4 CONCRETEWORKS PURATAKADARHARGAKERJA BAGITAHUN 2008 2009 (RM) (RM) *PURATAKADARHARGA KERJA (RM)
BIL
KETERANGANKERJA
UNIT
A 1 2 3 B 1
M3 M3 M3
200.00 200.00
M3
200.00
200.00
200.00
ReinforcedconcreteGrade25in structure ReinforcedconcreteGrade30inpile caps ReinforcedconcreteGrade30in structure ReinforcedconcreteGrade35in structure ReinforcedconcreteGrade40in structure BarReinforcement Mildsteelbarreinforcement;6mm diameter Mildsteelbarreinforcement;10mm diameter
M3
220.00
220.00
220.00
M3
250.00
250.00
250.00
M3
280.00
280.00
280.00
M3
297.00
300.00
299.00
M3
300.00
300.00
C 1
KG
2.80
2.80
3.00
KG
2.99
2.98
3.00
*PurataKeseluruhan(roundedup)yangditetapkan
13
3.0 KOSITEMITEMKERJA 3.4 CONCRETEWORKS PURATAKADARHARGAKERJA BAGITAHUN 2008 2009 (RM) (RM) 3.25 3.33 *PURATAKADARHARGA KERJA (RM) 3.00
BIL
KETERANGANKERJA
UNIT
Mildsteelbarreinforcement;16mm diameter Hightensilebarreinforcement;10mm diameter Hightensilebarreinforcement;12mm diameter Hightensilebarreinforcement;16mm diameter Hightensilebarreinforcement;20mm diameter FabricReinforcement SteelfabricreinforcementBMCA10 SteelfabricreinforcementBMCA6 SteelfabricreinforcementBRCA7 SteelfabricreinforcementBRCA8 Formwork Sawnformworktosidesandsoffitof beam Sawnformworktosidesofwall Sawnformworktowall,slabsorbeams
KG
KG
3.33
3.30
3.00
KG
3.93
3.83
4.00
KG
3.94
3.15
4.00
KG
3.83
3.30
4.00
D 1 2 3 4 E 1
M2 M2 M2 M2
M2
33.50
40.00
37.00
2 3
M2 M2
32.00 35.22
32.67 32.50
32.00 34.00
M2
26.50
26.50
27.00
M2
42.80
39.50
41.00
*PurataKeseluruhan(roundedup)yangditetapkan
14
3.0 KOSITEMITEMKERJA 3.4 CONCRETEWORKS PURATAKADARHARGAKERJA BAGITAHUN 2008 2009 (RM) (RM) *PURATAKADARHARGA KERJA (RM)
BIL
KETERANGANKERJA
UNIT
F 1
65.00
65.00
*PurataKeseluruhan(roundedup)yangditetapkan
15