You are on page 1of 1

GSM RNP ISSUE4.

1Coverage calculation and Frequency planning


Basic task
Description: 1. Provide engineer parameter/map/other data in following directory: E:\Training Centre\Liufang\U-net basic task 2. 3. Available frequency band is 3MHz, beginning with 909.2MHz on uplink The resolution of map is 20m

Requirements: 1 2 3 4 5 6 Building a project and inputting parameters/ geographic data/antenna data and so on. engineer

Correct SPM model based on the data provided. Perform the prediction of coverage by transmitter/coverage by signal lever and generate relative reports. Draw the computation zone including 12 sites. Adopt 4*3 frequency reuse patterns at BCCH to plan these sites manually. Make interference analysis and reasonable adjustment to satisfy the requirement of C/I>12dB and generate relative audit report.

You might also like