COST BREAK DOWN FORM

REV PROJECT NO. : PROJECT NAME : DEMOLISH & INSTALL NEW ABSORBER/SCRUBBER CLIENT : VNT PLC. A-CONSTRUCTION COST ITEM 1 2 3 4 6 7 8 9 10 11 12 DESCRIPTION DIS/RE CONNECTION PIPE &ACC DIS/RE STEEL STRUCTURE&ACC FOR OPENING REMOVE INTERNAL PART INSTALL NEW INTERNAL PART CAL SHEET STIFFNESS STR. (SIGN BY PRO. ENGINEER) REMOVE ABSORBER/SCRUBBER INSTALL NEW ABSORBER/SCRUBBER EQUIPMENT & TOOL LIFTING DEVICE SAFETY COST(Include Gas detector) CONFINED SPACE WORK(TRAIN&DIAGNOSE) QTY 1 1 1 1 1 2 2 1 1 1 1 UNIT JOB JOB JOB JOB LOT SETS SETS LOT LOT JOB JOB UNIT PRICE TOTAL PRICE 126,000 156,000 98,000 98,000 45,000 120,000 100,000 164,000 55,000 65,000 32,500.00 126,000 156,000 98,000 98,000 45,000 240,000 200,000 164,000 55,000 65,000 32,500 DATE:

0
5/26/2011

SUB TOTAL COST PLUS OPT GRAND TOTAL COST SCOPE OF WORK -REMOVE & INSTALLATION NEW ABSORBBER/SCRUBBER -REMOVE & INSTALLATION INTERNAL PART -COST INCLUDE LABOUR/EQUIPMENT/TOOL -DIRECT MATERAIL&COMPONENT BY. VNT. -INSTRUMENT/ELECTRICAL DISCONNECT BY. VNT -SCAFFOLDING INSTALL BY. VNT -MATERIAL STIFFNESS STEEL STRUCTURE BY. CCK NOTE: 12%

1,279,500 153,540 1,433,040

PROJECT : REMOVE / REINSTALL ABS&SNB CLIENT ; VNT PLC. BILL OF MATERAIL FOR MODIFY STEEL STRUCTURE NO 1 2 3 4 5 DESCRIPTION H150x150x7x10 L=6 M H250x125x6x9 L=6 M C150x75x6.5X10 L=6 M L75x75x9 L =6M PL 12x4'X8' QTY 9 3 5 4 1 UNIT PCS PCS PCS PCS PCS REMARK

You might also like