking into sea... Tell some temporary steps you will take to
avoid oil leakage

Result: pass in both ... And I am still not sure will see result updated first ....but thats all I am still not able
to believe i passed in both

Do share your questions guys it helps

Fun:6

1.cyinder liner calibration with values and

Loganathan, [15.12.18 12:44]

[Forwarded from Pannerselvam Samyyappan]

External: Mathew
Fun :3

1.Iopp certificate full details with validity, renewal and intermediate survey certificate validity

2.cargo Oil discharge certeria

3.How to calculate GM,Gz Displacement.

4.Ballst water management as per new method and with types

Loganathan, [15.12.18 12:44]

[Forwarded from Pannerselvam Samyyappan]

5.Fixed foam Discharge area in Engine room, Fixed foam system regulations and with calculations.

Function 4&6

1. Write down name of generators on your previous ship- on man B&w- how to cut out fuel pump for
2stroke ...

2 difference between Sulzberger cylinder head and man b&w

3. types of fuel pump in each, Then under what circumstances you will cut out the fuel pump.. Then how
to cut out one unit of main engine and why their will be need to cut out any unit?

4. Main engine reversing procedure, wat all will happen, interlocks and safeties during reversing.

5. In Ums ship what all Me trips and slow down alarms present.

6. Scavenge fire, What will be ur action,how will u find out which unit, What all inspection after scavenge
fire.... ??

7. After scavenge fire u did unit inspection ... What all reports u will make.

8. You have to train ur 5E about boiler gauge glass blow through. Tell how you will proceed? Then after
blowing all is ok but when u open water cock water cock water is not coming? Why ... What all will u
check?

9. Prepare main bearing for survey??? What all checks and precautions observed during removal.

10. Co2 room checks and inspection..


11. Refer compressor undercharged... What will be the symptoms.... How to charge refrigerant?

12. Fire in engine room ... N u r a chief engineer... How will u proceed ... ???

How will u prepare rentry after co2 release

13. Oil mist detector daily rotein checks,alarm setting.

Few more cross questions..

External: Mathew

Fun :3

1.Iopp certificate full details with validity, renewal and intermediate survey certificate validity

2.cargo Oil discharge certeria

3.How to calculate GM,Gz Displacement.

4.Ballst water management as per new method and with types

Loganathan, [15.12.18 12:44]

[Forwarded from Pannerselvam Samyyappan]

5.Fixed foam Discharge area in Engine room, Fixed foam system regulations and with calculations.

07 march 2018

External- Mathews

Internal- choudhary

Fun 3

Annex 6 cert

All certificate comes under annex 6


BWM full details

CO2 reg and testing cert

High exp foam sys regulation

Capacity requirements,foam analysis wat all they test and their result.

BDN data ? What all included in bdn

EPIRB

Diff between epirb n sart

SART

Working frequency

1.Check fr any alarm ( fr slow down).

2. The bridge cant increase the rpm beyond Engine room set rpm. (chk that)

3. Chck rpm pick up sensor. (rare case this happens)

4. May the telegraph belt broken

Internal:choudhary

External:mathew

Fun:3

1. Ism elements and how will implent new company.

2. Annex 6 certification and documentation.


3. Co2 fixed fire fightening maintanence. as per certification requirement.

4. DPA.

5. GZ curve draw and explain.

6. EPIRB

Internal: Mr.Barik

External:Mr.Mathew

Fun 3

1.water ingress system,how many alarms what's the regulation and alarm system fwd of collision
bulkhead i.e.in fore peak tank

2. Ur in 18yrs old vessel and psc onboard what certificates you will show to psc regarding Co2 fixed fire
fighting system,routines carried out in 2yrs 5yrs and 10yrs

3.Angle of Loll.,how stable becomes unstable

4.Annex 1 documents,what is annual survey ,intermediate survey what's the regulation for both

5.What is EPIRB...How to activate and which fz it operates and what signal it will send and to where

Fun 4b

1.Ships specification..What is super long stroke and advantages over long stroke and how power to
weight ratio is increased

2.What is VIT...How its done in Man And Sulzer

3.Meat room temp is dropping and reasons for it and what's the remedy as 2/e
4.Popping Up test of boiler safety valve..Procedure and what and all bypassed and blanked for doing this
test...What certificate u will show to surveyor before doing this test..

Internal: Mr.Barik

External:Mr.Mathew

Fun 3

1.water ingress system,how many alarms what's the regulation and alarm system fwd of collision
bulkhead i.e.in fore peak tank

2. Ur in 18yrs old vessel and psc onboard what certificates you will show to psc regarding Co2 fixed fire
fighting system,routines carried out in 2yrs 5yrs and 10yrs

3.Angle of Loll.,how stable becomes unstable

4.Annex 1 documents,what is annual survey ,intermediate survey what's the regulation for both

5.What is EPIRB...How to activate and which fz it operates and what signal it will send and to where

Fun 4b

1.Ships specification..What is super long stroke and advantages over long stroke and how power to
weight ratio is increased

2.What is VIT...How its done in Man And Sulzer

3.Meat room temp is dropping and reasons for it and what's the remedy as 2/e
4.Popping Up test of boiler safety valve..Procedure and what and all bypassed and blanked for doing this
test...What certificate u will show to surveyor before doing this test..

Loganathan, [15.12.18 12:44]

[Forwarded from 11]

Fun 3

Load line diagram.

Statutory certificates

Fixed fire fighting system other than co2 explain

Emergency fire pump suction location

Flare and camber purposes

In drydock which part they make first for ship building. Draw it.

Annex 5 what r garbage. Latest amendments.

Angle of vanishing explain

Fun 5

Diode, zener diode, transistor, thyristor explain purposes and where it used.

Brush less alternator working principle .

What is brush alternator.

How to you identify electronic components in circuit diagram

I think he expects those symbol to draw and explain.

Result fun 3 passed

Loganathan, [15.12.18 12:44]

[Forwarded from Rafi]

Function 4b and 6

Indicated dia and scales used.


Boiler not cut in and no alarms and explain actions alone.

One unit exhaust gas temp high and actions alone.

S.P cut out in reff compressor and actions alone.

Next function :

A/E con rod checks.

Foam exting filling.

Preparing ur fitter for enclosed space entry.

Pump casing repair.

👉Plz note 👈

🤔 he expected to say what he was expecting... And do not expect what he will expect which is
unexpected.

All the best with Mathew sir.

Funtion 4b

1. Engine specification for last ship? Calculate Mcr for ur ship?

2. Power calculation using planimeter? Planimeter working ? What are units you obtain from
planimeter?

3. SFOC calculation?

Derive how g/kwhr obtained?

He asked toCalculate my ships fuel oil quantity for an hour in grams ?

Funtion 6

1. After using DCP extinguisher how will you proceed for filling the bottle again? Step by step
procedure ?
2.ways to detect crack on ships? Explain DP test procedure ?

3. Proceed for crank case inspection?

Expected answer from Mr mathews is risk assessment inside n outside engine room then proceed with
the rest.

4. Centrifugal pump opened up, what checks on shaft, coupling?

5. Lathe machine working with parts ?

Fun:4b

1.Engine specification details (mcr,sfoc,pmax,pcomp,cloc) .

2. why air starting valve can't open when 30 bar air pressure acting on valve lid.

3.what are the reading u will take on piston crown and purpose.

4. what all reason referigeration compressor hp cut out.

5.Reason for one unit engine exhaust gas temp high.

6.use of planimeter.

Internal: sirish sir

External: Mathew sir

1. Engine specs.

2. VIT function and how fuel timing is advanced .

3. Ur 4e reporting unit no 3 starting air valve getting hot.action.

4. Boiler survey and trips

5. Suction and discharge press same in ref compr. Wat is ur action.

6 . One unit exh temp high . Ur action .


Result: pass

Cleared class ii . Thanks to all . Pls keep posting questions .

nternal: sirish sir

External: Mathew sir

1. Engine specs.MCR,sfoc,peak pressure,comp pressure,etc

2.how to find out the performance of the engine without taking power card draw card :: with the peak
pressure values ::: if so

3.how to increae peak pressure ??

4.can we do individual adjustment in vit ?? VIT function and how fuel timing is advanced .

4 Ur 4e reporting unit no one starting air valve getting hot.action.(cut off the unit ) if we cut out it what
all the effects ??

5. Boiler trips :how will you demonstrate low water level trip in front of surveyor??

6.ship going to chill area : half people reporting chill comfort and half reporting chill discomfort ::: what
u will do :: unloader : how unloader works ??

You might also like