1. DOCUMENT LIST : AIS or GIS SUBSTATION Provisional Drawing List at Tender Stage : SENDING STATUS FA : For Approval FI : For Information (stick to the contractual specification) FINAL STATUS AB : As Built - Updating after Erection & Commissioning from hand markedup FD : Final Drawing - Not subject to revision but included into Final Documentation and OMM STATUS FOR RECORDING AP Document and drawings Approved AC Document and drawings Approved with Comment NA Document and drawings Not Approved
2.3 Item Designation Code Application of IEC international standard (IEC 61346-1 ; & IEC 61346-2 and Letter codes of IEC 750 Table E.1). Single-level reference designation assigned to an object shall consist of a prefix signs followed either by : a letter code a letter code followed by a number a number The characters used in the prefix signs to be used to indicate a reference designation shall be : ( = ) when relating to the function aspect of the object ( - ) when relating to the product aspect of the object ( + ) when relating to the location aspect of the object Example of Single Level Reference