Shawn Kenny, Ph.D., P.Eng. Assistant Professor Faculty of Engineering and Applied Science Memorial University of Newfoundland spkenny@engr.mun.ca
Lecture 15 Objective
to examine engineering models to analyse geotechnical loads, pipeline/soil interaction and structural load effects for offshore pipelines
Overview
Geotechnical Loads
Pipeline/Soil Interaction
Design Considerations
Installation
Rock dump Thermal expansion Lateral and upheaval buckling On-bottom stability
2008 S. Kenny, Ph.D., P.Eng.
Operations
Seabed Surveys
Remote sensing In-situ testing and sample recovery Index and laboratory testing Soil type Strength parameters Loaddisplacement behaviour
Ref: BCOG (2001) 2008 S. Kenny, Ph.D., P.Eng. ENGI 8673 Subsea Pipeline Engineering Lecture 15
Key Issues
Pipeline/Soil Interaction
Engineering Tools
Guidance documents
Design Checks
Limit States
SLS ULS
Stress
Combined loading
criteria
Strain
Axial
Transverse Lateral
Vertical Upward
Vertical Downward
Ref: ALA (2001) 2008 S. Kenny, Ph.D., P.Eng. ENGI 8673 Subsea Pipeline Engineering Lecture 15
Trench Effects
10
Buried Performance
Thermal
Flow assurance
Mechanical
Uplift, flotation, subsidence during pipe lay Upheaval buckling during operations Ref: C-CORE
11
Example 15-01
Calculate the virtual anchor point, axial strain and end deflection due to thermal expansion for a buried pipeline Design condition
Partial restraint
Winter 2008
Example 15-01 Calculate the anchor point, axial strain and end deflection due to thermal expansion for a buried offshore pipeline located outside the 500m excursion limit. DEFINED UNITS MPa := 10 Pa
6
kPa := 10 Pa
GPa := 10 Pa
C := K
kN := 10 N
PIPELINE SYSTEM PARAMETERS Nominal Outside Diameter Initial Selection Nominal Wall Thickness (Sec.5 C203 Table 5-3) External Corrosion Protection Coating Thickness Fabrication Process (Sec.7 B300 Table 7-1) [SMLS, HFW, SAW] Corrosion Allowance (Sec.6 D203) Elastic Modulus Specified Minimum Yield Stress (Sec.7 B300 Table 7-5) Speciifed Minimum Tensile Stress (Sec.7 B300 Table 7-5) Coefficient of Thermal Expansion Poisson's Ratio Pipeline Route Length Linepipe Density Concrete Coating Thickness Concrete Coating Density OPERATATIONAL PARAMETERS API Gravity Product Contents Density cont := 1000 kg m
3
Do := 273.1mm tnom := 9.525mm tcpc := 0mm FAB := "SMLS" tcorr := 3mm E := 205GPa SMYS := 450MPa SMTS := 535MPa T := 1.15 10 := 0.3 Lp := 25km tc := 50mm s := 7850kg m c := 3050kg m
3 5 1
API := 38
kg
Design Pressure (Gauge) Safety Class (Sec.2 C200-C400) [L, M, H] Design Pressure Reference Level Temperature Differential Maximum Water Depth Seawater Density Hydrotest Fluid Density
w := 1025kg m t := 1025kg m
3/3/2008
Page 1 of 5
Winter 2008
GEOTECHNICAL PARAMETERS Undrained Shear Strength Adhesion Factor Cu := 25kPa soil := 0.25
DNV OS-F101 PARTIAL FACTORS AND DESIGN PARAMETERS System Operations Incidental/Design Pressure Factor (Sec.3 B304) System Test Incidental/Design Pressure Factor (Sec.3 B304) Material Resistance Factor (Sec.5 C205 Table 5-4) Safety Class Resistance Factor (Sec.5 C206 Table 5-5) Material Strength Factor (Sec.5 C306 Table 5-6) Maximum Fabrication Factor (Sec.5 C307 Table 5-7) fab := 1.00 if FAB = "SMLS" 0.93 if FAB = "HFW" 0.85 if FAB = "SAW" fab = 1.00 inc_o := 1.10 inc_t := 1.00 m := 1.15 SC := 1.138 U := 0.96
3/3/2008
Page 2 of 5
Winter 2008
Diameter Fabrication Tolerance(Sec.7 G200 Table 7-17) Do := max( 0.5mm , 0.0075 Do) if FAB = "SMLS" Do 610mm 0.01 Do if FAB = "SMLS" Do > 610mm min( max( 0.5mm , 0.0075 Do) , 3.2mm) if FAB = "HFW" Do 610mm min( 0.005 Do , 3.2mm) if FAB = "HFW" Do > 610mm min( max( 0.5mm , 0.0075 Do) , 3.2mm) if FAB = "SAW" Do 610mm min( 0.005 Do , 3.2mm) if FAB = "SAW" Do > 610mm Wall Thickness Fabrication Tolerance(Sec.7 G307 Table 7-18) tfab := 0.5mm if FAB = "SMLS" tnom 4mm 0.125 tnom if FAB = "SMLS" tnom > 4mm 0.125 tnom if FAB = "SMLS" tnom 10mm 0.100 tnom if FAB = "SMLS" tnom 25mm 3mm if FAB = "SMLS" tnom 30mm 0.4mm if FAB = "HFW" tnom 6mm 0.7mm if FAB = "HFW" tnom > 6mm 1.0mm if FAB = "HFW" tnom > 15mm 0.5mm if FAB = "SAW" tnom 6mm 0.7mm if FAB = "SAW" tnom > 6mm 1.0mm if FAB = "SAW" tnom > 10mm 1.0mm if FAB = "SAW" tnom > 20mm Material Derating (Sec.5 C300 Figure 2) SMYS := 0MPa if T < 50C SMYS = 10.00 MPa tfab = 1.191 mm Do = 2.048 mm
Winter 2008
ENGINEERING ANALYSIS PIPELINE GEOMETRIC PROPERTIES Inside Pipeline Diameter (Operations Case) Di_o := Do 2. tcorr 2. tfab Inside Pipeline Radius (Operations Case) Ri_o := 0.5 Di_o Effective Outside Pipeline Diameter De := Do + 2. tcpc + 2. tc Pipeline Steel Area Ast := 4 Do ( Do 2 tnom)
2 2
Di_o = 264.72 mm
Ri_o = 132.36 mm
De = 373.10 mm
Ast = 7.89 10 mm
Concrete Area Ac := 4
( Do + 2 tc) Do
2 2
Ac = 5.08 10 mm
Ae = 1.09 10 mm
Ai = 5.50 10 mm
BUOYANCY FORCE (per meter basis) BF := g m ( w Ae c Ac s Ast) Buoyancy Force Check BFchk := "NEGATIVE BUOYANCY" if BF < 0 "FLOTATION" otherwise External Hydrostatic Pressure Pe := w g h l HOOP STRESS (THIN WALL THEORY) h := 2 ( tnom tcorr tfab) Pd Di_o Pe Do h = 248.13 MPa Pe = 0.00 MPa BFchk = "NEGATIVE BUOYANCY" BF = 1.03 kN
SOIL RESISTANCE PARAMETERS Soil Axial Restraint per Unit Length (Eqn B-1 ALA 2001 f := De Cu soil
3/3/2008 3 1
f = 7.33 10 N m
Page 4 of 5
Winter 2008
Distance to Virtual Anchor Point - Assumes constant temperature (conservative) - Equation 9 of Palmer and Ling (1981) OTC4067 Pd Ri_o f
2
z :=
1 2 +
2 tnom Pd Ri_o
E T T
z = 157.51 m
Virtual Anchor Length Check zchk := "VIRTUAL ANCHOR OK" if z < 0.5 Lp "RECALCULATE" otherwise COMBINED STRESS STATE Axial End Displacement end :=
2 fz Pd Ri_o ( 1 2 ) + T z T 4 E Ri_o tnom 2 E tnom
end = 56 mm
Axial End Displacement [Equation 12 - Palmer and Ling (1981) OTC 4067]
Palmer = 56 mm
Axial Stress (For X < Z) x 75 := 0.75 z l_75 := Pd Ri_o 2tnom f 2 Ri_o tnom x 75 l_75 = 39.77 MPa
eqchk :=
"EQUIVALENT STRESS OK" if eq < 0.9 SMYS "INCREASE WALL THICKNESS" otherwise
3/3/2008
Page 5 of 5
Reading List
http://www.fugro.com/survey/offshore/gcs.asp ALA (2001). Guideline for the Design of Buried Steel Pipe. July 2001, 83p. [2001_ALA_Design_Guideline.pdf] Cathie, D.N., Jaeck, C., Ballard, J.-C. and Wintgens, J.-F. (2005). Pipeline geotechnics state-of-the-art. Frontiers in Offshore Geotechnics, ISFOG, ISBN 0 415 39063 X, pp.95-114 [2005_Cathie_PSI.pdf] Palmer, A.C. and Ling, M.T.S. (1981). Movements of Submarine Pipelines Close to Platforms. Proc., OTC, OTC 4067, pp.17-24. Palmer, A.C., Ellinas, C.P., Richards, D.M. and Guijt, J. Design of Submarine Pipelines Against Upheaval Buckling. Proc., OTC, OTC 6335, pp.551-560.
18
References
http://en.wikipedia.org/wiki/Geotechnical_engineering http://en.wikipedia.org/wiki/Soil_mechanics BCOG (2001). BC Offshore Oil & Gas Technology Update, JWEL Project No. BCV50229, October 19, 2001 DNV (2007). Submarine Pipeline Systems. Offshore Standard, DNV OS-F101, October 2007, 240p. Langley, D. (2005). A Resourceful Industry Lands the Serpent, Journal of Petroleum Technology, 57(10), 6p. Phillips, R. A. Nobahar and J. Zhou (2004). Trench effects on pipe-soil interaction. Proc. IPC, IPC 04-0141, 7p.
19