You are on page 1of 2

EXCAVATION METHODS

STATE OF OHI DEPARTMENT OF TRANSPORTATI O ON

Original Ground

Finished Ground

TRENCH DIMENSIONS
MATERIAL Long Span SW 2 WIDTH (W) Span+2(2)

Conduit 2X Span

Conduit 2X Span

Concrete
Side Width (SW) Typ. Span Span Side Width (SW) Typ.

0.165 X Span

1.33 X Span

Metal & Plastic

0.5 + 0.125 X Span

1.25 X Span + 1

REVISIONS

7-19-02 1-21-05 4-21-06

Original Ground

+ Depth

Use Structural Backfill Type 1, 2, or 3 per CMS 603. Use Embankment per CMS 603.

ALL METRI DI C MENSI ONS

ROADWAY HYDRAULI C ENGI NEER

Depth

Conduit Span is the horizontal distance from outside wall to outside wall or outside corrugation measured Minimum Constructed Embankment at the widest point of the conduit. Conduit Rise is the vertical distance from outside wall to outside wall or outside corrugation measured
f cheek

at the middle of the conduit. All dimensions are in feet unless specified.

STRUC TURA L D M -1. 4 C O ND UI T I S T A LLA T I N N O

1 2- SEP- 2008 1 26PM 2:

Trench Width (W)

Trench Width (W)

Trench Width as Detailed in Plans Use Type 3 Bedding for 706.01, 706.02, or 706.03 Type C & D Conduits Conduit Use Type 4 Bedding for Type E & F Conduits

Conduit
I \ pr Const ucton Dr : \ r i awi ngs\ SCD\ Hy aul dr i cs\ DM \ dm 1 4_ apr 06_ V8. dgn

Conduit*

*706.05 or 706.051 and 706.052 on Slab Bottoms

0.30 X Rise (Min.)

6 Min.

Depth = 3 Min. for All 706 Conduits 6 Min. for All Other Conduits

1/3 W

1/3 W

1/3 W

1/3 W

1/3 W

1/3 W

TYPE 1 BEDDING
Structural Backfill

TYPE 2 BEDDING

TYPE 3 & 4 BEDDING

The Middle 1/3 W Under the Conduit Shall Be Uncompacted

Scarify and Loosen the Middle Type 3 Bedding


SCD NUMBER

1/3 W Under the Conduit for

STANDARD HYDRAULI CONSTRUCTI C ON DRAWI NG

Use Type 2 Bedding for Type A, B, C & D Conduits Except for Long Span and Conduits Requiring Type 3 Bedding.

Ri se

O FFI E C

BEDDING TYPES

EN G I EERI G N N

OF

OTHERWI SE NOTED.

METHOD A-CUT

METHOD B-FILL

I MI N LLI METERS UNLESS

( I BRACKETS [ ) ARE N ]

J Stai s . n

Trench Width (W)

0.5X Span

Trench Width (W)

NOTES

STATE HYDRAULI ENGI C NEER

BACKFILL CONDITIONS

STATE OF OHI DEPARTMENT OF TRANSPORTATI O ON

Trench Width (W)

Trench Width (W)

Original Ground

Lesser of 1 X Span or 4 (Typ.)

Trench Width (W)

Conduit Conduit 2 Min. * Embankment Fill to Top of Conduit 4 Min. *

Conduit 12 Min.

Span

Span

Span

REVISIONS

7-19-02 1-21-05

Original Ground

Original Ground

4-21-06

2 Min.

ALL METRI DI C MENSI ONS

I MI N LLI METERS UNLESS

( I BRACKETS [ ) ARE N ]

* Fill to Subgrade Elevation if Less Than Min.

0.5 X Span (Typ.) + Depth 2 Min. 2 Min.

Depth

LONG SPAN-FILL

LONG SPAN-CUT

** PLASTIC CONDUIT, TYPE C & D -FILL

** For All Other Type C & D Conduits Place & Compact Backfill on Top of Bedding.
f cheek

STRUC TURA L D M -1. 4 C O ND UI T I S T A LLA T I N N O

1 2- SEP- 2008 1 26PM 2:

Lesser of 1 X Span or 4 (Typ.)

Trench Width (W)

Original Ground

Original Ground

Conduit

Conduit 2 Min. Conduit 4 Min. * 12 Min.


STANDARD HYDRAULI CONSTRUCTI C ON DRAWI NG

I \ pr Const ucton Dr : \ r i awi ngs\ SCD\ Hy aul dr i cs\ DM \ dm 1 4_ apr 06_ V8. dgn

Span

Span

Span

Original Ground

0.5 X Span (Typ.) + Depth

Depth

CONDUIT, TYPE A & B-FILL

CONDUIT TYPE A & B-CUT

** PLASTIC CONDUIT, TYPE C-CUT

- Construction Embankment

NOTES
Backfill Conduits per CMS 603.

- Structural Backfill

SCD NUMBER

EN G I EERI G N N

O FFI E C

OF

OTHERWI SE NOTED.

J Stai s . n

ROADWAY HYDRAULI C ENGI NEER

STATE HYDRAULI ENGI C NEER

You might also like