Requirements: 1 2 3 4 5 6 Building a project and inputting parameters/ geographic data/antenna data and so on. engineer
Correct SPM model based on the data provided. Perform the prediction of coverage by transmitter/coverage by signal lever and generate relative reports. Draw the computation zone including 12 sites. Adopt 4*3 frequency reuse patterns at BCCH to plan these sites manually. Make interference analysis and reasonable adjustment to satisfy the requirement of C/I>12dB and generate relative audit report.