Non-conformance Report & CPAP ( In-process / Final insp.

Stage )
Date Product Details Machine 22-10-2012 NCR No. NCR-CC/001/12-13

Hex Fittings supplied in 2009 Operation Shift Operator

Problem Details

Date Supervisor Non-conforming Qty. 25% of the Lot Supplied

The Screwed caps are not interchangeable with Body. Also the Caps Problem Observed ( Pl. specify NC Qty. are not mating with each other freely. & problem details Action Taken The material was already supplied long back and hence Date Remarks & sign

Immediate Corrective Action is planned to ensure that the Non Action Conformance is not repeated.

Action Taken

Date

Remarks & sign

Investigatio n of cause quantity of Order was not high, we did not prepare gauges for the Female and Male threads. The Inspection of & Corrective threads on both the Body and Caps was done with the Action
help of Thread Slip Gauges. To Order for new gauges for thread Inspection. Action Taken Henceforth all the threads are to be compulsarily

Since the Hex Fittings were new product for us and the

21-10-2012

Piyush.

Date

Remarks & sign

Preventive inspected with the help of Gauges only. Action

01-11-2012

Piyush.

Review of Corrective & Preventive Actions


The review of the CAPA will be done once we receive the Order from the Customer.

Signature

Format No. :- F/QC 02/00