Professional Documents
Culture Documents
BQ
BQ
L/S L/S
3000
00
3000 L/S
00
3000
00
12000
00
BQ 2: SITE CLEARING
BIL DESCRIPTION Site clearing A To provide labour, transport, all tools and equipments and to clear all plant materials from existing planter bed and to cart away and to clean up the work area to the satisfaction and approval of the Employer or Employers Representative. To provide labour, transport, all tools and equipments and to B excavate existing soil from the planter bed and cart away and to clean up the work area to the satisfaction and approval of the Employer or Employers Representative. Work shall also include rectification works to the existing planter bed. L/S 3000 00 UNIT QUANTITY RATE AMOUNT
L/S
4000
00
TOTAL
7000
00
BIL
DESCRIPTION
UNIT
QUANTITY
RATE
AMOUNT
Plant Materials To supply nursery grown plant materials listed below, transport to site and provide labour for planting as indicated in the drawing. Rates by the contractor shall include the following:
RM
RM
Soil Mixture Supply, deliver, unload and spread soil mixture, compose of one part of good approved organic matter/ compost and three parts of approved topsoil into planter bed as indicated in the drawing. The soil mixture should be well- mixed. Trees (1.0 x 1.0 x 1.0 m) Palm (1.0 x 1.0 x1.0m) Shrub (0.3 x 0.3 x 0.3m) Groundcover (0.15 x 0.15 x 0.15m) TOTAL
m3 m3 m3 m3
57 9 2245 60
00 00 00 00 00
BIL
DESCRIPTION
UNIT
QUANTITY
RATE
AMOUNT
C Crusher Run for Drainage Supply, deliver, unload and spread crusher run into planter boxes as drainage layer between 75-100mm thick (20mm dia. average size.)
RM
RM
17500
00
D Filter Membrane To provide geotextile filter membrane terram or equivalent (to Landscape Architects approval) on top of crusher run layer in all planter boxes.
40000
00
TOTAL
57500
00
BIL
DESCRIPTION This Bills of Quantities shall be read in conjunction with Specification and Preambles
UNIT
QUANTITY
RATE
AMOUNT
RM
RM
Trees 1. Bucida molineti 2. Citrus aurantifolia 3. Citrus hystrix 4. Eugenia oleina 5. Michelia champaca 6. Mussaenda phillipica Aurorae 7. Magnifera indica 8. Plumeria rubra 9. Tabebuai penthaphylla TOTAL 8 3 11 5 6 2 3 6 13 150.00 5.00 5.00 70.00 120.00 30.00 20.00 120.00 120.00 1200 15 55 5350 720 60 60 720 1560 9880 00 00 00 00 00 00 00 00 00 00
AMOUNT
RM
RM
Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos
10.00 10.00 5.00 3.00 5.00 5.00 8.00 8.00 5.00 5.00 5.00 8.00 5.00 5.00 6.00
900 3100 150 420 300 450 1440 4160 850 35 300 144 1100 550 1440
00 00 00 00 00 00 00 00 00 00 00 00 00 00 00
6. Etlingera elatior E 7. Hymenocaulis carribea 8. Ixora japonica 9. Kaemfera galangal linn 10. Murraya koenigii 11. Murraya paniculata 12. Ochna kirkii
13. Ophipogun jaburan
60
4.00
240 15579
00 00
BQ 4: COMPUSORY MAINTENANCE
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
Compulsory Maintenance. A To provide all labor, tools, equipment, transport, etc and carry out maintenance in all planted areas for 12 months. L/S
2500 00
Maintenance shall include but not necessarily be limited to watering, weeding, pruning, fertilizing, spraying and clearing of unnecessary growth.etc and any other horticultural management as directed but the S.O or S.Os representative as necessary for the proper growth of plants.
L/S
2500
00
C From the time planting until the end of maintenance period, the landscape constructor is required to replace dead, dying or missing plants, or those severely damaged by pests or diseases to the original sizes of the plants due to the replaced and true to types at the contractors own coasts as and when directed by the S.O or TOTAL
L/S
4000
00
9000
00
RATE
AMOUNT
This Bills of Quantities shall be read in conjunction with Specification and Preambles Hard landscape items To provide all labour, tools, equipment, transport, etc. and carry out maintenance in all process in finish the work and built the gazebo, pergola, stage and pavement around the side.
RM
RM
I. Pergola (14.0 m x 6.0m) II. Gazebo ( 5.0m x 5.0m) III. Pedestrian walkway (1.5m width) IV. Fish Pond (2.0 m x 4.0m) V. Planter Box VI. Wooden Table and Seating VII. Rabbits Hut (4.0m x 2.0m) VIII. Birds Cage (3.0m x 2.0m) TOTAL
L/S
3000.00
3000
00
3
165m
00 00 00 00 00 00 00
2 1 1
23250
00