Activity ID

Activity Description

Orig % Dur Comp

Early Start

Target 1 Early Start

Early Finish

Predecessors 25

2011 JUL 1 8 15 AUG 22 29 5 SEP 12

Engineering
Project Management Plans & Tech Spec
A012 A019 Subtotal Technical Specification development Technical Specification submittal 5 0 5 50 27JUL11 0 40 27JUL11 27JUL11 27JUL11 29JUL11 01AUG11 01AUG11 A04* A012*

Fire Fighting System


Basic Design
A014 A033 A045 A015 A016 A017 A018 A021 A028 A022 A034 Subtotal Collection of Site Data/Desktop review/ROW Survy Request for information to ASCO Reply from ASCO for RFI Code Comparison & Compliance Requirements Assessment of Hazards for Protection Finalize Design Basis Calculation of Fire Water Requirements Development of Fire Water PFD Development of Preliminary layout (PL) Fire Water Network Hydraulics Development of Preliminary Pipe support layout 2 0 4 4 2 2 5 3 3 3 2 0 0 27JUL11A 0 0 29JUL11 0 03AUG11 0 03AUG11 0 05AUG11 0 05AUG11 0 11AUG11 0 11AUG11 0 15AUG11 0 15AUG11 0 29JUL11 03AUG11 03AUG11 05AUG11 05AUG11 11AUG11 11AUG11 15AUG11 15AUG11 27JUL11A 28JUL11 28JUL11 02AUG11 06AUG11 04AUG11 06AUG11 10AUG11 13AUG11 13AUG11 17AUG11 16AUG11 17AUG11 A01* A014* A033* A045* A045* A016*, A045 A017* A018* A018*, A045 A028* A028* Development of Preliminary Pipe support layout Assessment of Hazards for Protection Finalize Design Basis Calculation of Fire Water Requirements Development of Fire Water PFD Development of Preliminary layout (PL) Fire Water Network Hydraulics Collection of Site Data/Desktop review/ROW Survy Request for information to ASCO Reply from ASCO for RFI

E&I Design
A035 A036 A037 Subtotal Subtotal Subtotal Fire Alarm Philosophy Fire Alarm Zoning F&G Detector Coverage Drawing & Specs 3 3 7 13 0 0 0 05AUG11 0 09AUG11 0 12AUG11 0 05AUG11 0 4 05AUG11 09AUG11 12AUG11 05AUG11 08AUG11 11AUG11 19AUG11 19AUG11 19AUG11 19AUG11 A016* A035* A036* F&G Detector Coverage Drawing & Specs Fire Alarm Philosophy Fire Alarm Zoning

Start Date Finish Date Data Date Run Date

27JUL11 30SEP11 27JUL11 15AUG11 14:01

Early Bar Float Bar Progress Bar Critical Activity

ASCO - AFFS

Sheet 1 of 1

Arab Steel CO ASCO Fire Fighting System TSML Engineering

Date 29JUL11 01AUG11

Revision Revision A Revision B (Revised as Per ASCO Comments)

Checked

Approved

Primavera Systems, Inc.