Professional Documents
Culture Documents
Project Management
Project Controls
Regulatory / HSE Compliance
Engineering - General
Process Engineering
Mechanical Engineering
Plant Layout and Piping
Civil, Structural, Architectural
Electrical
Quality Assurance
general comments
Description
Plot Plan
Location Plans
Equipment Location Plans
Utility Station Location Plan
Safety Equipment Location Plan
Underground Piping and Utility Plan +OPEN &CLOSED DRAIN
Indices and Lists
Standard Piping Support Drawing Index
Special Pipe Support Drawings Index
Tie-In List
3D CADD Piping Model
Pipe and Fittings Material Take-Off (MTO)
Valve Material Take-Off (MTO)
Other Piping Drawings
Vessel Nozzle and Platform Orientation Draw
Piping Plans
Piping Standard Detail Drawings
Pipe Support Standard Drawings
PL&P Datasheets (Pipe Supports, Spring Hangers, etc
Line Classes
Engineering Work Packages (PL&P)
Structural Design Criteria
Civil, Structural Calculations
CSA Studies
Geotechnical Investigation
Building List
Civil, Structural, Architectural Drawings
Topographical Map
Site Preparation and Rough Grading Drawing
Composite U/G Drawings
Foundation Drawings TANKS AND LLI
Standard Civil, Structural & Architectural Det
3D CADD C/S/A Model
Civil Material Take-Off (MTO)
It is written in the civil engineering scope of work " Develop and issue modifications to accommodate for the demolished
pond
From (discussions
Sump/newwith pondEng.
) " ,Mohamed
Ennpi to clarify
Abdelwhat does, ititismean
Hamied by this
noticed thatsentence.
Ennpi doesn't have the latest soil investigation
report that had been issued in 2017 by IACG consultant / GIOGROUP ( definitely the report would be delivered to Ennpi ),
Based on the report The new tanks foundations might need to be rested on piles , or in case of that the number of bore
No
holestruck scaleplaces
or their study is required
will for this project.
not be convenient to Ennpi there will be a need to execute additional bore holes.
There is nothing refers to Backfilling for the area of the storm water pond and the material to be used.
There is nothing refers to studying the existing RFT concrete pavement that surrounding the existing ballast water tanks ,
taking
There isinto consideration
nothing refers to how to use
studying thethe same
rain pavement
water to surround
surface drainage theditches
open new tanks
. without fully removal of pavement.
Calculations
Instrumentation, Controls, Automation Studies
Instrument Index
Instrument Database
I/O List & Allocation Table
Cause & Effect Diagram / Shutdown Key
Alarm & Shutdown Setting Summary
Process Logic & Complex Control Narrative
Instrumentation, Controls, Automation Drawings
Communication Network Layout Drawings
MCC Building Layout
Instrument Location Drawings
Instrument Loop Diagrams
Marshalling / Control Panel / Cabinet Layout
Junction Box / Panel Layout / Wiring Drawing
Gas Detection System Layout Drawings
Fire Alarm System Layout Drawings
Control Room Layout / Analyzer Shelter Layo
Standard Instrumentation Installation Detail
Bulk Instrumentation, Controls, Automation Materia
Instrumentation, Controls, Automation Datasheets
Material Requisitions
Inspection and Testing Plans (ITP)
Technical Bid Evaluation
Vendor / Shop Documents & Drawings
Process Control System Configuration & Programmi
PLC / Fire and Gas Functional Specificati
Logic Programming
Alarm Configuration
Electrical Design Criteria
Standards and Specifications
Electrical Calculations
Electrical Studies
Electrical Equipment List
Area Classification Data Sheet Records
Indices and Lists
Cable Schedule
Electrical Load Lists
Lighting Panel Schedule
Area Classification Drawings
Single Line Diagrams
Electrical Equipment and Building Layout Dra
Motor Control Schematics
Power and Control Layout Drawings
Lighting /LIGTHING + CATHODIC PROTECTION Layout Drawings
Grounding Layout Drawings
Power Layout Drawings
Standard Electrical Installation Detail Drawin
Wiring Diagrams
3D CADD Electrical Model
Bulk Electrical Material Take-Off (MTO)
Electrical Datasheets
Material Requisitions