Page no:

Client: NPCIL KAPS


Date of inspection: 19.4.2012
Location: Bay no.04 SUT-1, CB-04
Ambient Temperature: 42.8C
Load current: 30A
Sr.no.
1
2
3
4
5
6
7
8
9

Details of connector
SUT-1 HV Bushing clamp
CT-TB side clamp
CT-CB side clamp
CT dropper CB side clamp
DS -13 TB side clamp
DS-13 power contact
DS-13 CB side clamp
CB-04 top connection
CB-04 Bottom connection

R phase
56.3
53.5
53.2
54.3
54.9
54.5
54.1
55.1
55.3

Y phase
55.5
52.6
53.7
54.6
54.5
55.0
55.2
55.5
55.8

B phase
56.6
52.5
54.6
54.1
54.8
55.6
54.2
56.4
55.2

10

DS-11 to Bay bus joint clamp TB side

57.4

57.5

56.4

53.6

56.6

57.3

53.4
51.5
52.9
55.4

54.3
54.0
55.7
55.9

54.2
54.3
55.4
55.3

Bay bus to Bus-2 dropper jumper


clamp
12
DS-12 Bus joint TB side Clamp
13
DS-12 power contact
14
DS -12 to bay bus-2 joint clamp
15
DS-11 To Droper Jumper Clamp
Note: Above given readings are in degree Celsius.
11

Remark

You might also like