You are on page 1of 1

S.

No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 PSW

LIST OF PPAP ELEMENTS Requirement Remark Design Records of Saleable Product and Change documents Customer engineering approval, if required Design FMEA Process Flow Diagrams Process FMEA Dimensional Results Material Test Results Performance Test Results Initial Process Study Measurement System Analysis Studies Control Plan Appearance Approval Report (AAR), If applicable Bill of material (BOM) Master Sample Checking Aids Records of Compliance with CustomerSpecific Requirements Laboratory Documentation Packaging Specification imds to be kept at svil end NOT APPLICABLE rubber tc, mat tc SST report NOT APPLICABLE To be reviewed at SVIL end

Format

drawings

To be reviewed at SVIL end

You might also like