You are on page 1of 1

Create a material for RTP with material type: LEIH in MM01. -For eg.

Cylinder for Oxygen --Now create PO for Oxygen gas thru ME21N --In MIGO, while receiving Oxygen gas, select the 'Transport equipment' in the tool bar (find it between Item overview and Item detail area). In the second line item receive this with the movement type 501M Please note you receive oxygen gas with mvt ty 101. --In OMS2 ensure the LEIH is checked for qty basis. Post MIGO --check this stock in MB53 (returnable) --send back this mtl to vendor thru mvt ty 502M

MMBE stock overivew you can see all the status of the material like pending p.o. qty, qm lot,stock transfer order pending etc.

In MB53 is nothing but MD04 requirements only plant stock availability. you can see the consumption of the material monthwise both are different

You might also like