3.0 KOSITEMITEMKERJA 3.

4 CONCRETEWORKS PURATAKADARHARGAKERJA BAGITAHUN 2008 2009 (RM) (RM) *PURATAKADARHARGA KERJA (RM)

BIL

KETERANGANKERJA

UNIT

A 1 2 3 B 1

InsituConcrete ConcreteGrade10asblinding ConcreteGrade15asblinding ConcreteGrade20asblinding ReinforcedConcrete ReinforcedconcreteGrade20inbases, footing,pilecapsorgroundslabs

M3 M3 M3

200.00 187.00 226.67

200.00 200.00

200.00 194.00 227.00

M3

200.00

200.00

200.00

ReinforcedconcreteGrade25in structure ReinforcedconcreteGrade30inpile caps ReinforcedconcreteGrade30in structure ReinforcedconcreteGrade35in structure ReinforcedconcreteGrade40in structure BarReinforcement Mildsteelbarreinforcement;6mm diameter Mildsteelbarreinforcement;10mm diameter

M3

220.00

220.00

220.00

M3

250.00

250.00

250.00

M3

280.00

280.00

280.00

M3

297.00

300.00

299.00

M3

300.00

300.00

C 1

KG

2.80

2.80

3.00

KG

2.99

2.98

3.00

*PurataKeseluruhan(roundedup)yangditetapkan

13

3.0 KOSITEMITEMKERJA 3.4 CONCRETEWORKS PURATAKADARHARGAKERJA BAGITAHUN 2008 2009 (RM) (RM) 3.25 3.33 *PURATAKADARHARGA KERJA (RM) 3.00

BIL

KETERANGANKERJA

UNIT

Mildsteelbarreinforcement;16mm diameter Hightensilebarreinforcement;10mm diameter Hightensilebarreinforcement;12mm diameter Hightensilebarreinforcement;16mm diameter Hightensilebarreinforcement;20mm diameter FabricReinforcement SteelfabricreinforcementBMCA10 SteelfabricreinforcementBMCA6 SteelfabricreinforcementBRCA7 SteelfabricreinforcementBRCA8 Formwork Sawnformworktosidesandsoffitof beam Sawnformworktosidesofwall Sawnformworktowall,slabsorbeams

KG

KG

3.33

3.30

3.00

KG

3.93

3.83

4.00

KG

3.94

3.15

4.00

KG

3.83

3.30

4.00

D 1 2 3 4 E 1

M2 M2 M2 M2

32.22 13.30 20.00 19.40

25.00 13.30 20.00 19.40

29.00 13.00 20.00 20.00

M2

33.50

40.00

37.00

2 3

M2 M2

32.00 35.22

32.67 32.50

32.00 34.00

Fairfinishformworktosidesandsoffitof beam Fairfinishformworktosidesofwall

M2

26.50

26.50

27.00

M2

42.80

39.50

41.00

*PurataKeseluruhan(roundedup)yangditetapkan

14

3.0 KOSITEMITEMKERJA 3.4 CONCRETEWORKS PURATAKADARHARGAKERJA BAGITAHUN 2008 2009 (RM) (RM) *PURATAKADARHARGA KERJA (RM)

BIL

KETERANGANKERJA

UNIT

F 1

PrecastConcrete Precastconcretebeamcompletewith reinforcement,formwork,jointsand finishes

65.00

65.00

*PurataKeseluruhan(roundedup)yangditetapkan