3.4
SYSTEM PANEL POWERING UP PROCEDURE BATTERY CHARGER (CKC-BC-7851) SYSTEM 78 SOLAR POWER AND BATTERY Turn On supply to rectifier Measure output voltage EJJV Sign CTOC Sign
SOLAR CHARGE CONTROLLER (CKC-CC-7851) SYSTEM 78 SOLAR POWER AND BATTERY Measure solar input supply no. 1 Turn on circuit breaker no. 1 Check indicating light on controller Measure solar input supply no. 2 Turn on circuit breaker no. 2 Check indicating light on controller Measure solar input supply no. 3 Turn on circuit breaker no. 3 Check indicating light on controller EJJV Sign CTOC Sign
CTOC
(307013-W)
PROVISION OF DE-PRESERVATION, RETESTING / RE-COMMISSIONING AND START-UP OF CKC REMOTE GAS PLATFORM SYSTEM NO. 78-00 : SOLAR POWER AND BATTERY SYSTEM 78 SOLAR POWER AND BATTERY
: : : :
EJ/CTOC/6.7.13
0
09/10/12 2 OF 8
EJJV Sign
CTOC Sign
Measure solar input supply no. 4 Measure solar input supply no. 5 Turn on circuit breaker no. 4 Check indicating light on controller Turn on rectifier supply to controller Check indicating light on controller Ensure relay r1 is energized Measure load output Connect in battery input to controller Check battery voltage signal to controller Check battery temp signal to controller Turn off rectifier supply to controller Ensure relay r1 is still energized Measure load output
CTOC
(307013-W)
PROVISION OF DE-PRESERVATION, RETESTING / RE-COMMISSIONING AND START-UP OF CKC REMOTE GAS PLATFORM SYSTEM NO. 78-00 : SOLAR POWER AND BATTERY
: : : :
EJ/CTOC/6.7.13
0
09/10/12 3 OF 8
COVERTER (CKC-DC-7851) SYSTEM 78 SOLAR POWER AND BATTERY Measure input supply to converter Measure output supply from converter EJJV Sign CTOC Sign
POWER DISTRIBUTION BOARD (CKC-DB-7851) SYSTEM 78 SOLAR POWER AND BATTERY Measure incoming supply to DB Check voltage reading on voltmeter Turn on CB 2 Measure outgoing voltage Turn on CB 3 Measure outgoing voltage Turn on CB 4 Put selector switch on manual Simulate on condition Ensure relay R1 and contactor C1 is energized EJJV Sign CTOC Sign
CTOC
(307013-W)
PROVISION OF DE-PRESERVATION, RETESTING / RE-COMMISSIONING AND START-UP OF CKC REMOTE GAS PLATFORM SYSTEM NO. 78-00 : SOLAR POWER AND BATTERY SYSTEM 78 SOLAR POWER AND BATTERY
: : : :
EJ/CTOC/6.7.13
0
09/10/12 4 OF 8
EJJV Sign
CTOC Sign
Put selector switch to auto Simulate on condition Ensure relay R1 and contactor C1 is energized Turn on CB 5 Measure outgoing voltage Turn on CB 6 Measure outgoing voltage Turn on CB 7 Measure outgoing voltage
CTOC
(307013-W)
PROVISION OF DE-PRESERVATION, RETESTING / RE-COMMISSIONING AND START-UP OF CKC REMOTE GAS PLATFORM SYSTEM NO. 78-00 : SOLAR POWER AND BATTERY
: : : :
EJ/CTOC/6.7.13
0
09/10/12 5 OF 8
3.4
SYSTEM PANEL POWERING UP PROCEDURE BATTERY CHARGER (CKC-BC-7852) SYSTEM 78 SOLAR POWER AND BATTERY Turn On supply to rectifier Measure output voltage EJJV Sign CTOC Sign
SOLAR CHARGE CONTROLLER (CKC-CC-7852) SYSTEM 78 SOLAR POWER AND BATTERY Measure solar input supply no. 1 Turn on circuit breaker no. 1 Check indicating light on controller Measure solar input supply no. 2 Turn on circuit breaker no. 2 Check indicating light on controller Measure solar input supply no. 3 Turn on circuit breaker no. 3 Check indicating light on controller EJJV Sign CTOC Sign
CTOC
(307013-W)
PROVISION OF DE-PRESERVATION, RETESTING / RE-COMMISSIONING AND START-UP OF CKC REMOTE GAS PLATFORM SYSTEM NO. 78-00 : SOLAR POWER AND BATTERY SYSTEM 78 SOLAR POWER AND BATTERY
: : : :
EJ/CTOC/6.7.13
0
09/10/12 6 OF 8
EJJV Sign
CTOC Sign
Measure solar input supply no. 4 Measure solar input supply no. 5 Turn on circuit breaker no. 4 Check indicating light on controller Turn on rectifier supply to controller Check indicating light on controller Ensure relay r1 is energized Measure load output Connect in battery input to controller Check battery voltage signal to controller Check battery temp signal to controller Turn off rectifier supply to controller Ensure relay r1 is still energized Measure load output
CTOC
(307013-W)
PROVISION OF DE-PRESERVATION, RETESTING / RE-COMMISSIONING AND START-UP OF CKC REMOTE GAS PLATFORM SYSTEM NO. 78-00 : SOLAR POWER AND BATTERY
: : : :
EJ/CTOC/6.7.13
0
09/10/12 7 OF 8
COVERTER (CKC-DC-7852) SYSTEM 78 SOLAR POWER AND BATTERY Measure input supply to converter Measure output supply from converter EJJV Sign CTOC Sign
POWER DISTRIBUTION BOARD (CKC-DB-7851) SYSTEM 78 SOLAR POWER AND BATTERY Measure incoming supply to DB Check voltage reading on voltmeter Turn on CB 2 Measure outgoing voltage Turn on CB 3 Measure outgoing voltage Turn on CB 4 Put selector switch on manual Simulate on condition Ensure relay R1 and contactor C1 is energized EJJV Sign CTOC Sign
CTOC
(307013-W)
PROVISION OF DE-PRESERVATION, RETESTING / RE-COMMISSIONING AND START-UP OF CKC REMOTE GAS PLATFORM SYSTEM NO. 78-00 : SOLAR POWER AND BATTERY SYSTEM 78 SOLAR POWER AND BATTERY
: : : :
EJ/CTOC/6.7.13
0
09/10/12 8 OF 8
EJJV Sign
CTOC Sign
Put selector switch to auto Simulate on condition Ensure relay R1 and contactor C1 is energized Turn on CB 5 Measure outgoing voltage Turn on CB 6 Measure outgoing voltage Turn on CB 7 Measure outgoing voltage