PROJECT

CC5 Recovery

EQUIPMENT TYPE

15-Jul-13

HORIZONTAL PRESSURE VESSELS

ITEM NAME
NEW EQUIPMENT COST
IC5 REFLUX ACCUM., Horiz., 12'-0" ID X 28'-0"
$62,500
NC5 REFLUX ACCUM. Horiz., 10'-0" ID X 25'-0"
$57,000
CC5 REFLUX ACCUM. Horiz. 6'-0" ID X 12'-0"
$21,000

---------$140,500

TOTAL
USED EQUIPMENT CREDIT

$0

ASSOCIATED COSTS
MATERIALS

FACTOR

PIPING
CONCRETE
STEEL
INSTRUMENTS
ELECTRICAL
INSULATION
PAINT

42.0
8.0
0.0
7.0
6.0
6.0
0.7

TOTAL ASSOCIATED COSTS, MATERIAL


LABOR
LABOR

$59,010
$11,240
$0
$9,835
$8,430
$8,430
$984
---------$97,929

FACTOR
65.0

TOTAL ASSOCIATED COSTS

$91,325
---------$189,254

==========
$329,754

TOTAL DIRECT COSTS

INDIRECT COSTS

COST

34.0

$112,116

18000000

16000000

14000000

12000000

10000000

8000000

6000000

4000000

2000000

0
SALES TAX AND
FREIGHT

OUTSIDE ENGINEERING

TOTAL PROJECT
INSTALLED COST