RPS Planning & Development Brighton Office O:\B_Jobs\4061s\Schedule 4\050310\4061_Sch4_Response_190310.doc March 2010 Rev0
JAS4061
Energy from Waste with Combined Heat and Power Facility, Oxwellmains
Blank
Energy from Waste with Combined Heat and Power Facility, Oxwellmains
Figure 1
Runcorn EfW facility Waste Reception Hall & Bunker Cross Section
RPS Planning & Development Brighton Office O:\B_Jobs\4061s\Schedule 4\050310\4061_Sch4_Response_190310.doc March 2010 Rev0
JAS4061
Energy from Waste with Combined Heat and Power Facility, Oxwellmains
Blank
Energy from Waste with Combined Heat and Power Facility, Oxwellmains
Figure 2
RPS Planning & Development Brighton Office O:\B_Jobs\4061s\Schedule 4\050310\4061_Sch4_Response_190310.doc March 2010 Rev0
JAS4061
Energy from Waste with Combined Heat and Power Facility, Oxwellmains
Blank
Energy from Waste with Combined Heat and Power Facility, Oxwellmains
Figure 3
RPS Planning & Development Brighton Office O:\B_Jobs\4061s\Schedule 4\050310\4061_Sch4_Response_190310.doc March 2010 Rev0
JAS4061
Energy from Waste with Combined Heat and Power Facility, Oxwellmains
Blank
Domestic Use 924 m3/yr Wash water from dirty" areas Feed water tank 200 m3/yr Wash water storage tank / contaminated water pit Wash water from clean areas 200 m3/yr Surface water Roof water Perimeter drains Will be added when rainwater less than 11,007 m3/yr Oil separator 27,630 m3/yr Bottom ash discharger Boiler blow down vessel 1,124 m3/yr Evaporation 8,876 m3/yr 4,618 m3/yr Incinerator Boiler Bag filter
Storage vessel
Stack
27,600 m3/yr
Water Out Zero flow under normal conditions, flow only expected in the event of abnormal operations e.g. boiler cleaning
TITLE:
FIGURE:3i (Figure 8 in original PPC application) Viridor Waste Management Limited Energy from Waste with Combined Heat and Power Facility, Oxwellmains.
Notes 1. 2. 3. 4. 5. 6. 7. 8. Raw water from public supply is used both as domestic water and process water. Wash water from cleaning of "clean" process rooms (such as the turbine building) is taken from the raw water supply and subsequently discharged to the process water tank. Rain water from paved areas, roofs and building perimeter drains is fed through a treatment of swales, porous paviours and stone filled trenches prior to the rainwater tank or to the detention basin on site. The rainwater tank will top up the process water tank. The process water storage tank also receives water from boiler blow down. The process water is used for quenching the hot bottom ash, whilst most water will remain as moisture within the bottom ash some evaporative loss will occur. Any water draining from the bottom ash will be recycled for re-use in the quench water system. Wash water from dirtier process areas such as the flue gas cleaning building and the bottom ash bunker is stored in the wash water storage tank. The wash water is used in the bottom ash discharger. Waste water from the boiler water treatment plant is led to the process storage tank. Water Balance is based on a dry system.
TITLE:
FIGURE: 3ii Viridor Waste Management Limited Energy from Waste with Combined Heat and Power Facility, Oxwellmains
Energy from Waste with Combined Heat and Power Facility, Oxwellmains
Figure 4
RPS Planning & Development Brighton Office O:\B_Jobs\4061s\Schedule 4\050310\4061_Sch4_Response_190310.doc March 2010 Rev0
JAS4061
Energy from Waste with Combined Heat and Power Facility, Oxwellmains
Blank
Energy from Waste with Combined Heat and Power Facility, Oxwellmains
Appendix A
RPS Planning & Development Brighton Office O:\B_Jobs\4061s\Schedule 4\050310\4061_Sch4_Response_190310.doc March 2010 Rev0
JAS4061
furnace
grate siftings
bottom ash
Features Straightforward construction Electromechanical drive No contact with waste fail-safe closing system
Advantages Reduced investment Limited power consumption Less wear and maintenance Safety
furnace
grate siftings
bottom ash
Features Water-cooled chute, active cooling Cold compensator Constructed in wear resistant material Robust construction
Advantages Safety Airtight, reliable Reduced maintenance costs Long life time
SEGHERSmulti-stage grate
turbine deNOx boiler steam electric power air condenser
furnace
grate siftings
bottom ash
Features Modular construction Multi-stage Independent double motion control Special tile construction
Advantages Shortest erection time Best control leads to high throughputs Controlled combustion, good burn-out Long life time, reduced maint. costs
Furnace
turbine deNOx boiler steam electric power air condenser
furnace
grate siftings
bottom ash
Features Independent movements per element Independent air injection per element Full access to all controls and instruments
Advantages Stabilised steam flow, higher energy production Ease of maintenance and operation
Post-combustion
turbine deNOx boiler steam electric power air condenser
lime milk waste Secondary air Secondary semi-wet reactor air active carbon bag house
furnace
grate siftings
bottom ash
Features CFD modelling DeNOx optimisation Secondary air injection optimisation Gas flow pattern optimisation
Advantages 850C/2s (dioxin destruction) Better energy recovery Reduced reactive consumption Better gas burnout
Ash extractor
turbine deNOx boiler steam electric power air condenser
furnace
grate siftings
bottom ash
DeNOx SNCR
turbine deNOx boiler steam electric power air condenser
furnace
grate siftings
bottom ash
Features Non-catalytic Controlled injection at several levels High temperature NOx reduction
Advantages Reduced investment cost Min. reaction product consumption Reduced energy consumption
Combustion air
turbine deNOx boiler steam electric power air condenser
Burner
furnace
grate siftings
bottom ash
Features Multiple primary air fans Secondary air injection at several levels Frequency controlled fans
Advantages Optimised combustion air control Max. energy production Minimum electricity consumption High availability
Steam boiler
turbine deNOx boiler steam electric power air condenser
furnace
grate siftings
bottom ash
Features Horizontal boiler T before final superheater < 650C Steam conditions 400C/40 bara Controlled specifications
Advantages High availability Min. maintenance costs Min. corrosion problems High quality
Boiler cleaning
turbine deNOx boiler steam electric power air condenser
furnace
grate siftings
bottom ash
Advantages Efficient cleaning Reduced dioxin production Increased steam production Reduced maintenance costs