BASAR SIR

injection degree?

on board LO test

peak pressure low reason,indication?

liner calibration?maximum allowable rate?

liner corrosion reason and consequence?

iopp certificate contents


iopp tank? what are the requirements of iopp tank.

what is HSS?

Cat fine?

vanadium high problem?

auxiliary engine performance taking?

purifier maitanence?

solas certificate?

what r the things u cannot incinerate?

what is PCB?

bilge discharge regulations?

connecting rod seration?

what are the checks to be done after overhauling of axillary engine piston?
boiler tube leaking indication?

how to carry out boiler low low water level?

FWG vacuum reduce why?

ejector pump working principle?

4E duty

Why no crankcase relief valve in air Compressor?

What is D curve of generator?

Piston crown crack why? 10 reason?

Piston material, why cast iron for piston skirt?

Centrifugal pump performance checking procedure.

Gen major O/H

After 6-7 days of changeover from HFSO to LFSO all unit blast why?

Bumping clearance, bearing clearance, ovality of liner, ovality of con rod.

M/E power calculation

Mixing column return line when to close, when to open, why?

O/H of centrifugal pump

Bunker procedure.

FO onboard testing procedure water test, compatibility test, viscosity test & more 3 test.

ISM Checklist of air comp.

SOPEP regulation , description .

ISM,SMC,DOC,IOPP

Incinerator safety, trip, regulation, temp setting procedure, alarm testing procedure.
Bearing clearance how much, Piston liner wear rate & how much?

What is critical temp? Critical pressure?

Why detector cabinet in the bridge?

Survey procedure

Reason of centrifugal p/p inefficacy

What is the energy requirement for navigation battery & how much time?

How cat fine remove from fuel?

Tell 5 casualty during changeover

Ejector pump working principle

Tell 5 ways off treat your fuel

What is vacuum breaker?

Why two suction valve from fuel service tank?

Why no filter at circulating pump suction?

Incinerator fire failure alarm reason

What cannot burn in incinerator.

Alarm, trips& safeties of incinerator.

Operating procedure.

What to check during running.

Does it have photo cell?

If pilot burner failes how main burner senses?

Water level control of boiler & boiler alarms

Blow down? How many types of blowdown?


Scum ,bottom & partial blowdown how to do explain

What to check of a boiler in a round

Safety device.

Uptake fire

soot blow process.

FO inlet pressure how much?

Main engine no 3 cylinder exhaust temperature low, reason and remedy.

Stuffing box purpose.

Scavenge fire reason and effect on exhaust.

Crankcase relief v/v purpose.

Batch purification.

Bunker documentation.

M/E slowdown ,shutdown alarm.

Testing procedure of crankcase relief v/v.

Type of oil mist detector

Watch handover & take over procedure.

Manual start of boiler.

HFO to LSFO c/o

Air comp relief v/v testing procedure.

Main burner pilot burner

Clearance of screw p/p

Faraday's law.
Sensing probe principle and how it is work ,material of probe.

SOLAS area

On board l.O .testing procedure.

Incinerator regulation.

Alpha lubrication &


Why?

Static & dynamic stability

How u measure the ovality of liner

Cat fine & offland procedure.

Bunker checklist

Boiler scale formation

Leaking of starting air

IOPP,IAPP,SMC,PMS,COC

DOC, what is special area, bunker tank preparation.

Synchroscope?

A/E over speed trip test

Battery room safety

Emc'y gen. Safety

ISM SMC IOPPC IOPP tank ,IAPPC

Watch take over and hand over

What will you check in Control Room during takeover time

Liner calibration full procedure & Overhaul


Piston ring clearance

Piston clearance

Which piston has more wear, reason

Function of booster pump and mixing column

OWS working principle

Drawing
Oil cooled piston
Co2 flooding for hold
Liner
Power distribution
Fuel oil line
Incinerator line diagram
Boiler water level controller
Earth fault

OBAIDULLAH IBNE BASHIR SIR


Tell about Risk assessment form, what is in the risk assessment form

After taking over watch what should you wirte in the log book

What you will check in main control panel.

Screw p/p o/h procedure.

Co2 flooding in E/R procedure, function of pilot v/v, during floodin why ventilation fan &
blower trip?

Scavenge fire alarm how you will understand that alarm is correct.

Exhaust temp high what is your action


Motor overload what is your action & how you understand that motor overload.

Taking over procedure, ORB writing Procedure

A/E L.O temp how much & L.O press drop a little what you check.
Function of purifier

how to understand desludge is done. how to do desludge

how to operate valve

operating of high press water

change over press drop

shifting of interface

gravity disc dia large small changeover

bad fuel and big dia of gravity disc what is the solution

change to clarifier

interface breakdown and flow of water and oil?

generator crankcase opening procedure ,inspection, deflection, problem associated with


deflection

Due to deflection problem associated with gear driven pump

Jacket temp and pressure problem due to deflection

crankshafts problem due to deflection

bottom end bolt problem due to deflection

bottom end bolt tension importance, tension is not accurate ,what will be problem?

tappet how to take?

Inaccurate tappet and valve operation.

Inaccurate tappet and T/C operation.

Bunker procedure full, checklist, ism checklist for bunker fill up

90-95 %, why not 80-85%,


watch takeover and handover

(OWS regulation for in special and outside special area ,machinery space bilge, slop tank
Regulation ,operation, alarm and alarm test)

how to write oil record book

boiler low low water level how to sure ,what are the cause what is your action at sea

function of vent when to open

gauge glass blowdown process

if water is not come out in water cock why not put feed water

thermal stress, how and why happens?

boiler alarms, two safety valve in same chest why ,how to test safety valve when in operation,
not in operation

feature of cascade tank oil how to find out from which tank?

How to maintain oil record book?

which pump used in bilge?

How understand pump suction line is air present ,find out, action

what is problem if discharge press low but pump running, how air can ingress through pump

how to understand a pipe is leaking in somewhere in line?

CE said check the pump how u understand the pump is overloaded

risk assessment, risk assessment form draw

ISM manual for engine room crew .


Start from Duty take over, hand over procedure

Documents, Boiler Soot blow, procedure, action. Economizer washing, Wash water
management

Checking items in ECR


Earth fault testing procedure

M/E Safety Items

Slow down alarms

Details (scavenge fire, Starting line explosion, Crankcase Explosion), action in case of O.M.D.
Alarm

Piston Running hot indications

Scavenge limiter

G/E Overhauling Risk assessment

Emergency Generator starting test

Sewage treatment plant explanation

O.W.S details including Discharge

Faulty T/C- Air Cooler Fouling, U tube manometer

auxiliary engine major overhauling risk assessment (special concern to given about the risk
factor i,e. how the multiplication done, write down the risk assessment )

Watch handover takeover

Checklist bunker (every single details)

Economizer soot fire details (everything about it)

Purifier overhauling ( what should be checked prior to overhaul)

Port arrival -departure checklist

Crankcase explosion(details), oil mist detector alarm(as a third engr what to do),if bridge
doesn’t allow to stop the engine what will be my action

Auxiliary engine tappet clearance

OWS starting procedure ( including what needs to be written in ORB, after bunker what is
written in orb-logbook)
After taking over watch what papers needs to be maintain -its related to the log book ,weekly
what is written in the ORB,OWS regulation

Safety check list(details i,e. Specially during bunker what needs to be maintain according to
safety checklist)

Regarding manometer-if there is no liquid inside the manometer what to do as a duty engineer.

Draw
Sewage treatment plant
Bulkhead Cross-section
Star Delta connection.
Boiler Gauge glass
Star Delta Connection
Emergency Switchboard

Arafat sir :-

Drawing:
CO2 flooding
fresh water generator
fuel oil analysis test contents
Incinerator line diagram

written:
- Economizer water washing procedure

FWG
Explain drawing
How vacuum is created. Vacuum pressure
What is demister. What does it do.
Why vacuum is not raising in FWG
Then vacuum breaker
Salinometer purpose
Action due to less efficiency
Drinking treatment Safety
Sterilizing chlorine content how much , FWG regulation

Co2:
Explain the drawing
Line test and why
Bottle pressure safety vv blow pressure , line pressure
Regulation
Pressure switch function
Time delay why?
Bottle number.

Fuel analysis related:


Viscosity &unit
allowable limit for main engine.
some maximum limit like, ash, sediment, al+ si, sulpher

Preferantial trip why and sequence

Loads connected to emergency switch board

* watch take over procedure.

* fuel oil specifications.

* compatibility test procedure & how to understand that is incompatible?

* early & late ignition causes & their effects.

* injector overhauling procedure. After overhaul what will you check?

* piston pressure test & what is to be check?

* m/e shutdown, slowdown, interlock.

* catfine & how to remove?

* m/e sump level decreases, reason?

* during watch what will check in purifier?

* f.w.g why vacuum not build up? How to check the brine level?

* in ref. Compressor, what will you check?

* meat room temp. Not increasing, why?

* what is the purpose of air drain line in stern tube?


* seemp, eeoi,ism description.

* solas certificate.

* sopep item.

* before bunkering what documents need to collect from supplier?

* sampling methods.

* what is the procedure to send the collecting sample to lab?

* where to keep the bdn in engine room?

* sox record book, % of sulphur.

CO2 room visiting a procedure

time delay unit

Safety of Safety v/v

Burner maintenance

Difference btwn safety v/v and releave v/v And their use in E/R.

OMD Alarm during ur watch

Cause and action:


*Scavenge fire causes and Action.
*Exhaust temperature High one and all, why?
*Safety of Main Switch board
*Different safety of ME.
*Reverse power trip how work
* Water Hardness
* what is PH, How in boiler water, why its negative?
*What are the items we can not burn in incinerator?
*incinerator alarms and trip
*OWS regulations
* E/R bilge discharge regulation