Project Item No. Light Base Oil Feed Exchanger E-101 Service Light Base Oil Feed Exchanger Project No. STBE for Establishment By
Step 1. Input flows, conditions and properties data for shellside and tubeside. Tube Used Lube Oil 14,925.1 68 163.4 54.765 92.989 0.605 861,007 0.095 0.004 1426.38 Uncorrected MTD Corrected MTD Side Fluid Name Flow (M), lb/h o Temp. in, F o Temp. out, F 3 r, lb/ft m, cP cp, Btu/lboF Q, Btu/h k, Btu/hftoF R, ft2hoF/Btu cpm/k 143.6 108.3
o o
Step 4. Start configuring the exchanger. Begin with the total transfer coefficients to this point (i.e., not including shellside Shell Light Base Oil 4,854.5 392 150.8 51.3158 8.767 0.613 717,769 0.1098 0.004 118.44 F F Step 5. Select tube arrangement and estimate shell diameter
Av. Density Av. Viscosity Av. Heat Capacity Heat Exchanged Av. Thermal Conductivity Fouling Resistance Prandtl No.
Step 2. Input tubing OD, BWG and length (can be trial and error).
Tube OD BWG Tube ID, d = Tube Length, L = Flow area per tube, at = Effective transfer area per tube =
Tubes/pass = lb/h per tube = Av. velocity, fps = Tubeside Reynolds No., NRe = Tubeside Friction Factor, f = DP per pass, psi = Nusselt number, Nr = Inside Film Coefficient, hi =
Step 6. Check tubeside velocity and DP, shellside DP. If too adjust tube length, number of tubes per pass, number of pa required.
Step 4. Start configuring the exchanger. Begin with the total calculated transfer coefficients to this point (i.e., not including shellside h): Ustart = 72 On that basis, assumed Uo = Then the required transfer A = Number of tubes required = Reset tubes/pass (Step 3), then no. of passes = Total tube count = Tubeside DP (incl. returns) = Actual effective transfer area, A = 20 398 253 2 258 0.036 405
BWG/Tube Wall Thicknesses 8 0.165 9 0.148 0.017 10 0.134 0.014 11 12 13 14 15 16 0.120 0.109 0.095 0.083 0.072 0.065 0.014 0.011 0.014 0.012 0.011 0.007
2 o
psi ft2
MTD Correction Factors R = ( T1 - T2 ) / ( t2 - t1 ) = 2.528 0.294 2.719 2.761 1.762 0.161 0.754
1 Sqr 21 5 18 0.182 0.9476 26,631 240 0.00421 0.027 8.1 55 31.2 35.9% 41.6
Shell ID from Tube Count Tables Select Baffle Spacing Number of Baffles = Flow Area across Bundle, as = Equivalent Diameter, de (see table) = Mass Velocity, Gs = Shellside Reynolds No., NRe = Shellside Friction Factor = Shellside DP = Outside Transfer Factor, jh = Outside Film Coefficient, ho = Calculated Uo = Check: % difference, Ucalc. vs Uassum. = Uclean =
( R2 + 1 ) =
)=
2 - S ( R + 1 + ( R2 + 1 ) ) = psi FT =
Step 6. Check tubeside velocity and DP, shellside DP. If too high or too low, adjust tube length, number of tubes per pass, number of passes, and/or shell baffle spacing. Remember to reset shell diameter from tube count tables, as required.