DEVELOPMENT OF SECOND PHASE ASH DYKE A T SGTPS, BIRSINGHPUR COMPLIANCE REPORT FOR PIPE SCHEDULE EEPL DOCUMENT NO.

EEPL - MPPGCL - M -P-1014


S.NO 1. ENERGO COMPLAINCE There was a typographical error in pipe schedule for recovery water pipes thickness.

Page 1 of 1

REV-2

As per IS 3589, we hereby revising the thickness of Recovery Water Pipe Size from 200 NB to 600 NB and M/s Energo shall take the system guarantee for recovery water piping with all tolerances mentioned in IS 3589. 2. Sleeve coupling shall be provided as per specification which shall not exceed 50M .

TITLE : COMP LIANCE REPORT FOR P IP E SCHEDULE ENERGO ENGINEERING PROJECTS LTD.