EM 10 NBEncinas Adjunct Professor Mining Engineering University of the Phiippines

GOD LOVES YOU - John 3:16

1. Production 2. Production Rate 3. Production Efficiency 4. Availability 5. Utility 6. Capacity 7. Rated Capacity 8. Swell Factor 9. Bucket Fill Factor 10. Cycle

GOD LOVES YOU - John 3:16

1. Determine required production 2. Determine reach or haul path 3. Calculate cycle time 4. Calculate capacity 5. Iterate to improve productivity 6. Calculate fleet size 7. Iterate to reduce owning and operating costs

GOD LOVES YOU - John 3:16

Type of Mineral: Copper Porphyry Copper Grade: 1% Gold Grade: 1 gram per tonne Ore Reserve: 1,000,000,000 tonnes

GOD LOVES YOU - John 3:16

1,000,000,000 tonnes Design Mine Life: 50 years Ore Production Per Annum: 20,000,000 tonnes Stripping Ratio: 2:1 Waste Material Moved: 40,000,000 tonnes per annum Monthly Rates:
Ore: 1,666,667 tonnes Waste: 3,333,333 tonnes

GOD LOVES YOU - John 3:16

Daily
Ore: 555,555 tonnes Waste: 1,111,111 tonnes

Hourly
Ore: 23,148 tonnes Waste: 46,296 tonnes

GOD LOVES YOU - John 3:16

Power Shovels
30 cubic meters 20 cubic meters

Dump Trucks
350 tonnes 300 tonnes 250 tonnes

GOD LOVES YOU - John 3:16

Determinants
Cycle Time Bucket Size

Sample
Assume cycle time: 60 seconds Calculations:

GOD LOVES YOU - John 3:16

Cycle Time: 20 minutes Available Truck Capacity:


350 Tonnes 300 Tonnes 250 Tonnes

GOD LOVES YOU - John 3:16

Loading: Digging Cycle


Load bucket Swing bucket Dump bucket Swing empty

Hauling
Trip to dumpsite Return trip to minesite

GOD LOVES YOU - John 3:16

The silver is mine, and the gold is mine, declares the LORD of hosts. (Haggai 2:8)

GOD LOVES YOU - John 3:16

Revelation 3:20
Behold, I stand at the door and knock. If anyone hears my voice and opens the door, I will come into him and eat with him, and he with me.

GOD LOVES YOU - John 3:16